Statement of Work Summary: Scissor Lift Repair

This Statement of Work describes repair services for one scissor lift at Marine Corps Base Camp Pendleton, California, located in building 2251. The contractor must provide all labor, tools, equipment, and materials necessary to repair the scissor lift to restore it to safe and operational condition. Primary responsibilities include conducting a site visit on 30 July 2026 at 8:30 AM PST to evaluate the equipment and identify the malfunction; replacing the scissor lift leg assembly and hydraulics (base frame, cylinders, and hosing) to conform to the manufacturer's original operational standard; removing damaged parts and placing them outside the building; performing necessary testing and troubleshooting; and providing documentation summarizing the inspection, repairs performed, and additional maintenance recommendations. The contractor must dispose of all waste materials properly and identify hazardous waste appropriately.

Work must be performed during normal working hours of 7:30 AM to 4:30 PM, Monday through Friday, with no work on federal holidays. Quality will be measured against the description of work, contractor-quoted materials at the time of solicitation, and a 90-day warranty applies to all work performed. The Government Technical Point of Contact will inspect the job upon completion; if services do not conform to contract requirements, the contractor must re-perform the services at no additional cost to the Government. The period of performance will be determined at time of award. Contractor personnel must be registered in the Defense Biometrics Identification System (DBIDS) for base access, with credentials valid for up to three years. The Contracting Specialist is Captain Brandon Ruess, and the Regional Contracting Office is MCI-WEST, Camp Pendleton, California. The Contracting Officer is the sole authority for approving any changes to contract requirements.

View the file

Other files

File Type Posted
Question and Answers.docx DOCX document
SOW Scissor Lift Repair_V5.pdf PDF
SOW Scissor Lift Repair_V4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

SCISSOR LIFT REPAIR

1.0 BACKGROUND:

1.1 The purpose of this statement of work is to repair one (1) scissor lift in support of US military personnel and equipment aboard Marine Corps

Base (MCB) Camp Pendleton, California. The scissor lift allows warehouse personnel to safely access all levels of two horizontal carousels which is done many times daily. The scissor lift has been identified during preventative maintenance (PM) services as needing to be repaired or replaced. It is imperative that the required repairs are done as soon as possible.

2.0 SCOPE / OBJECTIVES:

2.1 The Contractor shall provide all labor, tools, equipment, and materials necessary to repair the scissor lift. The Contractor shall conduct a site visit to evaluate the equipment, identify the cause of the malfunction in order to restore the scissor lift to a safe and operational condition. Upon completion of the work, the Contractor shall verify proper equipment operation and provide documentation summarizing the inspection, repairs performed, and any additional maintenance or corrective actions recommended.

3.0 CONTRACTOR RESPONSIBILITY & TASKS

3.1 Prospective contractors are to attend a site visit at the location specified in Paragraph 5. 0 on 30 July 2026, Time 8:30 AM PST.

3.2 Contractor shall coordinate with the Government Technical Point of Contact (TPOC) date & time to conduct repairs.

3.3 The contractor shall provide all labor, tools, equipment and materials to perform the repair.

3.4 Replace scissor lift leg assembly and hydraulics (base frame, cylinders, hosing) so that the lift conforms to the manufacturers original operational standard.

3.5 Remove damaged parts and place them outside of bldg. 2251.

3.6 The contractor shall perform necessary test and troubleshooting of the lift to ensure proper operation.

3.7 The contractor is responsible for the proper disposal of all waste materials generated as part of performing work under this contract. The contractor is responsible for properly identifying hazardous waste and making proper disposal

3.8. Completed Job Inspection: This contract does not contain a Quality Assurance Surveillance Plan (QASP); however, the TPOC will inspect the job for quality upon completion. Quality will be measured in accordance with the following:

(i) Description Of Work

(ii) Contractors quoted materials at the time of the solicitation

(iii) 90-day warranty applies to all work

3.9 If the services do not conform to the contract requirements, the contractor is to re-perform the services in conformity with the contract requirements, at no additional expense to the Government

Task

Number

Work Milestone Projected Completion Date

3.1 Site Visit 30 July 2026

3.3 Furnish Materials/Parts TBD

3.4 Installation TBD

3.8 TPOC inspection of job TBD

4.0 WORKING HOURS

4.1 Service shall be provided during normal working hours, 7:30AM through 4:30PM, Monday through Friday. The Contractor shall not work on Federal Holidays. The Contractor shall schedule and arrange work to cause the least interference with the Government business and mission and make every effort to minimize the impact of the interference, inconvenience, equipment downtime, and interrupted service, etc.

5.0 PLACE OF PERFORMANCE:

5.1 Location: MCB Camp Pendleton, Ca in building 2251.

6.0 PERIOD OF PERFOMANCE

6.1 Period of performance will be determined at time of award.

7.0 CONTRACTING OFFICER AUTHORITY

171. The Contracting Officer is the only person authorized to approve any changes to the requirements of the contract, and not withstanding provisions contained elsewhere in this contract, the authority remains solely with the Contracting Officer. In the event the contractor effects any change at the direction of any person other than the contracting officer, the change will be considered to have been made without proper authority and not subject to payment the contractor.

8.0 GOVERNMENT TECHINICAL POINT OF CONTACTS

8.1 The Contracting Officer shall designate a Government Technical Point of Contact (TPOC) during the term of this contract. The

TPOC will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems within the scope of this Statement of Work. The TPOC will provide technical clarification and assistance in support of the contract requirements. The TPOC DOES NOT have the authority to make changes and/or give directions under this contract. The only authority under this contract authorized to make changes, give direction, and/or provide monetary adjustments is the Contracting Officer from the Regional Contracting Office MCI-WEST, Camp Pendleton CA.

Technical Point of Contact:

TO BE PROVIDED AT AWARD

Contracting Specialist:

Name: Captain Brandon Ruess

Email: brandon.ruess@usmc.mil

9.0 Base Access

Instructions for Camp Pendleton/MCAS Miramar/MCAS Yuma:

To gain initial access to the base, Contractors and/or Delivery Drivers must have in their possession: their contract number, delivery address, and sponsor’s contact information.

Contract Number: TO BE PROVIDED UPON AWARD

Sponsor/TPOC: TO BE PROVIDED UPON AWARD

Delivery Address: TO BE PROVIDED UPON AWARD

Contractors must be registered in the Defense Biometrics Identification System (DBIDS). It is the Contractor’s responsibility to ensure all their employees and/or subcontractors are properly registered within DBIDS.

DBIDS credentials will be valid for the duration of your contract, not to exceed three years; however, re-vetting of individuals' information will occur each year.

Contractors requiring access for over 60 days will receive a credential valid for up to one year.

Contractors requiring access for less than 60 days will receive a temporary paper pass.

Contractor Common Access Card (CAC) Eligibility: Contractor personnel authorized CACs are exempt from DBIDS enrollment.

Information regarding Base Access can be found at the following web addresses:

https://www.pendleton.marines.mil/Base-Access/Contractors-Vendors/ https://www.miramar.marines.mil/Departments/Provost-Marshal-Office/ https://www.mcasyuma.marines.mil/Base-Access/

Contractors will report to the Contractor Vetting Office (CVO) to confirm their access requirements, undergo a background check, and receive their credential/pass.

PLEASE NOTE: Individuals with active warrants may be subject to arrest on the spot.

The Government will not be responsible for any contractor access delays. Delays that may result from inadequate planning are strictly the responsibility of the contractor.

(End Statement of Work) https://www.pendleton.marines.mil/Base-Access/Contractors-Vendors/ https://www.miramar.marines.mil/Departments/Provost-Marshal-Office/