This is a Scope of Work specification document for the City of Atlanta's Department of Watershed Management detailing requirements for color video pipeline inspection and water/sewer cleaner equipment procurement. The specification establishes minimum acceptable requirements for furnishing, installation, training, preventive maintenance, inspection, and repair services across eight classified groups: color video pipeline inspection systems, lateral launch systems, push camera inspection systems, chassis with custom build-out, chassis-mounted sewer combination equipment, repair services and parts, preventive maintenance and warranty, and PipeLogix software licensing and support. Bidders must demonstrate capability to supply 90 percent of required parts within 24 hours and access remaining 10 percent within 72 hours. All equipment must be currently in production, manufacturer's standard models with all standard equipment included. The specification requires bidders to provide a minimum of four hours of instruction on proper and safe equipment use at the bidder's expense, complete parts and service manuals upon request, and original manufacturer part crossover numbers prior to equipment delivery. Training must include pre-startup classroom instruction completed at least 14 days prior to startup and post-startup training within seven days of startup completion.
Warranty coverage must include one year after delivery date with prompt replacement of damaged or inferior items during the warranty period. Bidders must submit pricing information indicating discount schedules applicable to the City of Atlanta and must meet or beat store, municipal, state, and federal pricing for all bid items. Payment terms are specified at five percent discount for payment within 10 days or net 30 calendar days from invoice date. The specification mandates delivery of stock equipment within 14 business days or less, with a five percent daily discount penalty for late delivery absent force majeure events. Bidders must provide annual itemized reports of purchases to the Chief Procurement Officer within 15 days of the contract anniversary date, with failure to submit resulting in forfeiture of future City contracts. All bidders must clearly identify manufacturer/trade names and identifying numbers in pricing lines, and any proposed substitutions must include supporting literature and samples within seven days if required by the City. Successful bidders must own or have full access to a fully functional machine shop and field service equipment and must employ qualified, certified personnel capable of performing inspections and repairs at City facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Policy Statement DRAFT Color Video and Pipel.docx | DOCX document | |
| Appendix B.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Type: Color Video Pipeline Inspection Equipment Item Number: 8406475 CITY OF ATLANTA SPECIFICATION COLOR VIDEO PIPELINE INSPECTION AND WATER/ SEWER CLEANER EQUIPMENT, REPAIRS, MAINTENANCE, AND SOFTWARE
SCOPE AND CLASSIFICATION - PART I
Scope - This specification describes the minimum acceptable requirements for furnishing, installation, training, preventive maintenance, inspection and repair of color video pipeline inspection and sewer cleaner equipment for the City of Atlanta, Department of Watershed Management. Please refer to Scope and Classification – Part II.
Classification - The material(s) must be classified as follows:
| GROUP |
| I |
| COLOR VIDEO PIPELINE INSPECTION SYSTEM |
| GROUP |
| II |
| LATERAL LAUNCH SYSTEM |
| GROUP |
| III |
| PUSH CAMERA INSPECTION SYSTEM |
| GROUP |
| IV |
| CHASSIS WITH CUSTOM BUILD-OUT |
| GROUP |
| V |
| CHASSIS MOUNTED SEWER COMBINATION |
| GROUP |
| VI |
| REPAIR, SERVICES AND PARTS |
| GROUP |
| VII |
| PREVENTIVE MAINTENANCE/WARRANTY |
| GROUP |
| VIII |
| PIPELOGIX SOFTWARE LICENSE AND SUPPORT |
SPECIFICATION REQUIREMENTS
1. Definitions
1.1. “Parts” means the components of a unit to be provided by a Preferred Bidder to the City of Atlanta.
1.2. “Pricing Line” means the separate pricing that the Bidder submits for each line-item bid.
1.3. “Service” means the furnishing of labor, time, or effort to repair or rebuild an entire unit or part(s) of a unit.
2. Standards And Specifications – Material(s), goods, Parts or Service(s) being solicited under this IFB must comply with the Federal Occupational Safety and Health Acts, Federal Aviation
Rev. 08.22.25
Administration Standards, and Georgia Occupational Safety and Health Act requirements, where applicable and in effect at time of delivery.
3. Equipment. The equipment to be furnished must be currently on production and must be manufacturer's standard model complete with all standard equipment. Bidder must be able to supply 90% of Parts required to maintain this equipment within 24 hours and have access to the remaining 10% of Parts within 72 hours. Failure to meet this requirement may result in termination of the contract. To the extent applicable, and except as otherwise expressly provided in this IFB, all energy consuming equipment purchased will be energy efficient, defined as meeting either Energy Star specification of criteria that puts products in the upper 25% of energy efficiency, as well as meeting quality, performance, and durability requirements.
4. Parts and Service Warranty. This Invitation for Bid (IFB) must cover Parts and Service warranty for one (1) year after delivery date. While under warranty, Bidder must replace any damaged or inferior item in a prompt and timely manner. Bidder must submit price information for Parts and Service indicating schedule or rate of discount, which must apply to the City of Atlanta.
5. Original Manufacturer Part Crossover Numbers. Bidder must supply original manufacturer part crossover numbers for parts that are not manufactured by the equipment manufacturer after the award of bid, but prior to the delivery of equipment.
6. Safe Use of Equipment. Bidder (where applicable) must provide a minimum of four (4) hours instruction on the proper and safe use of the equipment at the Bidder’s expense.
7. Manuals. Upon request by the City, Bidder must provide parts, service, and operating manuals for each unit of equipment provided and submit electronically, one (1) set of descriptive literature.
8. Without expressed or implied obligation on the part of the City of Atlanta to perform, the Bidder may submit on a separate sheet an option to the City for a multi-year purchase concept covering three (3) years’ service and parts for equipment covered by its bid. Include the terms of the multi-year purchase option including terms, price, and expiration date.
8.1. The Code of Ordinance of the City of Atlanta specifically prohibits obligating the City for future budget years.
8.2. In the event options are exercised to purchase units in subsequent years, the provisions as related to parts and services will apply as indicated above.
9. Reservation of Rights. The City of Atlanta reserves the right to increase or decrease quantities shown without penalty.
10. Report of Purchases. Bidder must provide an itemized report of the annual spend (“Report of Purchases”) to the Chief Procurement Officer. The Report of Purchases must be submitted annually within fifteen (15) days after the anniversary date of the Agreement. Failure to submit a Report of Purchases may result in forfeiture of future contracts with the City of Atlanta.
11. Brand Name or Trade Name Instructions. If items in this IFB have been identified, described, or referenced by a brand name or trade name description, such identification is intended to be descriptive, but not restrictive and is to indicate the quality and characteristics of products that may be offered. Products may be considered for award if such products are clearly identified in the bids and are determined by the City of Atlanta to meet its needs in all respects.
11.1. All bidders, including bidders whose products may be referenced, must clearly indicate manufacturer/trade name and identifying number in space provided within Pricing Line of this IFB.
11.2. Bidder must not furnish obsolete and/or near-expired products. If the Bidder proposes to furnish another product, such products must be clearly identified in the bid. The evaluation of bids and the determination as to equality of products offered must be the responsibility of the City and will be based on information furnished by the bidder. Accordingly, to ensure that sufficient information is available the bidder may be required to submit literature and/or samples prior to award. These must be supplied within seven (7) days, if required.
11.3. The purchase of any item by the City, as a result of this Invitation for Bid, is not a judgment of one product against another. Consideration of application, need, and price will constitute purchase determination.
12. Like or Similar Goods. Bidder is only permitted to provide like or similar goods or services to those identified in its bid, if the goods or services identified in the bid are discontinued or out of stock. Vendor must provide like or similar goods or services at the same price(s) quoted in its bid. The City will not absorb any cost increases for like or similar goods or services.
12.1. Bidder must provide like, or similar goods or services not listed in the bid price (s) at or below standard industry rates.
12.2. Bidder must meet or beat store, municipal, state and federal pricing for items bid on.
12.3. Bidder must provide like and similar goods or a direct substitute not listed on pricing lines at % discount from catalog prices.
13. Quality Assurance
13.1. Test and Inspection. It is Bidder’s responsibility to perform all tests and inspections required by this specification unless otherwise stated in the purchase order, data sheet, and/or contract. The Bidder may use in the process his/her own facility or any recognized independent laboratory acceptable to the City of Atlanta. The City of Atlanta reserves the right to perform any of the tests and inspection requirements where such tests and inspections are needed to further determine compliance with the specification. If such testing is needed, Bidder must pay for all testing costs.
13.2. Certification. Material covered by this specification must be manufacturer original parts or approved by the manufacturer for use in the specified systems. Certification to this standard must be provided with the Parts and/or Service. It is Bidder's responsibility to ensure that that all parts and/or services meet industry standards. Full acceptance of the materials must be subject upon findings of suitability as determined under Subsection 13.1.
13.3. Sampling. It is the Bidder’s responsibility to submit a random sample testing in accordance with this specification. Material furnished must be identical to the sample submitted for performance test and must comply with the requirements set forth herein. If the material does not comply with the requirements of this specification, or is not identical to the original sample submitted, the Bidder must be required to replace all such materials at its own expense. This includes all handling charges and transportation, with the material that does so comply.
13.4. Quality and Quantity Control - A system of test and inspection must be used to ensure receipt of the quality and quantity of items supplied. Goods will be promptly unpacked and inspected; any discrepancies from purchase order or supplier invoice will be reported immediately to the Chief Procurement Officer of the Department of Procurement.
13.5. Plant and Facility Inspections - The Department of Procurement may require the Bidder to make their plant and facilities available for inspection or may require additional information concerning the Bidder's ability to comply with the requirements of this specification, or its ability to perform in accordance with delivery requirements and within budget. In addition to the above, Bidder may be required to produce shop orders and backlog orders documentation. Failure to comply with this requirement may cause rejection of the bid package.
13.6. Protection - The Bidder must assume all costs arising from the use of patented materials, devices, or processes incorporated in the materials furnished. The Bidder further agrees to indemnify and hold harmless the City of Atlanta and its duly authorized agents from suits of law or actions of any nature for or on account of the use of any patented materials, equipment devices or processes.
13.7. Travel and Lodging Expenses - The City of Atlanta may require one (1) or more onsite visits to the Bidder's site to assure Bidder’s compliance with the City’s requirements and other applicable requirements. Suppliers must reimburse the City, in accordance with the City of Atlanta’s Code of Ethics provisions, for authorized travel and lodging expenses related to such onsite evaluations after the purchase order has been assigned and occur no later than 30 days after receipt of invoice.
14. Preparation for Delivery
14.1. Packing - Packing must be accomplished in accordance with acceptable commercial practices for domestic shipments, unless otherwise stated in the Agreement and/or purchase order. The Bidder must make shipments using the minimum number of containers consistent with the requirements of safe transit, available mode of transportation and routing. It is the Bidder’s responsibility to determine that packing is adequate to assure that all materials must arrive at destination in undamaged conditions ready for intended use.
14.2. Marking - All packages must be identified with the City of Atlanta purchase order number and the User Department. Sealed packing lists must be affixed to all cartons showing its content.
14.3. Shipping - The Bidder must follow shipping instructions as stated in the purchase order or Agreement.
15. Subcontracting. If awarded a contract, the use of subcontractors is permitted. However, Bidder must: (i) remain responsible for the goods, installation, delivery, and any services provided by the subcontractor; (ii) remain City's sole point of contact for the goods and/or services provided under the Agreement; and (iii) be solely responsible for the payment of any subcontractor.
15.1. Bidder must identify all subcontractors it intends to use in its bid. Failure to disclose all subcontractors in a bid submission will result in termination of an Agreement if awarded.
15.2. All subcontractors must complete the subcontractor Illegal Immigration Reform and Enforcement Act (IIREA) Form and the completed subcontractor forms must be included in the Bidder’s bid.
16. Payment Terms. Bidder will provide payment terms of five percent (5%) 10, net 30 calendar days of invoice price. Otherwise, terms will be net 30 calendar days.
17. Warranty. It is the Bidder's responsibility to submit, at time of shipment, the original manufacturer's warranty of the goods/material(s) supplied.
18. Guarantee. The material must be guaranteed to be free from defects of construction, conception, and workmanship for a period of at least 12 months or manufacturer’s warranty whichever is greatest from date of acceptance. Any part or portion found not in accordance with this specification will be rejected and returned to Bidder at Bidder's expense for immediate replacement.
19. Price Escalation and De-Escalation.
19.1 Preference must be given to the bidder submitting the lowest and best firm price as their bid. Should it be found that due to unusual market conditions it is in the best interest of the City of Atlanta to accept a price with an escalation/de-escalation clause, the following must apply:
19.2 The contract price must be frozen for a specified period. This period must be shown on your bid.
19.3 Cost data to support any proposed increase must be submitted to the Chief Procurement Officer of the Department of Procurement not less than 30 days prior to the effective date of any such requested price increase.
19.4 Any adjustment allowed must consist only of bona fide cost increases resulting from such situations as unforeseen raw material cost increase which may be passed on to the consumer.
19.5 No adjustment must be made to compensate a supplier for inefficiency in operation, or for additional profit.
19.6 In the event that market media indicators show that the prices for those materials, goods, or services have overall decreased but the vendor has failed to pass the price decrease onto the City, the City reserves the right to place the vendor in default for cause, cancel the awarded contract, remove the vendor from the City of Atlanta Bidders List for a period deemed suitable to the City, and recuperate any damages from the vendor.
SCOPE AND CLASSIFICATION - PART II
2. REQUIREMENTS
Vendor must state “Compliance” or “Exception” for the requirements listed below for each group. Check marks, dittos, or any other markings may not be accepted, and your bid could be rejected.
For the purpose of this bid, “Parts” must be defined as components of a unit to be provided by the vendor to the City. “Service” must be defined as the furnishing of labor time or effort by a vendor, to repair or rebuild (where applicable), a part, component, or (where applicable), the unit/item as a whole.
Please note failure to complete all required forms in detail will result in a non-responsive bid and ineligible for award.
Compliance Exception
Vendor must provide reasonable and agreed upon pricing for all “Sewer Cleaning Equipment and “Sewer Line Inspection Equipment” not listed on this bid and provide like and similar goods at State, Store, Fleet, or better pricing.
Compliance Exception
Procedures – Bidder must comply with procedures established and outlined by the Department of Watershed Management with regard to requesting services, accepting services and payment processes. NOTE: All invoices must include the purchase order number to avoid payment delays.
Compliance Exception
Design – All vehicles and allied equipment must be new modeled inventory vehicles.
Compliance Exception
City of Atlanta expects all stock equipment to be delivered within 14 business days or less.
Compliance Exception
Subcontractors – Subcontractors are allowed per this bid, but the City of Atlanta will only respond to the prime vendor. It is the prime vendor’s responsibility to coordinate any equipment installation and deliveries. The City will hold the prime vendor liable for all equipment orders for this contract.
Compliance Exception
Vendors must provide state of Georgia equipment pricing or better during process.
Compliance Exception
Vendors must provide a 5% discount each day if equipment is not delivered within the time specified in this contract. This requirement will be waived in the event of Force Majeure.
Compliance Exception
Vendor must provide 5%, 10, net 30 payment terms.
Compliance Exception
NOTE: The following section applies for Groups I through VI.
The services in this Bid must consist of the purchase of new sewer line inspection equipment, sewer cleaner equipment, and upfitting, repair and preventive maintenance services.
Compliance Exception
These services requested in this contract will be oriented towards the completion of specific tasks. The City is under no obligation to exclusively award this work to a single bidder nor is the City bound to a minimum contract amount.
Compliance Exception
Successful bidders must own or have full access to a fully functional machine shop and field service equipment to perform inspection and repair of sewer line inspection and cleaning equipment or any other related water and sewer equipment.
Compliance Exception
Successful bidders must have qualified personnel certified to perform inspection and repairs.
Compliance Exception
The successful bidder will be required to perform some services at City facilities.
Compliance Exception
The Vendor must provide a written quote for any service requested from this contract. Quotes approved by the Using Agency will be considered binding subject to the provisions of the contract. All costs must be itemized on the Vendor quote and must involve the use of specific, identified costs for labor and materials used to complete the repair. All work performed by the successful bidder during this contract will be authorized using a City Purchase Order.
Compliance Exception
Training of City Personnel
Vendor Personnel: Designate and provide Vendor personnel to be responsible for coordinating and expediting training duties. The person(s) must be present during training coordination meetings with the City and must be familiar with the Operation and Maintenance (O & M) Manual information.
Compliance Exception
Manufacturer Representative: Where training of City personnel is required in the Specifications, Manufacturer Representative must furnish detailed instructions to City personnel for operation and maintenance of the specified equipment.
Compliance Exception
Training services include pre-startup classroom instruction, post startup classroom instruction, and onsite equipment instruction, as stated in the specifications.
Compliance Exception
Manufacturer Representative must be familiar with Collections O & M requirements as well as with the specified equipment.
Compliance Exception
Pre-startup Training: Vendor must coordinate pre-startup training periods with City operating personnel and Manufacturers’ Representatives and furnish O & Manuals.
Compliance Exception
Pre-startup training must be completed at least 14 days prior to actual startup.
Compliance Exception
Post Startup Training: Where post startup training is required, furnish and coordinate the specified manufacturers’ services and vendor personnel for post startup training of the City operating personnel within seven (7) days of actual startup.
Compliance Exception
MINIMUM SPECIFICATIONS
| ITEM NUMBER | ||||||
| GROUP | I | – | COLOR | VIDEO | SEWER | LINE INSPECTION SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
| 1. |
| The system proposed must be capable of providing color video inspection of pipelines from 4” – 36” in diameter via a self-propelled robotic crawler/transporter. |
| 2. |
| The system must be a wheeled, fully portable unit that |
utilizes a foldable handle for ease of movement by one (1) person.
| 3. |
| Vendor must provide a lightweight weather-proof control console that houses the monitor and all system controls. |
| 4. |
| The control console must be capable of multi-angle positioning and be removable for remote operation |
utilizing up to a 30’ cord.
| 5. |
| Equipment must control for tractor and elevator movement. |
| 6. |
| Vendor must provide a weather-proof main body housing |
that utilizes a flip down door to expose keyboard.
| 7. |
| Vendor must provide a “QWERTY” keyboard. |
| 8. |
| The main body must have a flip up door for shade. |
| 9. |
| Vendor must provide a Choice of Power or manual cable drum with a built-in footage counter with <0.5% accuracy. |
| 10. |
| Vendor must provide up to 1000’ of cable. |
| 11. |
| Vendor must provide a rear Pendant Controller with all controller functions for remote operation near cable drum. |
| 12. | |||||
| Vendor’s | final | bid | price | must | include |
transportation/freight costs for delivery of the system to the purchaser’s facility.
