This is a Statement of Work (SOW) for the installation of eyewash stations and potable water piping at U.S. Coast Guard Station Venice, Louisiana. The Department of Homeland Security is seeking a qualified contractor to install four stainless steel potable water-supplied eyewash stations with emergency shower capability, two commercial marine grade self-retracting 50-foot water hose reels, and to remove old potable water piping while installing new copper potable water piping (approximately 150 feet total). Eyewash stations will be located on the pier, under the main building, next to the hazmat storage shed, and under the ANT building, each supplied by different water sources including existing PVC pipe, external hose spigot, underground PVC line, and new potable water piping respectively. All piping must be insulated to prevent freezing, with shut-off valves and drain valves installed at specified locations. The contractor must provide all labor, materials, and equipment unless otherwise noted, and all materials and equipment must be submitted for Contracting Officer's Representative (COR) approval prior to procurement.

The solicitation is issued as a Request for Quotation (RFQ 30336Q260000013) with a firm-fixed price contract award based on lowest price, technically acceptable. This is a small business set-aside under NAICS code 238220 with a 16.5 million dollar size standard. The required delivery is 60 days after contract award. Contractors must be registered in System for Award Management (SAM.gov), conduct field visits to examine existing conditions, submit a consolidated list of personnel with identification numbers prior to work commencement, and notify the COR one week before starting work. The contractor must comply with OSHA safety standards, provide a written safety plan, maintain a clean work site with daily cleanups, and coordinate all construction efforts with COR MK1 Ricky Gonzales (Ricky.j.gonzales@uscg.mil, 504-915-6986). The project location is U.S. Coast Guard Station Venice, 436 Coast Guard Road, Venice, Louisiana 70091, and work must be scheduled to minimize interference with normal facility operations (8:00 a.m. to 4:00 p.m., Monday through Friday, excluding federal holidays).

View the file

Other files

File Type Posted
la52.docx DOCX document
Construction Clauses.2026.docx DOCX document
Constructions.Solicitation.docx DOCX document
SF1442-14b.solicitation.offer.and.award.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

STATION VENICE, LA

SPECIFICATIONS

FOR

Eye Wash Stations & Potable Water Piping

General: United States Coast Guard Station Venice is accepting proposals for qualified individuals or firms to complete instillation of four potable water supplied eye wash stations, two commercial marine grade self-retracting hose reels, and removal of old potable water piping on pier and installing new potable water piping. Instillation locations of eye wash stations will be one on the pier, one under the main building, one next to the hazmat storage, and one under the ANT Building. The eye wash station under the ANT building will be supplied by ¾” PVC pipe that is located inside the wall. Access will be through a 12” X 12” access plate. The eye wash station under the main building will be supplied by an external hose spicket. The eye wash station next to the hazmat storage shed will be supplied by an underground ¾” PVC water line. The last and final eye wash station that will be located on the pier will be supplied by the new potable water pipe. The total length of potable water piping is estimated at approx. 150 Ft long. The new potable water piping installed on pier will be tied into existing copper potable water pipe under the pier. Pipping will rise above the pier and run down the pier via installed unit strut structure to the eye wash station and two contractor supplied commercial marine grade hose reels. Contractor shall install a shut off valve at the foot of the pier and a drain valve to drain the water piping in the event of a freeze. All eye wash stations and hose reels shall have shut off valves on water supply lines. The eye wash station and hose reels on pier shall have drain valves installed at lowest part of drop downs. All potable water pipping must be the same size, type, and material that is currently under the pier. All piping exposed to elements shall be insulated to prevent freezing, including eye wash station pipping. The eye wash station and hose reels must be submitted to the COR and approved before procurement. Prior to submitting a quote, it is mandatory to examine the scope of work, and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Station Venice.

Location:

United States Coast Guard Station Venice.

436 Coast Guard Rd. Venice, LA 70091

I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 8:00am to 4:00pm Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative.

II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work.

III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities.

MK1 Ricky Gonzales
Ricky.j.gonzales@uscg.mil
504-915-6986

IV: Recycling and Disposal of Refuse: All disposals shall be done in accordance with federal, state, and local laws and regulations. All bulk waste, to include old drywall, deteriorated frame wood, screws, etc shall be disposed of in contractor provided dumpsters.

V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations.

VI. Inspection: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor.

VII. Operations and Storage: The contractor is to take whatever steps necessary to ensure that their materials are protected. The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard or its members will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation that may be in and around the work sites. Any damage shall be repaired at the contractor’s expense.

VIII. Contractor Identification: The contractor and subcontractor personnel shall, at all times, wear company identification.

IX. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during demolition or work throughout the project at no additional cost to the Government.

X: Regulations while onboard Coast Guard Station Venice:

1. Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flagpole & maintain silence and all vehicles & equipment will halt during these brief events.

2. The work site shall be maintained in a clean condition at all times. This includes daily clean-ups of the work and storage areas. The site shall be well lit and well barricaded/cordoned off as appropriate.

3. Absolutely no firearms or weapons of any kind are allowed onboard Station Venice.

4. Only American citizens and permanent resident aliens are allowed onboard Station Venice Facilities. Absolutely no foreign nationals are permitted on the premises.

5. Notice shall be given to the Coast Guard’s representative 1 week in advance of any planned power, water, and sewage or lighting outages.

6. The contractor shall provide a consolidated list of all contracted personnel including their driver’s license numbers (or other valid gov’t issued ID number) who will be working on Facilities either the day of or prior to the notice to proceed date.

7. Should warnings of gale force or stronger winds, or other inbound natural disasters be issued, the contractor shall take every practicable precaution to minimize the danger to persons, to the work, and the adjacent property. These precautions shall include closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolding, securing field trailers, and other appropriate equipment and other temporary work.

8. No personnel other than the contracting officer has the authority to alter the terms of any contract or to issue any change orders.

9. All contractor vehicles, equipment and gear onboard Coast Guard properties are subject to search at all times. Additionally at all times due to security and operational needs, the contractors are subject to orders to evacuate the property at any time.

10. Due to the nature of operations & support functions ongoing on-board Station Venice, all efforts within reason to minimize the size and footprint of the contractor’s lay down area shall be taken. The boat ramp, government vehicles, and small boats shall not be obstructed or blocked.

VIII: SCOPE OF WORK: All materials are subject to COR approval prior to execution. The contractor shall discuss plans to complete the project with COR to create a schedule of areas to be worked on to minimize disruption of operations and current crew sleeping quarters. The contractor shall provide all labor, materials, and equipment necessary to complete the following unless noted below:

A. Base Bid

1. Contractor shall provide 04 Stainless steel potable water supplied eye wash stations with emergency eye wash and shower. All pipping must be insulated.

2. Eye wash stations must be installed in locations mentioned above.

3. Contractor shall tie the eye wash stations into potable water piping near by using same material and size piping. All piping shall be insulated. Each eye wash station shall have a shut off valve. Eye wash station on pier shall have a drain valve on drop down.

4. Old potable water piping under pier shall be removed.

5. Install new same size copper insulated piping above pier.

6. Install a shut off valve near foot of pier.

7. Install a easily accessible drain valve at lowest portion of pipe to drain piping in event of hard freeze.

8. Install two drops in potable water piping for hose spickets. One near end of pier and one near start of boat house. Drops should be equipped with hose spicket valve and a drain valve at lowest point.

9. Install two contractor supplied commercial marine grade stainless steel 50’ water hose reels on pier.

10. Required delivery 60 days after award.

11. Contractor shall protect all equipment and merchandise in work locations.

12. All work must be approved by the Contracting Officer’s Representative.

Reference Pictures: Pictures are examples only. Contractor must coordinate with COR with exact location and route of new potable water pipping.

ANT Building Eye Wash Station Location

ANT Building Water Supply

Hazmat Storage Eye Wash Station Location

Hazmat storage water supply underground ¾” PVC

Eye Wash Under Main Building Location

Main building water supply

Eye Wash and Hose Reel #1 Pier Location

Hose Reel #2 Location

Potable Water Pipe Run

Under Pier Potable Water Pipe Connection Location

Pipe Rise Location with Shut Off Valve and Drain valve

Project Overview

Eye wash stations are green and hose reels are dark blue image1.jpg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg