This is a Statement of Work (SOW) for scissor lift repair services at Marine Corps Base Camp Pendleton, California. The contractor must repair one scissor lift used by warehouse personnel to access horizontal carousels, restoring it to safe and operational condition per manufacturer standards. The repair scope includes replacing the leg assembly and hydraulics (base frame, cylinders, and hosing), removing damaged parts, performing testing and troubleshooting, and providing documentation of inspection and repairs performed. The contractor shall provide all labor, tools, equipment, and materials necessary for the work and is responsible for proper disposal of waste materials, including hazardous waste identification and disposal.
A mandatory site visit is scheduled for August 21, 2026, at 8:30 AM PST at MCB Camp Pendleton Building 2251, with contractor confirmation required by email to Captain Brandon Ruess (brandon.ruess@usmc.mil) no later than August 6, 2026, at 5:30 PM PST. Work shall be performed during normal business hours (7:30 AM to 4:30 PM, Monday through Friday), excluding federal holidays. The Government Technical Point of Contact (TPOC) will coordinate repair scheduling and conduct final inspection using three quality criteria: description of work, quoted materials at solicitation time, and a 90-day warranty on all work. Any non-conforming services must be re-performed at no additional government expense. The period of performance will be determined at time of award. Contractors must register in the Defense Biometrics Identification System (DBIDS) and comply with base access requirements; contractors requiring access for over 60 days receive credentials valid up to one year, while those requiring less than 60 days receive temporary paper passes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question and Answers.docx | DOCX document | |
| SOW Scissor Lift Repair_V5.pdf | ||
| SOW Scissor Lift Repair_V3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
SCISSOR LIFT REPAIR
1.0 BACKGROUND:
1.1 The purpose of this statement of work is to repair one (1) scissor lift in support of US military personnel and equipment aboard Marine Corps
Base (MCB) Camp Pendleton, California. The scissor lift allows warehouse personnel to safely access all levels of two horizontal carousels which is done many times daily. The scissor lift has been identified during preventative maintenance (PM) services as needing to be repaired or replaced. It is imperative that the required repairs are done as soon as possible.
2.0 SCOPE / OBJECTIVES:
2.1 The Contractor shall provide all labor, tools, equipment, and materials necessary to repair the scissor lift. The Contractor may conduct a site visit to evaluate the equipment, identify the cause of the malfunction in order to restore the scissor lift to a safe and operational condition. Upon completion of the work, the Contractor shall verify proper equipment operation and provide documentation summarizing the inspection, repairs performed, and any additional maintenance or corrective actions recommended.
3.0 CONTRACTOR RESPONSIBILITY & TASKS
3.1 Prospective contractors are to attend a site visit at the location specified in Paragraph 5. 0 on 21 August 2026, Time 8:30 AM
PST. Each contractor shall provide confirmation of attendance to the site visit via email to the Contract Specialist (CS) No Later
Than (NLT) 6 August 2026, Time 5:30 PM PST. The confirmation to the CS shall include the first and last name of the contractor, telephone number, and their company.
3.2 Contractor shall coordinate with the Government Technical Point of Contact (TPOC) date & time to conduct repairs.
3.3 The contractor shall provide all labor, tools, equipment and materials to perform the repair.
3.4 Replace scissor lift leg assembly and hydraulics (base frame, cylinders, hosing) so that the lift conforms to the manufacturers original operational standard.