| 13. |
| The system must be capable for supporting two (2) tractor sizes. A small straight drive tractor and or a larger steerable tractor and remotely controlled elevator capable of providing color video inspection of pipelines from 4” – 36” in diameter via self-propelled robotic |
crawler/transporter.
| ITEM NUMBER | ||||||
| GROUP | I | – | COLOR | VIDEO | SEWER | LINE INSPECTION SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
1. Operator Pendant and Wireless Controls:
The Vendor must provide:
| 1. |
| 8” minimum hand-held color touch-screen monitor with 1280 x 800px display resolution for viewing, recording |
video and accessing control and configuration functions.
| 2. |
| Certified technicians must be able to log onto the pendant, either in person or remotely over the internet to diagnose any possible system problems that may arise. |
| 3. |
| Dual joysticks for camera and crawler functions. |
| 4. |
| Video signal output for external monitor or recording devices. |
| 5. | ||||
| Multifunction | joystick | to | control | crawler’s |
forward/reverse, left/right turning and speed, control camera’s pan/tilt, zoom and home functions.
| 6. |
| Ability to display crawler pressure, temperature, sonde |
status, pitch (inclination) and roll, and power usage.
| 7. |
| Controls for adjusting illumination intensity of camera and auxiliary lighting. |
| 8. |
| Ability to control cable reel functions: auto, manual, speed, |
direction, and torque of the cable reel.
| 9. |
| Ability to record up to 40 hours of digital video. |
| 10. |
| Ability to capture digital still photographs. |
| 11. |
| Auto-upright image to allow the operator to position the joysticks in the most comfortable/convenient position. |
| 12. |
| Ability to directly engage or disengage electronic clutch. |
| 13. |
| Ability to capture, correlate and store still images with distance and observation information, all of which can be |
output into several reporting packages or viewed onscreen.
| ITEM NUMBER | ||||||
| GROUP | I | – | COLOR | VIDEO | SEWER | LINE INSPECTION SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
1. Operator Pendant and Wireless Controls (cont’d):
The Vendor must provide:
| 14. |
| Ability to pause video when adding an observation as to not waste video file storage capacity. |
| 15. |
| Ability to generate a graphic inclination report to show |
pipe grade along inspection route.
| 16. |
| 64 GB file storage for an average of 40 hours of digital video or thousands of digital stills. |
| 17. |
| USB 2.0 port for connection of jump drive to save and |
transfer files to PC.
| 18. |
| RCA video outputs for option of external monitors for viewing and/or recording device. |
| 19. |
| On/Off control for camera measurement lasers. |
| 20. |
| Controls for remotely controlled motorized camera lift. |
| 21. |
| Ability to connect to a WIFI connection and wirelessly offload inspection data, video and still photographs via Wincam Web or equivalent. |
| 22. |
| A wireless auxiliary controller must be provided. |
| 23. |
| Portable battery powered belt clip wireless controller crawler, camera and cable reel functions for easy direct |
single person deployment and retrieval of the crawler at the access point (manhole/basin).
| 24. |
| Wireless controller must work with a single specific system in order to provide secure control when several systems are being operated in the same area. For operator safety and |
system protection, there can be no chance for operational interference.
| 25. |
| The wireless controller must be water proof. |
2. Steerable Motorized Crawler
The Vendor must provide:
| 1. |
| Composed of stainless steel and anodized aluminum. |
| 2. |
| 6-wheel drive (three (3) wheels per side) to generate traction necessary to crawl 1000’ in wet and slippery pipes. |
| ITEM NUMBER | ||||||
| GROUP | I | – | COLOR | VIDEO | SEWER | LINE INSPECTION SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
2. Steerable Motorized Crawler (cont’d)
The Vendor must provide:
| 3. |
| In 8” configuration with the middle wheel remaining, the four (4) larger wheels will overlap the middle ones to provide continuous traction to go over joints and debris and avoid high centering where 4-wheel crawlers can no longer move forward. |
| 4. |
| The tractor must have proportional left, right, forward and reverse capability via manual and automatic controls via a joystick and direct buttons amongst the operator pendant |
and wireless controller.
| 5. |
| Maximum size 12.2 x 4.3 x 3.5” (1/w/h), allowing proper clearance in 6” and lined pipes. |
| 6. |
| An electronic clutch that can be engaged and disengaged without needing to move the crawler motor. Systems that demand movement of the crawler motor to engage or disengage a mechanical clutch will be deemed |
unacceptable. The clutch must disengage upon power loss to ease camera/transporter extraction.
| 7. |
| Sensor package with inclination, roll, sonde, pressure, heat |
and motor readings.
| 8. |
| Integral rearview color camera with high-lux tri-LED lighting to be positioned at the top rear of the crawler body and not to have any visible increase in the diameter of the |
crawler body or be integrated with the rear connector.
| 9. |
| All connections to the crawler (camera and cable) must be tool-free connections for ease of attachment with 1-bar waterproof rating. |
| 10. |
| Push-button hubs on all six (6) axles to facilitate quick wheel change-out. Wheel attachment at all six (6) axles |
must be tool-free. No exceptions.
| 11. |
| Ability to fit in 8” pipe with top mount auxiliary lighting attached. |
| 12. |
| 512 Hz integral sonde for crawler location. |
| ITEM NUMBER | ||||||
| GROUP | I | – | COLOR | VIDEO | SEWER | LINE INSPECTION SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
2. Steerable Motorized Crawler (cont’d)
The Vendor must provide:
| 13. |
| Must include Auxiliary lighting that has: |
Twin Hi-lux tri-LED lamps for inspecting large pipes.
