This is a Scope of Work for the replacement of defective dry sprinkler system valves at U.S. Coast Guard Station Washington Buildings 91 and 92 located at JBAB, 3870 Giovannoli St SW, Washington DC, 20032. The contractor must provide all labor, materials, equipment, and supervision to remove and replace dry sprinkler system valves in both buildings, replace trim kits for both systems, test and reset both systems including draining residual water, and clear all trouble alarms from the fire detection system. Work must commence no later than seven (7) days after notice to proceed and be completed and ready for use within twenty-one (21) working days after contract award. The contracting officer's QA Evaluator representative and point of contact is MKC James Tooker at 202-591-5944; all bidders are strongly encouraged to conduct a site visit to field verify quantities before submitting bids.
The contractor is responsible for obtaining all required permits, licenses, and appointments without additional government expense and must comply with all applicable federal, state, and local laws. Work shall be accomplished using best standard practices by experienced workers and supervised by experienced personnel, with daily cleanup required and the jobsite left in a clean and neat manner. Contractor personnel and vehicles must be identified and approved prior to work commencement, with detailed employee information provided five (5) days before starting work. The contractor must abide by all federal safety regulations (29 CFR 1910 and 1926 series), submit written safety programs to the Base Safety Officer for review, and provide written notification to the Station Safety Officer for activities affecting fire suppression systems or introducing hazardous materials. Environmental compliance with 40 CFR and contractor-specific environmental management programs must be reviewed by the Environmental Protection Specialist prior to starting work, with contractors responsible for disposing of all hazardous materials used in accordance with federal, state, and local guidelines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_Answers for Station Washington Sprinkler System.pdf | ||
| Sta Washington 12a. RFQ Schedule 30252PR2600000131.pdf | ||
| Pricing Spreadsheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to replace defective dry sprinkler system valves at U.S. Coast Guard Station Washington Buildings 91 and 92 located on JBAB, 3870 Giovannoli St SW, Washington DC, 20032.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT seven (7) days after notice to proceed and work diligently to complete the entire work ready for use by twenty-one (21) working days after contract award.
3. SCOPE OF WORK: Contractor shall provide all labor, materials, equipment, and supervision to:
a. Remove and replace the dry sprinkler system valves in the BLDG 91 and BLDG 92 sprinkler systems.
b. Replace the trim kits for both systems.
c. Test and reset both dry sprinkler systems, including draining any residual water.
d. Clear all trouble alarms associated with the sprinkler system from the fire detection system.
4. SITE VISIT: All bidders are strongly encouraged to visit the site to field verify any/all quantities before submitting bids. Interested parties shall plan for a site visit MKC James Tooker @ 202-591-5944.
5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE:
The designated contracting officer’s QAE representative and Point of Contact for this project is MKC James Tooker @ 202-591-5944. Inquiries concerning any phase of the specification before or after award shall be made to MKC James Tooker.
6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.
7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.
8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.
10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state, and local laws.
11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.
12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station’s regular hours, they may submit their request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.
13. UPON COMPLETION OF WORK: Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.
14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The Station Washington Security Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.
15. SAFETY REQUIREMENTS:
1. Responsibilities:
a. All contractors working on Station Washington shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR
1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.
b. Written notification must be provided to the Station Safety Officer, James Tooker 202- 591-5944 in their capacity as Station Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Station, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Station Safety Officer.
c. Copies of the following must be provided to the Station Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits.
Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work.
d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on JBAB. A station authorized representative is required for all contractor Lock Out/Tag Out needs.
2. Rights: a. Every employee working on Station Washington has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work.
QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.
16. ENVIRONMENTAL PROTECTION REQUIREMENTS:
a. All contractors working on Station Washington shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series).
Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist, Chris Ollice (757.483.8593 or C 757.373.2558) prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit Environmental Guide.
b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Station Annapolis. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment
c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Safety Data Sheets, permits, and notices of intent.
d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.