Replace Access Rolling Doors
Solicitation number
FY264121002
Issued by

About this file

This is a Statement of Work (SOW) for the removal, replacement, and installation of three insulated shop/garage doors at the International Boundary and Water Commission's Presidio Field Office in Presidio, Texas. The project requires the contractor to furnish and install three new 15'2" wide by 10'1" high insulated shop/garage doors, including the safe removal and disposal of existing doors, all necessary hardware (tracks, rollers, hinges, seals, locking mechanisms, and weatherstripping), framing adjustments, and quality assurance testing. Materials must include 24-gauge steel sections with baked enamel finish, galvanized steel J-track and hardware, galvanized steel aircraft-grade cables, precision-engineered springs, steel ball bearing safety rollers, and interior slide locks. All work must comply with OSHA safety standards and applicable building codes.

The contractor shall provide all labor, tools, equipment, and materials necessary for completion and must coordinate installation during the Presidio Field Office's regular business hours (Monday-Thursday, 7:00 AM-5:00 PM). Site visits are available Tuesday or Wednesday from 8:00 AM to 12:00 PM by contacting Hector Delgado (432-631-1475) or Fidel Baeza (432-294-0871). Deliverables include three fully operational insulated doors, removal and disposal of old doors and debris, and warranty documentation. The contractor shall invoice for services via IPP with the final invoice clearly marked "FINAL." This is a 100% Small Business Set Aside with solicitation number FY264121002; quotes are due by 3:00 PM Mountain Time on May 11, 2026, and must be emailed to angelica.baca@ibwc.gov with the offeror's active UEI# and price sheet included.

Text of this file

Scope of Work – Removal, Replacement and Installment of Three (3) 15’2” Wx10’1” H Insulated Shop/Garage Doors

1. Project Overview This project involves furnishing of 3 new insulated shop/garage doors, removal, and disposal of three (3) existing 15’2”x10’1” shop doors and the replacement/installation of three (3) new insulated doors of the same dimensions, including all necessary hardware, framing adjustments, and finish work to ensure proper fit and operation and safety compliance.

2. Location Presidio Tx, International Boundary and Water Commission Presidio Field Office.

110 South DOD Ave.

Presidio TX 79845

3. Work to be Performed A. Removal Safely disconnect and remove existing doors, tracks, and all hardware.

Remove any damaged or obsolete framing components.

Dispose of all removed materials in compliance with all local, state, and federal regulations.

B. Installation Supply and install three (3) new 15’2”x10’1” insulated shop garage doors.

Provide and install all required tracks, rollers, hinges, seals, and locking mechanisms.

Secure spring assemblies and panels in place.

Adjust framing as needed for proper fit and alignment.

Ensure doors are level, balanced, and operate smoothly.

Install weatherstripping and seals to prevent air and water intrusion.

C. Testing & Commissioning Test each door for smooth operation, safety features, and proper seal and locking mechanisms.

Provide operational demonstrations for the client and any necessary training requirements.

Perform quality assurance, quality control and safety check to ensure safety and operation of the new completely insulated garage door system.

4. Materials & Equipment Contractor shall provide all tools, equipment, and materials necessary for insulated shop garage door installation completion.

24-gauge steel sections with baked enamel finish.

Steel galvanized J-track and hardware.

Galvanized steel aircraft grade cables.

Precision engineered springs for dependable, long-lasting operation.

Steel ball bearing safety rollers.

Inside slide lock for security.

Weather-strip on the bottom of the door for proper seal.

Doors and hardware to meet [insert applicable building codes or manufacturer standards].

5. Time Schedule Presidio Field Office operates Monday through Thursday 7:00 AM to 5:00PM

Site visit at the Presidio Field Office Tuesday or Wednesday 8:00 A.M. to 12:00 P.M. Contact information Hector Delgado 432-631-1475 hector.delgado@ibwc.gov or Fidel Baeza 432-294-0871 fidel.baeza@ibwc.gov

Installation to be scheduled during regular business hours.

6. Safety & Compliance All work to comply with OSHA safety standards and local building codes.

Contractor responsible for securing the work area during installation and perform daily housekeeping responsibilities.

7. Deliverables Three fully installed and operational 15’2”x10’ 1” insulated shop garage doors.

Removal and disposal of old doors, hardware and debris.

Warranty documentation for newly installed insulated garage, shop doors and hardware.

8. Payment

PAYMENT AND INVOICES

The contractor shall invoice for services provided in accordance with this SOW as applicable. All invoices shall be submitted via IPP. Final payment of invoice must be marked “FINAL.” Failure to adhere to these invoice instructions can result in late payment or payment rejection. IPP Payment instructions will be provided at time of award.

Other files

File Type Posted
IMG_0344.jpeg JPEG file
IMG_0347.jpeg JPEG file
IMG_0345.jpeg JPEG file
IMG_0346.jpeg JPEG file
Price Sheet.docx DOCX document
Applicable Terms and Conditions.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .