This is a Statement of Work (SOW) for the Roseburg National Cemetery door replacement project issued by the U.S. Department of Veterans Affairs National Cemetery Administration. The project requires a contractor to remove and dispose of a broken door and frame, and install a new commercial door and frame on the Public Information Center (PIC) building located at 1770 W Harvard Ave, Roseburg, OR 97470.

Specific door requirements include a bronze anodized finish, narrow stiles and rails, full view, standard entry/exit handles, new deadbolt lock with lock indicator, keyed cylinders, two bronze surface mount closers, 10" bottom rails for wheelchair access, clear tempered glass, and offset pivots. The project must be completed within 60 days, with work conducted between 0800-1630 Monday-Friday. Key contacts are Cemetery Director Noel lalanne (541-826-2511) and COR Jason Becker (541-864-0737). The contractor must adhere to strict standards of conduct, ensure minimal disruption to cemetery operations, and protect existing cemetery infrastructure during the project.

View the file

Other files

File Type Posted
36C78625Q0092 RFQ Roseburg Door.docx DOCX document
Wage determination.pdf PDF
IMG_0468.jpeg JPEG file
IMG_0467.jpeg JPEG file
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of Veterans Affairs National Cemetery Administration

Roseburg National Cemetery

Scope of Work

Roseburg National Cemetery Address:

1770 W Harvard Ave, Roseburg, OR. 97470

SCHEDULE OF SERVICES:

1. GENERAL SCOPE OF WORK:

The Contractor shall furnish all materials, equipment, labor and supervision necessary to remove, and dispose of the broken door and frame, and install a new commercial door and frame on the PIC (Public Information Building), at Roseburg National Cemetery. Work is to take place between the hours of 0800-1630 Monday-Friday, if extra time is needed the contractor shall contact the COR to make arrangements.

Project Location: Roseburg National Cemetery Completion Time: 60 days Cemetery Director, Noel lalanne

TEL: 541-826-2511

noel.lalanne@va.gov

COR, Jason Becker

TEL: 541-864-0737

jason.becker@va.gov

Work in this project includes but is not limited to:

1. Remove broken door and frame at the PIC building, and dispose of material.

2. Replace doors and frame at the PIC building with commercial doors.

3. All changes to contract must be approved by the Contracting Officer

2. Door requirements:

1. Narrow Stiles and Rail for Full View

2. Bronze Anodized Finish Door(s) for Corrosion Resistance

3. Standard Entry & Exit Pull or Push Handles for easy access

4. New Deadbolt lock with Lock Indicator and Cylinder Guard

5. New Keyed Cylinders on interior and exterior for security

6. Key core is to be blank so the VA can install the existing core from the damaged doors.

7. New closer(s) to replace the existing

8. 10" Bottom Rails for Wheelchair Access Compliance

9. Clear Tempered Glass secured by new glass stops

10. Two (2) Bronze surface mount closers

11. Offset Pivots

Inside looking out Outside looking in

A. FEDERAL HOLIDAYS:

1. The cemetery will be open on one day of every HOLIDAY/three-day weekend. Additional work hours may be authorized for the convenience of the Contractor upon written approval of the COR(s).

New Year's Day

1 January

Martin Luther King's Birthday

Third Monday in January

President's Day

Third Monday in February

Memorial Day

Last Monday in May

Juneteenth

19 June

Independence Day

4 July

Labor Day

First Monday in September

Columbus Day

Second Monday in October

Veterans Day

11 November

Thanksgiving Day

Fourth Thursday in November

Christmas Day

25 December

2. When a National Holiday falls on a Sunday, the following Monday shall be observed as a National Holiday. When a National Holiday falls on a Saturday, the proceeding Friday is observed as a National Holiday by U.S. Government agencies. Also included, would be any other day, specifically declared by the President of the United States of America to be a National Holiday.

