SOW_SloanCanyon_SecurityCameras_final.docx

DOCX document 2 MB Posted

Attached to
SLOAN CANYON NCA SECURITY CAMERA SYSTEM
Solicitation number
140L3926Q0017
Issued by

About this file

This is a Statement of Work (SOW) for the installation of a comprehensive security camera system at the Sloan Canyon National Conservation Area (NCA) Visitor Contact Station in Henderson, Nevada. The ~3,000 square-foot facility, opening in 2026, requires an Avigilon network-based security system to monitor interior and exterior spaces, including the visitor contact area, employee workspace, three building entry points, parking lot, amphitheater, and art wall. The contractor must provide design, supply, installation, and one-time staff training for a firm, fixed-price contract with a three-year warranty from acceptance.

The system must meet specific technical requirements including outdoor-rated IP-based pan-tilt-zoom (PTZ) cameras with minimum 4 MP resolution, 25x optical zoom, 360-degree continuous pan/tilt, integrated IR and white light illumination, real-time monitoring and 30-day automatic recording capability, H.265/H.264 video compression, ONVIF compliance, PoE+ power support, and IP67 environmental rating suitable for -30°C to +65°C operation. The contractor must assess existing electrical capacity, provide a customized installation plan within 15 business days of the kickoff meeting, complete installation within 45 calendar days (with all work finishing within a 10-day continuous period), and conduct functionality testing with BLM personnel present. BLM will have 15 calendar days to accept the completed work. All work must be performed on-site during standard business hours (Monday-Friday, 8:00 am-4:00 pm), and contractors must comply with federal security policies, including photo ID requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF THE INTERIOR

Bureau of Land Management

Statement of Work (SOW)

Sloan Canyon National Conservation Area Visitor Contact Station Camera Security System

BLM Southern Neveda District Red Rock/ Sloan Field Office

March 2, 2026

1. Introduction The Sloan Canyon National Conservation Area (NCA) is preparing to open a new visitor contact station in 2026, that will serve as the operational hub and primary gateway to some of southern Nevada’s most significant cultural and natural resources. Designed to welcome the public, support educational programming, and protect the area’s renowned petroglyph sites, the facility represents a major investment in visitor experience and resource stewardship. As with any public-facing site, the VCS faces unique security challenges. To safeguard personnel, federal property, sensitive information, and critical infrastructure, the facility requires a comprehensive security camera system that can record activity in and around the VCS, provide a crime deterrence presence, and can seamlessly integrate with broader security operations. Implementing such a system will help ensure that the visitor contact station remains both an inviting public space and a secure operational hub for managing this NCA.

2. Background This Performance Work Statement (PWS) outlines the requirements for the installation of a security camera system at the Sloan Canyon National Conservation Area Visitor Contact Station (VCS). The purpose of the system is to provide continuous monitoring and recording of unauthorized access, theft, or tampering. By recording suspicious activity in real time, a security camera system supports the safety of personnel, safeguards government assets, and ensures compliance with federal security standards.

The VCS facility is approximately 3000 square feet. The 800 square foot visitor space has two points of entry. There is a security door between the visitor space and the employee workspace. The 2200 square-foot employee workspace has one point of entry from the outside and one point of entry from the visitor area. See Figure 1.

3. Scope The Sloan Canyon National Conservation Area is new construction and requires a new Avigilon network security system. The Contractor shall provide all personnel, equipment, tools, materials, and supervision necessary to perform required services under this contract. The Selected Contractor will provide a comprehensive camera design for the interior and exterior or the VCS, and the parking lot, delivery, and on-site assembly and installation of the camera system. The design should provide for maximum surveillance based on the recommended camera locations identified in Figures 1-5 below. The work shall be performed in a manner that will ensure value or effectiveness in use of staff or facility time. The Contractor shall have only competent and qualified personnel perform the work.