3.5 Remove damaged parts and place them outside of bldg. 2251.
3.6 The contractor shall perform necessary test and troubleshooting of the lift to ensure proper operation.
3.7 The contractor is responsible for the proper disposal of all waste materials generated as part of performing work under this contract. The contractor is responsible for properly identifying hazardous waste and making proper disposal
3.8. Completed Job Inspection: This contract does not contain a Quality Assurance Surveillance Plan (QASP); however, the TPOC will inspect the job for quality upon completion. Quality will be measured in accordance with the following:
(i) Description Of Work
(ii) Contractors quoted materials at the time of the solicitation
(iii) 90-day warranty applies to all work
3.9 If the services do not conform to the contract requirements, the contractor is to re-perform the services in conformity with the contract requirements, at no additional expense to the Government
Task
Number
Work Milestone Projected Completion Date
3.1 Site Visit 21 August 2026
3.3 Furnish Materials/Parts TBD
3.4 Installation TBD
3.8 TPOC inspection of job TBD
4.0 WORKING HOURS
4.1 Service shall be provided during normal working hours, 7:30AM through 4:30PM, Monday through Friday. The Contractor shall not work on Federal Holidays. The Contractor shall schedule and arrange work to cause the least interference with the Government business and mission and make every effort to minimize the impact of the interference, inconvenience, equipment downtime, and interrupted service, etc.
5.0 PLACE OF PERFORMANCE:
5.1 Location: MCB Camp Pendleton, Ca in building 2251.
6.0 PERIOD OF PERFOMANCE
6.1 Period of performance will be determined at time of award.
7.0 CONTRACTING OFFICER AUTHORITY
171. The Contracting Officer is the only person authorized to approve any changes to the requirements of the contract, and not withstanding provisions contained elsewhere in this contract, the authority remains solely with the Contracting Officer. In the event the contractor effects any change at the direction of any person other than the contracting officer, the change will be considered to have been made without proper authority and not subject to payment the contractor.
8.0 GOVERNMENT TECHINICAL POINT OF CONTACTS
8.1 The Contracting Officer shall designate a Government Technical Point of Contact (TPOC) during the term of this contract. The
TPOC will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems within the scope of this Statement of Work. The TPOC will provide technical clarification and assistance in support of the contract requirements. The TPOC DOES NOT have the authority to make changes and/or give directions under this contract. The only authority under this contract authorized to make changes, give direction, and/or provide monetary adjustments is the Contracting Officer from the Regional Contracting Office MCI-WEST, Camp Pendleton CA.
Technical Point of Contact:
TO BE PROVIDED AT AWARD
Contracting Specialist:
Name: Captain Brandon Ruess
Email: brandon.ruess@usmc.mil
9.0 Base Access
Instructions for Camp Pendleton/MCAS Miramar/MCAS Yuma:
To gain initial access to the base, Contractors and/or Delivery Drivers must have in their possession: their contract number, delivery address, and sponsor’s contact information.
Contract Number: TO BE PROVIDED UPON AWARD
Sponsor/TPOC: TO BE PROVIDED UPON AWARD
Delivery Address: TO BE PROVIDED UPON AWARD
Contractors must be registered in the Defense Biometrics Identification System (DBIDS). It is the Contractor’s responsibility to ensure all their employees and/or subcontractors are properly registered within DBIDS.
DBIDS credentials will be valid for the duration of your contract, not to exceed three years; however, re-vetting of individuals' information will occur each year.
Contractors requiring access for over 60 days will receive a credential valid for up to one year.
Contractors requiring access for less than 60 days will receive a temporary paper pass.
Contractor Common Access Card (CAC) Eligibility: Contractor personnel authorized CACs are exempt from DBIDS enrollment.
Information regarding Base Access can be found at the following web addresses:
https://www.pendleton.marines.mil/Base-Access/Contractors-Vendors/ https://www.miramar.marines.mil/Departments/Provost-Marshal-Office/ https://www.mcasyuma.marines.mil/Base-Access/
Contractors will report to the Contractor Vetting Office (CVO) to confirm their access requirements, undergo a background check, and receive their credential/pass.
PLEASE NOTE: Individuals with active warrants may be subject to arrest on the spot.
The Government will not be responsible for any contractor access delays. Delays that may result from inadequate planning are strictly the responsibility of the contractor.
(End Statement of Work) https://www.pendleton.marines.mil/Base-Access/Contractors-Vendors/ https://www.miramar.marines.mil/Departments/Provost-Marshal-Office/