Rear-viewing color camera with single Hi-lux tri-LED lamp (necessary when using lift and needing to see above water flow).
| 14. |
| Quick Change Wheel Sets: |
| 14.1 |
| The following standard and optional wheel and spacer sets: |
| 14.2 |
| Set of six (6) quick-change hubs that allow the changing of |
wheels with no tools. No exceptions.
| 14.3 |
| 3.34” (85mm) Small (S) quick-change rubber wheels (set of six (6) supplied standard) |
| 14.4 |
| 4.72” (120mm) Medium (M) quick-change rubber wheels |
(set of four (4) supplied standard)
| 14.5 |
| 5.90” (150mm) Large (L) quick-change rubber wheels (set of four (4) supplied standard) |
| 14.6 |
| 6.88” (175mm) (XL) quick-change rubber wheels (set of |
four (4) supplied)
| 14.7 |
| 3.26” (83mm) Climbing wheel to be used on each side of center axle when using medium rubber, abrasive or carbide/grit wheels (set of two (2) supplied standard) |
| 14.8 |
| Set of four (4) XXL wheels for use in pipelines 18” to 24”. |
(set of four (4) supplied)
| 14.9 |
| Set of four (4) Medium (M) quick-change grease wheels (set of four (4) supplied) |
3. Motorized Automatic Cable Drum
The Vendor must provide:
The system cable reel must have:
| 1. |
| Capacity for the systems 1000’ cable. |
| 2. |
| A motorized system with sensors that monitor cable tension in order to coordinate cable feed/retrieval with |
direction and exact speed of the crawler.
| 3. |
| Self-contained power drum for can fit or portable use. |
| ITEM NUMBER | ||||||
| GROUP | I | – | COLOR | VIDEO | SEWER | LINE INSPECTION SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
3. Motorized Automatic Cable Drum (cont’d)
The Vendor must provide:
| 4. |
| Ability to automatically perform all forward, backward and varying speed functions without the operator having to monitor or control cable reel functions directly. |
| 5. |
| Ability to operate in both automatic and manual modes. |
| 6. |
| Size of no longer than 21 x 14.5 x 24.5” (h x w x d) with |
standard cable roll bar that extends 15” from the front of the reel. The cable drum will be equipped with layering rollers that will ensure the even distribution of the cable on the drum.
| 7. |
| All moving hazardous components to be completely covered/enclosed to prevent injury – hand or clothing cannot reach dangerous moving parts. Open access design of the front, top, and sides where an operator can touch level-wind mechanism, gears, chains and belts will |
be deemed unacceptable.
| 8. |
| Powder-coated steel construction with interchangeable power pack mounted on top of the cable drum. |
| 9. |
| Cable protection Devices include: |
| 9.1 |
| Upper cable guide that uses Delrin (or similar) roller mounted to lightweight aluminum frame to protect cable |
from abrasion during operation, and to limit operator strain during setup.
| 9.2 |
| Lower roller assembly that uses Delrin (or similar) roller mounted to lightweight aluminum frame to protect cable from abrasion during operation, and to limit operator strain during setup. Designs requiring use of interlocking |
poles must be deemed unacceptable.
4. Lightweight Heavy-Duty Transmission Cable
The Vendor must provide:
| 1. |
| 1000’ of cable with maximum 6-wire continuous-length multi-conductor wires for lightweight and easy maintenance performance. |
| 2. |
| Kevlar reinforcement to provide a minimum break |
strength of 1000 lbs.
| ITEM NUMBER | ||||||
| GROUP | I | – | COLOR | VIDEO | SEWER | LINE INSPECTION SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
4. Lightweight Heavy-Duty Transmission Cable (cont’d)
The Vendor must provide:
| 3. |
| Weight of no more than 10.8 lbs. per 328’ (0.03 lb. per ft.) to promote portability, long crawler runs and easy |
handling of multiple sized crawlers.
| 4. |
| Strain relief to be internal to the cable and cable connector. NO external wires, pig tails or other visible external strain mechanisms will be accepted. |
| 5. |
| Solid stainless-steel screw on connector at crawler end that locks with two (2) turns, and which engages a locking spring-loaded pin on the rear of the crawler to secure the cable and provide strain relief. Connections that require |
any tools or loose hardware will be deemed unacceptable.
| 6. |
| Cable RE-Termination Kits for in field repair. Ability to be re-terminated by soldering no more than six (6) wires, then sealed and strain-relieved using a quick-dry epoxy. Procedure must take no more than half an hour to complete. More than 6-wire solder repair and Scotch-cast style solutions that require longer cure times will be |
deemed unacceptable.
| 7. |
| Cable to be only single connection regardless of use of optional items such as additional lighting, side scanning camera, rear camera, laser circle, laser dots, remotely operated lift or large pipe carriage. |
| 8. |
| No strain relief cables or clamps to be used, as cable has built in strength member which is terminated in tractor end termination. |
5. Color Pan & tilt or Pan/Tilt/Zoom Camera
The Vendor must provide:
| 1. |
| Pan/Tilt/Color Zoom Camera with 10x Optical and 12x Digital for a total 120x zoom capabilities. |
| 2. |
| High-quality color image with a resolution of 720x576 |
pixels.
| 3. |
| Dual projection lasers, 50mm apart, to be able to measure observations and gauge pipe diameter. |
| ITEM NUMBER | ||||||
| GROUP | I | – | COLOR | VIDEO | SEWER | LINE INSPECTION SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
5. Color Pan & tilt or Pan/Tilt/Zoom Camera (cont’d)
The Vendor must provide:
| 4. |
| Front housing made of aluminum and stainless steel, with |
windshield made of impact-resistant, distortion-free material.
| 5. |
| Upper cable guide that uses Delrin (or similar) roller mounted to lightweight aluminum frame to protect cable from abrasion during operation, and to limit operator |
strain during setup.
| 6. |
| Ultra-bright White LEDs. |
| 7. |
| Mimic display control and auto survey mode for easy pan & tilt operation. |
6. Pipeline Observation Archiving and Reporting Software
The Vendor must provide:
| 1. |
| Captured visual data can printed in an inspection report that has manhole to manhole schematic, observations, |
distances, asset information, operator details and PACP codes.
| 2. |
| Pipelogix Flexidata Advanced Software Package with |
Lateral Launch Module
| 3. |
| The vendor must provide two (2) days of on-site, at our location, training on the Pipelogix Flexidata Software. |
| 4. |
| The vendor’s trainer must be a Certified Trainer for the |
company that is developing the software.
7. State Make and Model for all available equipment
1.
2.
3.
4.
5.
Available Options
1.
2.
3.
4.