3. GENERAL REQUIREMENTS:

1. The Contractor shall submit sample and technical specifications on all materials being used in this project and shall not proceed with any work prior to approval by the Project Manager and COR. Prior to submission of any bid, the Contractor shall perform a thorough field survey of the existing conditions and features. Verify at project site the exact dimensions, clearances, and associated requirements of existing conditions to insure proper procurement and installation. Any site conditions which may cause significant deviation from the Drawings shall be brought to the attention of the COR for clarification prior to submission of the bid. The Government will make water available to the contractor for the purpose of completing the contract at no cost to the contractor

2. Before beginning any work, the Contractor shall survey the site and examine the drawings and review the scope of work to determine the extent of the work. The Contractor shall take the necessary precautions to avoid damages to existing items to remain in place, to be reused or to remain the property of the Cemetery. Any damaged items shall be repaired or replaced at the Contractors expense as directed by the COR.

3. Establish construction limits, install safety controls, and install construction fencing as approved by the COR. The Contractor shall obtain any necessary permits and cooperate with the utilities company/cemetery staff to avoid any damage or liability, and provide a safe work environment for his/her employees. The Contractor is responsible for damages to utilities, above and below ground.

4. Thoroughly clean up the work area at the end of each day’s work and at completion of the project. Leave premises clean and free of waste, scrap, used equipment or other material intentionally or incidentally delivered to the site by Contractor or Contractor’s personnel.

5. The Contractor shall protect from damage all existing improvements, equipment, structures, facilities, grounds and utilities at or near the work site or adjacent property. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuse to repair the damage promptly.

6. Upon completion of contact, deliver work complete and undamaged. Existing materials, equipment, structures, facilities, grounds and disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in good condition as existed before commencing work.

7. At Contractor’s own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor’s workmen to existing piping and consults, wires, cables, etc., of utility services or of fire protection systems, communication systems (including telephone) which are not scheduled for discontinuance or abandonment.

8. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

9. Thoroughly clean up the work area at the end of each day’s work and at the completion of the project. Leave premises clean and free of waste, scraps, used equipment or other material intentionally or accidentally delivered to the site by the Contractor or Contractor’s personnel.

10. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs and grass) on or adjacent to the work site not to be removed and do not reasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

11. The Contractor shall protect from damage all utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be made known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in the performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

12. All utilities required for the continuous operation of all existing facilities shall be maintained in service at all times except when disruptions are needed. The contractor shall inform the Cemetery Director and the Contracting Officer (CO) in writing 2 weeks prior to the need shutdown. When the option exists, implement options to minimize interruption of services to the facilities.

13. The Contractor shall coordinate with the Cemetery Director for parking, material storage, temporary portable restroom facilities and any other needs for the work. Public access to the National Cemetery shall not be impaired.

14. The Contractor shall protect form damage all existing improvements, equipment, structures, facilities, grounds and utilities at or near the work site or adjacent property. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

15. Upon completion of contact, deliver work complete and undamaged. Existing materials, equipment, structures, facilities, grounds and disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in good condition as existed before commencing work.

16. At Contractor’s own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor’s workmen to existing piping and consults, wires, cables, etc., of utility services or of fire protection systems, communication systems (including telephone) which are not scheduled for discontinuance or abandonment.

17. All work will be coordinated with the Contracting Officer’s Representative (COR). Only the Contracting Officer (CO) has the authority to make changes to the contract that affects price and/or time. Work will be conducted in such a manner to minimize the impact on the Cemetery operations.

18. Coordination of Construction with the Cemetery Director: The burial activities at a National Cemetery shall take precedence over construction activities. The Contractor must cooperate and coordinate with the Cemetery Director, through the COR, in arranging construction the construction schedule to cause the least possible interference with Cemetery activities in actual burial areas. Construction noise during the committal services shall not disturb the service. Trucks and workmen shall not pass through the service area during this period.

a. The Contractor is required to discontinue his work efficiently in advance of Easter Sunday, Mother’s Day, Father’s Day, Memorial Day, Veteran’s Day and/or Federal Holidays to permit him to clean up all areas of operation adjacent to existing burial plots before these dates.

b. Cleaning up shall include the removal of all equipment, tools, materials and debris and leaving the area in a clean, neat condition.

c. Site work will be accomplished between the hours of 8:00 and 4:30, Monday through Friday, except Federal Holiday’s. Work outside of the Cemetery’s normal operating hours of 8:00 am to 4:30 pm shall be permitted on by approval of the COR and to only meet the Period of Performance.