3.1 This will be a firm, fixed price contract.

4. Required Tasks The contractor shall perform the following tasks:

4.1 Assess the building and provide a customized plan and installation of the most current security camera technology that meets federal security standards, provides complete coverage of interior and exterior spaces, and meets our specific location requirements. This includes:

4.1.1 The design and installation of a comprehensive security camera system that provides interior and exterior coverage of the three doors into the VCS (Figure X and X), the exterior of the VCS, including the amphitheater and art wall (Figures X and X), the parking area (Figure X), and the interior visitor contact/exhibit area (Figure X) from various angles.

4.1.2 Provides real-time monitoring.

4.1.3 Provides real-time recording, which is automatically saved for 30 days.

4.1.4 Ensures the system can provide detailed functionality reporting.

4.1.5 Detailed breakdown of the cost for hardware, software, and installation of the system.

4.1.6 Contractor shall supply all the equipment and installation supplies, including labor necessary to complete the installation of the approved system configuration.

4.1.7 Detailed breakdown of one-time BLM LE and staff training expenses.

4.1.8 A site visit is recommended prior to submitting a proposal for the contract but is not mandatory. However, incomplete site knowledge will not be an allowable reason for medication after contract award.

4.1.9 Proposed system must comply with federal security regulations and standards.

4.1.10 Additional lighting on camera poles as required.

4.1.11 Detailed minimum technical requirements

4.1.11.1 The contractor shall provide an outdoor-rated, IP-based pan-tilt-zoom (PTZ) camera system meeting or exceeding the following minimum requirements. Equipment shall be new, commercially available, and suitable for continuous operation on federal facilities and public lands

4.1.11.2 Imaging and Video

a. Minimum 4 MP (2560 × 1440) resolution with progressive scan CMOS sensor

b. Up to 30 fps at full resolution

c. True day/night operation with mechanical IR cut filter

d. Low-light performance of ≤ 0.005 lux (color) and ≤ 0.001 lux (B/W); 0 lux with IR

e. Support for wide dynamic range (WDR) and digital image enhancements (3D noise reduction, defog, backlight and highlight compensation, electronic image stabilization)

4.1.11.3 Lens and Zoom

a. Minimum 25× optical zoom and 16× digital zoom

b. Variable focal length suitable for wide-area coverage and long-range identification

c. Auto/manual focus with proportional zoom capability

4.1.11.4 PTZ Performance

a. 360° continuous pan and tilt range of at least -15° to +90°

b. Pan/tilt speeds up to approximately 80° per second

c. Minimum 300 presets, with patrols, patterns, and automatic park actions

d. Power-loss position memory and scheduled PTZ operations

4.1.11.5 Illumination and Deterrence

a. Integrated IR illumination with minimum effective range of 100 meters

b. Integrated white light illumination for color imaging at close range

c. Smart illumination control

d. Support for visible warning lights and audible alerts

4.1.11.6 Video, Audio, and Events

a. Video compression supporting H.265 and H.264

b. Multiple simultaneous video streams with configurable bit rate and ROI

c. Built-in microphones and speaker for live audio and two-way communication

d. Minimum 1 alarm input and 1 alarm output

e. Support for motion detection, video tampering, intrusion detection, line crossing, and region-based events

4.1.11.7 Network, Security, and Inoperability

a. Ethernet interface (10/100 Mbps)

b. Compliance with ONVIF Profile S, G, and T or equivalent open standards

c. Support for HTTPS, 802.1X authentication, user access control, and encrypted communications

d. Compatibility with standard video management systems and modern web browsers

4.1.11.8 Storage and Power

a. Cameras could be mounted to existing light poles. Contractor is responsible for ensuring that the current electrical supply can adequately support the requirements of the proposed project. Before proceeding, they must thoroughly assess the existing setup to confirm its capacity and suitability for the intended installation.