5.
| ITEM NUMBER |
| GROUP II – LATERAL LAUNCH SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
System Equipment List:
| 1. |
| 1 – Pan and Tilt Camera |
| 2. |
| 1 – Self-Leveling Axial Camera |
| 3. |
| 1 – Lateral Launch Crawler with launching positioning unit and mechanical lateral launch drivers. |
| 4. |
| 1 – Front view launching camera |
| 5. |
| 1 – Rear view driving camera |
| 6. |
| 1 – Automatic Cable Drum 500’ Tag-line with 100’ Launching Cable |
| 7. |
| 1 – Desktop Controls (in addition to operator pendant controls requested in Group I specifications above) |
1. Push Cameras
The Vendor must provide:
| 1. |
| The camera must pan and tilt and be capable of viewing both the mainline and laterals for complete inspection. It must have a variable focus for pipe size adjustments and be able to be towed in the mainline via the crawler and pushed up the lateral via a pinch roller mechanism from the mainline through the lateral connection. Camera must be available with ATEX Zone 2 explosion proof rating. Camera must have NRTL approval for IP68 (IEC60529) or NEMA 6P (NEMA250) enclosure type ratings to offer |
protection for the operator and equipment in wet and damp environment.
| 2. |
| When connected to crawler there cannot be external wires, connector, clamps or tie-downs. The camera will pan a full |
joints. Camera will have the ability to capture maximum detail from pipe walls.
| 3. |
| Camera must be constructed from Aluminum for a light weight durable design. Camera construction must include all solid-state circuitry designed to withstand shocks and vibrations while being |
pushed, pulled or propelled through the pipe.
| ITEM NUMBER |
| GROUP II – LATERAL LAUNCH SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
1. Push Cameras (cont’d)
The Vendor must provide:
| 4. |
| All camera electronics must be of modular construction for ease of exchange and repair and must be designed to facilitate future upgrades. |
| 5. |
| The front of the camera housing must have a windshield |
made of impact resistant, distortion-free material.
| 6. |
| The housing must be fully sealed and waterproof (IP68) to withstand external pressure up to 10 bars without damage or leaking. |
| 7. |
| The camera power supply must be provided form a solid-state power source and the camera input must be 12 volts DC. |
| 8. |
| The lighting for the camera must be supplied through an isolated power supply and must regulate the light voltage |
up to a nominal 36 volts DC.
| 9. |
| Pan/Tilt Motor power must be 12V/3Watt. |
| 10. |
| A variable transmitter 512hz and 640hz must be located inside the camera head, operator must be able to switch between the two (2) signals via the control pendant. |
| 11. |
| Camera illumination must be provided with a minimum of 28 field- |
and provide 45000mcd/piece to light pipes up to 24” diameter.
| 12. |
| Camera Must have a valve for purge and pressurization of camera-body. The internal pressure of the camera must be displayed on the CCU diagnostics screen and will alarm when pressure is low. Cameras that are not pressurized or do not have the ability to monitor the internal pressure of |
cameras will be deemed unacceptable.
| 13. |
| The pan and tilt camera must have a motorized self-leveling feature in order to maintain an upright picture image during inspection, this feature can be overridden in |
order to pan and tilt as needed, then back engaged when camera is in the home position.
| 14. |
| Camera must have a minimum size of 2.0” in order to fit into pipe diameter of 4”. |
| ITEM NUMBER |
| GROUP II – LATERAL LAUNCH SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
1. Push Cameras (cont’d)
The Vendor must provide:
| 15. |
| Pan and tilt must have integrated clutch for pan and tilt motor. |
| 16. |
| A self-leveling axial camera for the lateral launch must be |
included.
2. 6” to 24” Wheeled Steerable Lateral Launch Crawler
The Vendor must provide:
| 1. |
| Launcher crawler must be offered with ATEX Zone 2 explosion proof rating. Launcher crawler must have NRTL approval for IP68 (IEC60529) or NEMA 6P (NEMA250) enclosure type ratings to offer protection for the operator and equipment in wet and damp |
environment.
| 2. |
| Crawler must be a gear driven; six (6) all-wheel drive tractor to carry the camera and launching cable for rapid remote inspection of mainline pipes that range from 6” to 24” and be able to launch the camera into lateral lines up |
to 100’ from the crawler. Tractors propelled by chains, belts or continuous tracks will be deemed unacceptable.
| 3. |
| The tractor must provide sufficient traction, under suitable conditions, to tow up to 500’ of mainline transmission cable, 100’ of launching cable and up to 500’ |
of lateral camera transmission cable.
| 4. |
| The tractor must have proportional left/right steering, forward, reverse, capability via a joystick and other |
controls via the operator pendants attached to the CCU and the cable reel.
| 5. |
| The tractor must have a maximum size of 12.4” (314mm) |
long by 4.7” (119mm) High by 4.3” (109mm) wide to allow for proper clearance in 6” and lined pipes.
| 6. |
| A minimum of two (2) 50-watt DC motors must power the |
tractor.
| 7. |
| Crawler must include a camera positioning docking tuber that will raise, lower and rotate left/right to position |
camera head in center of mainline or above flow, and position camera for launching into lateral.
| ITEM NUMBER |
| GROUP II – LATERAL LAUNCH SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
2. 6” to 24” Wheeled Steerable Lateral Launch Crawler (cont’d)
The Vendor must provide:
| 8. |
| Camera must mount to the front of the crawler in the lateral positioning docking tube. Cable must attach to rear of crawler with two (2) turns of the outer stainless housing on the end of the cable. A spring-loaded pin on the crawler body must lock into the end of cable housing to secure cable connection and provide a pulling strength |
that is beyond the 1000 lb. rated break strength of the cable.
| 9. |
| Crawler must have a maximum speed of 30’ per minute. |
| 10. |
| The tractor must be no longer than 12.4” (314mm) in |
rolling.
| 11. |
| The tractor chassis must be a single piece of machined stainless steel with only a top plate to access the control boards, a bottom plate to access the motors and two (2) side cover plates to access the gears. Bronze or brass |
bodies or soft metals will not be acceptable for body chassis.
| 12. |
| The launch drive system must be top mounted on the |
lateral launch crawler with a top door for ease of access to the drive system for cleaning and maintenance.
| 13. |
| The tractor must have push-button, quick disconnect hubs on all six (6) axles. No plates or spacer-bars will be accepted. All wheels must be interchangeable between the |
transporters specified.
| 14. |
| Crawler must be controlled via CAN Bus software technology to allow for precision control, diagnostic monitoring and future upgradeability. |
3. Automatic Lateral Launch Cable Drum
The Vendor must provide:
| 1. |
| Automatic cable drum must be controlled via CAN Bus software technology to allow synchronization of the lateral launch drum with the main cable drum. This synchronization must be controlled remotely form the operator station without any adjustment at the cable |
drums.
| ITEM NUMBER |
| GROUP II – LATERAL LAUNCH SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
4. Desktop Controls
The Vendor must provide:
The system control pendant must have:
| 1. |
| Power on/off switch. |
| 2. | |||||
| Standard ability to connect to a network in order to access | |||||
| remote | server | download | for | lifetime | automatic performance and feature upgrades. |
| 3. |
| Optional ability to connect to a network in order to work |
with repair studio software for remote diagnosis.
| 4. |
| Integral error code maintenance and repair protocol which informs the operator of current or pending operating or maintenance tasks that need to be addressed by flashing a code. |
| 5. |
| Pendant must be capable of being used on the desktop or |
mounted into the desktop for a more permanent installation.
| 6. |
| Dual software programmed joysticks for camera and |
crawler functions.
| 7. |
| Video signal output. |
| 8. |
| Right 3-axis multifunction joystick to control crawler’s forward/reverse, left/right turning and speed. |
| 9. |
| Left 3-axis multifunction joystick to control camera’s pan/tilt, zoom and hone functions. The left-hand joystick must also have the ability to change into a lateral launch mode in which it must have the ability to control the |
positioning and deployment of the lateral launch camera in addition to the functions previously listed.
| 10. |
| Controls for manual and automatic focus of camera. |
| 11. |
| Ability to display crawler pressure, temperature, sonde status, pitch (inclination) and roll. |
| 12. |
| Pressure to be listed onscreen and saved within system |
history for predictive maintenance.
| 13. |
| Controls for adjusting illumination intensity of camera and auxiliary lighting. |
| 14. |
| Ability to control cable reel functions: auto, manual, |
speed, direction, torque of the cable reel.
| 15. |
| Have a master single button to regain control from wireless controller. |
| ITEM NUMBER |
| GROUP II – LATERAL LAUNCH SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
4. Desktop Controls (cont’d)
The Vendor must provide:
The system control pendant must have:
| 16. |
| Minimum 20’ control cable that connects the automatic cable drum with the pendant via an emergency on/off switch box junction. |
| 17. |
| Ability to inform operator if one (2) is getting close to |
flipping the crawler.
| 18. |
| Ability to directly engage or disengage electronic clutch. |
| 19. |
| Ability to operate crawler in cruise control mode where an operator does not need to touch the joystick for crawler speed. |
| 20. | ||||||
| Ability | to | view | system | operational | history | and |
performance.
| 21. |
| On/off control of digital zoom function. |
| 22. |
| On/off control of auto shutter speed. |
| 23. |
| Ability to toggle front-view camera, integral rear-view camera, and accessory rear view camera. |
| 24. |
| On/off control for camera lasers. |
| 25. |
| Ability to control laser intensity of increments of 25%. |
| 26. |
| Control for remotely controlled motorized camera lift. |
| 27. |
| Button to activate automated software routine (Macro) for viewing laterals on the left and right. |
| 28. |
| Button to activate automated software routine (Macro) for performing a circumferential scan of a pipe joint. |
| 29. |
| The ability to operate larger (10’ minimum diameter) and |
smaller crawlers (minimum 4” diameter) with no need for additional control unit or cable upgrades.
| 30. |
| CAN-bus control architecture allowing for precision control, diagnostic monitoring and future upgradeability. |
| 31. |
| Tiltable, touch screen monitor for system operation and |
monitoring of system status.
| ITEM NUMBER |
| GROUP II – LATERAL LAUNCH SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
4. Desktop Controls (cont’d)
The Vendor must provide:
The system control pendant must have:
| 32. |
| Portable battery powered belt clip wireless controller with crawler, camera and cable reel controls for easy direct single person deployment and retrieval of the crawler at the access point (manhole/basin). |
| 33. |
| Wireless controller to have eight (8) dual function buttons |
with clear labels as the function of each.
| 34. |
| Wireless controller to have colored LED indicators to inform operator as to what functions the buttons are activated for. |
| 35. |
| Wireless controller to have a range of at least 50’ without radio frequency interference being able to compromise the |
signal. RF systems will not be accepted.
| 36. |
| Wireless encoder must work with a single specific system in order to provide secure control when several systems are being operated in the same area. For operator safety and system protection, there can be no chance for operational |
interference.
7. State Make and Model for all available equipment
1.
2.
3.
4.
5.
Available Options
1.
2.
3.
4.
5.
| ITEM NUMBER |
| GROUP III – PUSH CAMERA INSPECTION SYSTEM |
General Requirements
| COMPLIANCE |
| EXCEPTION |
The Vendor must provide:
| 1. |
| Digital recording monitor with color LCD. |
| 2. |
| Ability to connect to a WIFI connection and wirelessly offload inspection data, video and still photographs. |
| 3. |
| Water-resistant keyboard. |
| 4. |
| Integrated Microphone and Speaker. |
| 5. |
| The vendor must provide Advance Lithium Battery (2) and a charger. |
| 6. |
| Reel |
| 7. |
| Stainless Steel |
| 8. |
| LED Camera Lighting |
| 6. |
| Pipe Diameter 1 ½ - 8” |
| 10. |
| Cable length of less than 100’ |
| 11. |
| Built-in sonde to locate a point of interest during the pipe inspection |
| 12. |
| USB Port |
| 13. |
| Self-leveling feature |
| 14. |
| Quick-release docking system for fast, efficient job set-up |
| 15. |
| The vendor must provide a locator with multi-directional antenna technology to integrate with system. |
7. State Make and Model for all available equipment
1.
2.
3.
4.
5.
Available Options
1.
2.
3.
4.
5.
| ITEM NUMBER |
| GROUP IV – CHASSIS WITH CUSTOM BUILD-OUT |
General Requirements
| COMPLIANCE |
| EXCEPTION |
The Vendor must provide:
| 1. | |||||
| Basic: | 36 | months/36,000 | miles | Powertrain: | 60 months/60,000 miles |
| 2. |
| Corrosion Perforation: 60 months/unlimited mileage |
Roadside Assistance: 60 months/60,000 miles
| 3. |
| Gas Fueled V6 Engine, High Roof, Extended Body, 148” Wheel Base, 9000 GVW, factory A/C, white. |
1. Chassis for Conversion
The Vendor must provide:
| 1. |
| 2018 Ford Transit 250 (Or current year/model) or approved equivalent |
| 2. |
| Gas Fuel System V6, with engine idle up installed |
| 3. |
| Body, Extended length/wheel base, High Roof edition |
| 4. |
| 148” Length Wheel Base |
TV Van Power Package to Include:
| 5. |
| Back Up Alarm and Camera |
| 6. |
| Rear rood mounted Arrow/Direction Bar (Cab mounted controls) |
| 7. |
| Strobe/Flashing lights, two (2) mounted front and rear |
(four (4) total)
| 8. |
| Work lighting (LED) roof mounted rear (two (2) total) |
2. Gas Cargo Van Conversion
The Vendor must provide:
External Additions:
| 1. |
| 3.0KW Pure Sine Wave Inverter, with three (3) stage charger |
| 2. |
| 8 AGM Deep Cycle Batteries in battery cell box |
| 3. |
| Shore Power Supply Receptacle mounted in side wall |
| 4. |
| For 120v 30A 25’ cord with plugs fitted |
| 5. |
| Idle up installed for correct alternator output |
Front/Control Room (Interior):
| 6. |
| Roof Top A/C unit, ceiling mounted controls |
| 7. |
| Diamond Plate (maybe rubberized) flooring |
| 8. |
| Bulkhead Wall with door and window to rear |
| 9. |
| Operator Desk/Console |
| ITEM NUMBER |
| GROUP IV – CHASSIS WITH CUSTOM BUILD-OUT |
General Requirements
| COMPLIANCE |
| EXCEPTION |
2. Gas Cargo Van Conversion (cont’d)
The Vendor must provide:
Front/Control Room (Interior):
| 10. |
| LED Interior Lighting |
| 11. |
| Inverter Remote Control Panel |
| 12. |
| Multiple Quad Electrical Outlets (GCFI Protected) |
| 13. |
| Dual 24” TV Monitor/PC Monitor (Qty. 2) |
mounted
| 14. |
| Finished walls/ceiling covered in black spray liner |
| 15. |
| Operator chair with tie down |
| 16. |
| P350 CMOD Wall Mounting Bracket |
| 17. |
| Bluetooth connected keyboard on pull out tray, Bluetooth mouse and pad |
| 18. |
| Built in space for Toughbook laptop and |
external hard drive
| 19. |
| Pipelogix/Flexidata Reporting Software (Full License) with three (3) year support package |
| 20. |
| Office Jet Printer mounted |
Rear/Equipment Room
| 21. |
| Diamond Plate Flooring |
| 22. |
| Bulkhead Wall with door and window to front |
| 23. |
| Finished walls/ceiling covered in black spray liner |
| 24. |
| Work Bench on Passenger Side of Vehicle |
| 25. |
| LED Interior Lighting |
| 26. |
| Inverter Mounted on Bulkhead Wall, Main Inverter Control Panel |
| 27. |
| Multiple Dual Electrical Outlets (GCFI |
Protected)
| 28. |
| 17” Rear Mounted TV Monitor |
| 29. |
| Installed Water Tank with on demand DC pump and hose reel |
| 30. |
| Tool box four (4) drawers minimum installed under workbench with all necessary tools |
| ITEM NUMBER |
| GROUP IV – CHASSIS WITH CUSTOM BUILD-OUT |
General Requirements
| COMPLIANCE |
| EXCEPTION |
3. State Make and Model for all available equipment
1.
2.
3.
4.
5.
Available Options
1.
2.
3.
4.
5.
| ITEM NUMBER | ||||||
| GROUP | V | - | CHASSIS | MOUNTED | SEWER | |
| COMBINATION UNIT | Debris Body General Requirements | |||||
| COMPLIANCE | ||||||
| EXCEPTION |
The sewer combination truck must be complete with cab, chassis, sewer combination and ready to put into service and operation. The single engine combination sewer and catch basin cleaner will be used for removing all debris commonly found in storm basins and sanitary sewer lines. The unit must consist of a centrifugal compressor vacuum system, a hydraulically driven high-pressure water pump, an enclosed sealed body for storage, and equipped with a self-contained water supply. Design must be based on current industry standards.
Cylindrical and having a minimum liquid capacity of 12 cubic yards
Capable of a high dump height of 60”
Constructed with a minimum ¼” corrosion and abrasion resistant Ex-Ten steel
Minimum yield point of 50,000 PSI and a minimum tensile strength of 70,000 PSI
Rear door hinged at the top and equipped with replaceable neoprene seal, adjustable for periodic compensation of door seal wear
Dual outward mounted rear door props
| ITEM NUMBER | ||||||
| GROUP | V | - | CHASSIS | MOUNTED | SEWER | |
| COMBINATION UNIT | Debris Body General Requirements | |||||
| COMPLIANCE | ||||||
| EXCEPTION |
Vacuum drawn from separate ports in the top of debris body
Body dumped by raising the body to a 50-degree angle utilizing a forward mounted, double acting hydraulic dump cylinder
Dump controls, accessory controls, and e-stop control located directly behind the cab of the truck
Dumping accomplished while the pivot point of body remains fixed to the sub frame
Flat industrial style rear door that opens and closes hydraulically by cylinders mounted at the top of the body. Door must open 50 degrees from fully close position. Door must be unlocked, opened, closed, and locked by a failsafe hydraulically activated sequential positive locking system. Door is cam operated by a single hydraulic cylinder with all controls located behind truck cab and forward of the debris body.
Body flush out system with fan-type spray nozzle located in front wall of debris body. Nozzle must utilize (2) spray nozzles to flush the front most area of debris body. System must produce a flow of 80GPM. Control valve must be on curb side of unit.
Body must have float type automatic shut-off system protecting the fan system with (2) 10” stainless steel shut-off balls. Each float ball must be housed within a non-corrosive screen assemble and be easily accessed.
| . |
| Body equipped with a rear door drain to drain off excess liquids while retaining solids and includes a manually operated 6” butterfly valve with 10’ of flat hose. |
Pump off ports for installation of future pump-off system must be provided on curbside on forward portion of debris body
Body equipped with curb side forward mounted body drain with air activated 6” knife valve and screen with cam-lock coupler and 10’ of flat hose
| ITEM NUMBER | ||||||
| GROUP | V | - | CHASSIS | MOUNTED | SEWER | |
| COMBINATION UNIT | Debris Body General Requirements(cont’d) | |||||
| COMPLIANCE | ||||||
| EXCEPTION |
Four dual vertical centrifugal separators must be installed in-line between the debris body and air mover; two per side for each discharge port. Each dual separator includes large fallout chamber cleanout door.
A minimum of five (5) vacuum tubes must be stored on curbside storage racks and must include quick release retainer handles (no bungees or clamps).