4. STANDARDS OF EMPLOYEE CONDUCT:

1. The National Cemetery Administration honors veterans with a final resting place and lasting memorials that commemorate their service to our Nation. National Cemeteries are national shrines. The standards of work appearance and procedures performed by the Contractor at this cemetery shall reflect this nations concern for those interred there. Due to the sensitive mission of the cemetery and exhibit absolute decorum, composure, and stability all times.

2. Contractor personnel shall be required to adhere to the following standards of dress and conduct, as briefly mentioned here while performing work in the National Cemetery. These standards are enforceable under Title 38, USC, Part 1, Chapter 9, and Section 5901.

3. Clothing shall be presentable and suitable to the work while maintaining proper appearance and decorum indicative for a National Shrine. Uniform shirts and hats are preferred. Clothing shall be clean and cleanliness and personal hygiene are imperative. T-shirts and/or tank tops as outer garments are prohibited. Protective/Safety clothing and shoes shall meet or exceed OSHA and state requirements.

4. Behavior and language must be appropriate, reverent and respectful at all times.

5. Eating and drinking (except water) is prohibited in the work areas and within the sight of a committal shelter during a service.

6. Use of intoxicating beverages, any tobacco products, and illegal drugs on the Cemetery is strictly prohibited.

7. Contractor personnel shall not lean, sit, or stand on or against headstones or monuments. No tools, equipment’s or other items will be placed on or leaned on headstones or monuments.

8. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor is expected to remove any employee(s) from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or contrary to the best interest of the Government. If the Contractor fails to act in this regard, or the reason for removal is immediately required to protect the interests of the Government, the COR may direct the removal of an employee from the premises. Contractor objections to any such action will be referred to the Contracting Officer (CO) for final resolution; however, the Contractor will first immediately comply with COR direction pending any CO final resolution at a later date or time. The Contractor will not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR and in later found to be invalid or and/or unreasonable by the Contracting Officer.

9. All work shall be performed in accordance with National, State, and Local Codes including the International Building Code (IBC), the International Mechanical Code (IMC), the International Plumbing Code (IPC), and the National Electrical Code (NEC).

All work shall be performed in accordance with the drawings and specifications. It shall be the Contractor’s responsibility to comply with all the applicable codes. The Contractor shall apply and obtain all applicable permits to comply with local, State and Federal regulations.

5. CONTRACTOR QUALITY CONTROL

1. The Contractor shall guarantee that all work done under this contract shall be free form defaults and no faulty materials or workmanship with one (1) year warranty or extended manufacturer’s warranty. The Contractor hereby agrees to repair or replace deficiencies within the specified time frame by the direction of the Contracting Officer (CO) at the Contractor’s expense. And shall be corrected to the satisfaction of the Government.

2. The Contractor shall assume sole responsibility for the safety of all persons on or about the construction site in accordance with applicable laws and codes. The contractor shall be in accordance with the safety provisions of the latest manual of accident prevention published by the Associated General Contractors of America and Division of Occupational Safety and Health (DOSH) and shall meet all safety requirements of Roseburg National Cemetery Safety Officer, Department of Veterans Affairs, OSHA, and the State.

3. The Contractor shall repair and or replace any damage done to cemetery property to its prior existing condition when altered or damaged by the Contractor at no additional cost to the Government. (e.g., damage to turf, plants, water utilities, headstones, curbs, and pavements.)

4. The Contractor shall coordinate with the COR to store any required materials or supplies prior to and during the performance of work, (i.e., storage containers, construction fencing, and portable latrines) if required by the contractor for project execution. Public access to the National Cemetery shall not be impaired.

5. The Contractor shall provide a Job Site Superintendent who speaks and write fluent English on site, and at all times when Contractor personnel are on the premises. The Job Superintendent will:

a. Review and Approve submittals

b. Inspect the quality of work performed

c. Certify the completed work for payment and other purposes

d. Ensure that a Daily Report is provided to the PM and COR by the end of each work day regardless if work was performed or not.