SOW -Replace Rollup Doors.pdf
PDF 526 KB Posted
- Attached to
- Replace Rollup Doors for Building 42 on Coast Guard Island Federal contract opportunity
- Solicitation number
- 31090PR260000383
About this file
This is a Statement of Work (SOW) for the removal and replacement of steel rolling doors and controls at Building 42 (LOGCOM) on Coast Guard Island in Alameda, California.
The contractor shall remove and dispose of the existing damaged steel rolling door assembly with pass door and motor operator, then furnish and install two new 16' X 14' heavy duty steel rolling doors. Each door must include a 3'0" X 7'0" pass door with window and frame, single-sided photo eye with reflector, and two pairs of custom steel angle photo eye protectors. Doors shall feature large curve slats of 22 gauge steel, mounted inside on the face of existing jambs. The bottom of each curtain shall be reinforced with an extruded aluminum foot piece with astragal equipped with a new monitored photo eye mounted 6" off the finished floor to meet UL-325 anti-entrapment device requirements. The photo eye must reverse the door's direction of travel from closing to opening if the beam is broken. New floor and wall-mounted protectors and photo eye protectors shall be provided and installed, with all protectors powder-coated safety yellow. The contractor shall provide all labor, equipment, and materials required for installation, testing, and certification. Work must be completed between 7:00 AM and 5:00 PM, Monday through Friday, excluding federal holidays, unless authorized otherwise. The performance period is 60 days from award receipt. Completion and acceptance will be monitored by Coast Guard Technical POC Julio S. Leto. No government-furnished equipment or materials are provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Meeting Location.pdf | ||
| Bldg 42 Rollup Replace Rollup Door Solicitation.pdf | ||
| BASE ACCESS FORM.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Remove and Replace BLDG 42 LOGCOM Rollup Doors for
Base Alameda
1. Scope
Remove and replace Steel Rolling Doors and Controls at Building 42 (LOGCOM) on Coast Guard Island, Alameda, CA.
2. Security Requirements
Vehicles must have valid registration and insurance, and vehicle operators must have a valid driver license. Due to mandatory compliance with the Real ID Act, driver’s licenses from American Samoa, Minnesota, Illinois, and Washington are NOT recognized as acceptable forms of identification.
The contractor shall clean up all areas to ensure they are clear of debris daily. At completion of the project all construction areas will be returned to original condition. The contractor shall remove all waste material generated and dispose of in accordance with industry standards and applicable environmental rules and regulations.
Minimize impact to Coast Guard operations. Work performed on board Coast Guard Island shall be completed between the hours of 7:00AM and 5:00PM, Monday through Friday (excluding Federal Holiday) unless authorized by the Contracting Officer.
3. GENERAL
Provide all labor, equipment, and material to replace, test and certify failed rolling doors located in Building 42 at Base Alameda on Coast Guard Island, Alameda, CA.
4. TECHNICAL POINT OF CONTACT DESIGNATION
The Technical POC for this project is:
Mr. Julio Leto, CIV
Secondary Technical POC:
MK2 Joshua Arnett, USCG
5. TASKS
5.01 Remove & dispose of the existing damaged steel rolling door with pass door and motor operator.
5.02 Furnish and install two (2) NEW 16' X 14' heavy duty steel rolling door, each with a 3'0" X 7'0" pass door with a window and frame, single sided photo eye with reflector, and two (2) pairs of custom steel angle photo eye protectors.
5.03 The rolling door shall be mounted inside on face of the existing jambs.
5.04 The door curtain shall be of large curve slats, 22 gauge.
5.05 The bottom of curtain shall be reinforced by an extruded aluminum foot piece with astragal to be equipped with one new monitored photo eye to meet the new UL- 325 anti-entrapment devices. New eye to be mounted 6" off the finished floor. New photo eye to reverse the direction of travel from closing to opening in the event the beam is broken.
5.06 Furnish and install NEW protectors to be mounted to the concrete floor and wall.
5.07 Furnish and install NEW photo eye protectors to help prevent them from being knocked out of alignment.
5.08 Photo eye protectors shall be powder-coated safety yellow in color.
6. GOVERNMENT FURNISHED EQUIPMENT/MATERIAL
6.01 None
7. PERFORMANCE PERIOD
7.01 The contractor shall complete the project no later than 60 days after receipt of the award.
8. ACCEPTANCE
8.01 Completion of work under this contract will be monitored and accepted by Coast Guard Technical POCs, Julio S. Leto.