b. Onboard storage via memory card slot supporting at least 512 GB

c. Support for network-attached storage

d. PoE+ (IEEE 802.3at) and 12 VDC power support

4.1.11.9 Environmental Compliance

a. Operating temperature range of -30°C to +65°C (-22°F to 149°F)

b. IP67-rated (or higher) enclosure for dust and water ingress

c. Surge, lightning, and transient voltage protection

d. Suitable for use in federal outdoor environments and compliant with applicable DOI IT and security requirements

5. Plan Approval, Installation, and Acceptance

5.1. Kick-off meeting

5.1.1. Within 10 business days of the contract award, the BLM will host a post-award meeting with the selected vendor.

5.2. Other meetings:

5.2.1. Contractor shall be responsible for providing meeting agenda, materials, and any administrative or facilitation support.

5.2.2. Meeting location or method (will be determined during kick-off meeting).

5.3. The customized plan will be provided to the BLM within 15 business days of the kick-off meeting or the site visit, if determined to be necessary.

5.3.1. BLM will have 15 business days to review the proposed plan.

5.4. After contract award, contractor will have 45 calendar days to install the equipment as outlined in the approved plan.

5.4.1. Within this 45-day window, all installation work will be completed within a 10-day period once work commences.

5.4.2. Contractor will conduct thorough testing with BLM present to ensure functionality and compliance with the approved plan and federal security standards.

5.5. BLM will have 15 calendar days from date of installation to approve and accept the work.

5.6. Acceptance Criteria:

5.6.1. Successful installation of the system as outlined in the approved plan.

5.6.2. Completion of functionality testing.

5.6.3. Staff training provided on the use and maintenance of the system.

6. Maintenance and Support

6.1. All work is to be warranted for 3 years from the date of written acceptance by the BLM.

6.2. Establish a maintenance schedule for ongoing system assessments and updates.

6.3. Provide initial one-time training for staff and LE personnel on the use and maintenance of the system.

6.4. Deliver all necessary documentation, including user manuals, system schematics, maintenance guidelines, and compliance certifications.

7. Place of Performance

7.1. All work will be conducted on site at the Sloan Canyon NCA Visitor Contact Station on Nawghaw Poa Road in Henderson, Nevada.

7.2. The contractor shall operate during normal business hours, Monday through Friday, from 8:00 am to 4:00 pm, excluding Federal Holidays. The contractor must notify the Contracting Officer’s Representative (COR) three business days prior to the commencement of work.

8. Security Requirements

8.1 The contractor and all personnel must have and present a valid photo ID to work on-site.

All personnel must comply with federal security policies and procedures.

9. Notice to contractors:

All information and data related to this project that the contractor gathers or obtains shall be both protected from unauthorized release and considered the property of the Government. The Contracting Officer will be the sole authorized official to release verbally or in writing, any data, the draft deliverables, the final deliverables, or any other written or printed materials pertaining to this contract. Press releases, marketing material, or any other printed or electronic documentation related to this project, must not be publicized without the written approval of the Contracting Officer.

Interior Building Cameras A B C

Figure 1 – Suggested camera locations to cover the interior of the Visitor Contact Station area that is open to the public, including both doors to the outside, the door to the employee area, and the visitor contact desk.

Exterior Building Cameras X X Y Z W

Figure 2 – Suggested Location of Exterior Building Cameras

Figure 3 – Photo of NE Corner of the Visitor Contact Station with camera that covers the exterior door/employee entrance, and both gates to and the outdoor storage area.

Y

Figure 4 – PTZ/Fixed camera on light pole on the back patio covering exterior (south side) door, amphitheater, art wall, and back patio area. Additional lighting/motion light may be required to help capture details for the camera.

Parking Lot Cameras V U

Figure 5 – Suggested camera locations to cover the entire parking area and the front entrance.

image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image2.emf image3.jpg image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image4.emf image25.png image26.png image1.png image27.png image28.png image29.png image30.png image31.png image32.png image33.png image34.png image35.png image5.jpg

File details come from the government source that posted it. Updated .