SOW STA Washington Bldg 92 Berthing Water Damage Repairs_2025.pdf
PDF 129 KB Posted
- Solicitation number
- 70Z0G825QBNCR0008
About this file
This is a Statement of Work (SOW) for water damage repairs at U.S. Coast Guard Station Washington, Building 92 located on Joint Base Anacostia-Bolling in Washington, DC. The project requires the contractor to provide labor, materials, and equipment to repair and install new flooring, insulation, drywall, lighting, and paint on the second floor, specifically in the hallway, closet, duty room, and bathroom. The scope includes installing approximately 900 square feet of 30mil waterproof LVP flooring, 40 linear feet of baseboards, 2000 square feet of drywall, replacement LED lighting, a new bathroom exhaust fan, and painting.
The contract is set aside for small businesses under NAICS code 238310, with a business size standard of $19.0 million. The project has a tight timeline, requiring the contractor to commence work within seven days of the notice to proceed and complete all work within 21 working days after contract award. Quotes must be submitted by noon Eastern Time on April 8, 2025, via email to Samuel.T.Salerno@uscg.mil. Site visits are not mandatory but strongly encouraged, and interested parties can contact MKC Jason Seraphin at (202)-591-5944 to schedule a visit. The government anticipates awarding a firm-fixed-price contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Floor Plans.pdf | ||
| Q and A for Solicitation 70Z0G825QBNCR0008.pdf | ||
| SAM - Davis Bacon Act DC20250002.pdf | ||
| 70Z0G825QBNCR0008-1442.pdf | ||
| FAR Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2/25/2025
SCOPE OF WORK
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to repair and install flooring, insulation, drywall including walls and ceiling previously removed due to water damage at U.S. Coast Guard Station Washington Building, 92 located on JBAB, 3870 Giovannoli St SW, Washington DC, 20032.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT seven (7) days after notice to proceed and work diligently to complete the entire work ready for use by twenty-one (21) working days after contract award.
3. SCOPE OF WORK: Contractor shall provide all labor, materials, equipment, and supervision to repair and install new flooring on the second-floor hallway, install new batt fiberglass insulation, drywall and paint walls & ceiling in the hall wall, closet and duty room including bathroom from previous water damage remediation.
a. Install new 2nd level hallway flooring with 30mil LVP (waterproof), approximately 900 square feet. Old flooring already removed/disposed.
b. Install new baseboards and ¼ round shoe molding on the 2nd level, approximately 40 linear feet.
c. Install new drywall where the walls and ceiling were opened up / removed from previous damage on the 2nd level, approximately 2000 square feet. Includes filling the rest of the wall cavity with batt fiberglass insulation, corner beading, taping and joint compound.
d. Install replacement LED lighting in the hallway, duty room and bathroom on the 2nd level only where water damage was present.
e. Replace bathroom exhaust fan and motion sensor, 2nd level, duty bathroom only where water damage was present.
f. Paint, interior latex with primer, white, on all repair work with the walls and ceiling.
4. SITE VISIT: All bidders are strongly encouraged to visit the site to field verify any/all quantities before submitting bids. Interested parties shall plan for a site visit MKC Jason Seraphin @ 202-591-5944.
5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE)
REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is MKC Jason Seraphin @ 202-591-5944. Inquiries concerning any phase of the specification before or after award shall be made to MKC Jason Seraphin.
6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.
7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.
8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.
10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state, and local laws.
11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.
12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station’s regular hours, he may submit his request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.
13. UPON COMPLETION OF WORK: Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.
14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The Station Washington Security Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.
15. SAFETY REQUIREMENTS:
1. Responsibilities:
a. All contractors working on Station Washington shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.
b. Written notification must be provided to the Station Safety Officer, Jason Seraphin 202-591-5944 in their capacity as Station Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Station, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Station Safety Officer.
c. Copies of the following must be provided to the Station Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work.
Hot work will only be conducted with permission and a fire watch must be posted during work.
d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on JBAB. A station authorized representative is required for all contractor Lock Out/Tag Out needs.
2. Rights:
a. Every employee working on Station Washington has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work.
QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.
16. ENVIRONMENTAL PROTECTION REQUIREMENTS:
a. All contractors working on Station Washington shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist, Chris Ollice (757.483.8593 or C 757.373.2558) prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit Environmental Guide.
b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Station Annapolis.
Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.
c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Safety Data Sheets, permits, and notices of intent.
d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to repair and install flooring, insulation, drywall including walls and ceiling previously removed due to water damage at U.S. Coast Guard Station ...
File details come from the government source that posted it. Updated .