SOW_Replace_EC8_Heating_Boiler.docx

DOCX document 408 KB Posted

Attached to
HEATING BOILER SYSTEM AT EC-8 CURECANTI NRA
Solicitation number
140P1222Q0037
Issued by

View the file

Other files

File Type Posted
Boiler__5_0003.jpg JPG image
Boiler__3_0003.jpg JPG image
Boiler__4_0003.jpg JPG image
Boiler__6_0003.jpg JPG image
Boiler__1_0003.jpg JPG image
Sol_140P1222Q0037_Amd_0003.pdf PDF
Boiler__2_0003.jpg JPG image
Sol_140P1222Q0037_Amd_0002.pdf PDF
Sol_140P1222Q0037_Amd_0001.pdf PDF
Sol_140P1222Q0037.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Quote 140P1222Q0037

Curecanti National Recreation Area Replace/Upgrade Heating Boiler at Law Enforcement/ Resource Management Office (EC-8)

Scope / Statement of Work (SOW)

Table of Contents

1.0 Project Description / Summary

2.0 Objectives

3.0 Background

4.0 Specific Work / Tasks

5.0 Optional Work / Tasks

6.0 Government Furnished Equipment / Materials / Other

7.0 Special Conditions / Requirements

8.0 Place of Performance

9.0 Performance Period / Schedule Requirements

1.0 PROJECT DESCRIPTION / SUMMARY:

This project will provide for the replacement the existing propane fired boiler heating system at the park’s Law Enforcement/Resource Management building (EC-8). The existing unit has exceeded its design life and is undersized and inadequate for the building’s current use. The primary work of this project includes, but is not limited to, the removal and replacement of One (1) 245 mbh Propane fired boiler unit, electrical controls and one (1) hydronic heat pump at EC-8 located at 102 Elk Creek, Gunnison CO 81230. General tasks include: Removal, replacement, balancing, and testing of the new Boiler. This includes all supplies and labor to accomplish the work. Tasks also include removal and proper disposal of the existing boiler and all debris associated with the replacement off-site.

2.0 OBJECTIVES:

The objective of this project is to provide an adequate and reliable heating system at the EC-8. All work will be in compliance with all applicable State and Federal codes and standards with respect to installation, safety, and energy performance. As a final objective, the park expects that the system shall be reliable, robust, high quality, easy to operate, maintain and operate quietly. The equipment, service parts, and troubleshooting listed are commonly used throughout the park.

3.0 BACKGROUND:

It has been determined that the existing heating boiler in EC-8 is not only beyond its design life but also undersized to provide adequate heat to the park offices housed in this building. Since the unit was originally installed, the use of this building has evolved from a storage and shop facility into a functional office that houses the majority of two of the park division’s personnel. The local climate frequently produces winter temperatures from below freezing to negative 30F for several months of the year. A reliable and adequate heating boiler system is imperative for providing employee comfort as well as protecting building plumbing and other systems.

4.0 SPECIFIC WORK / TASKS:

a. Attend pre-bid site visit.

b. Provide submittals for 299MBH (or similar output) Propane (LP) fired boiler capable of approximately 100 LF of registers in approximately of 4,500 SF of office space, thermostats, controls, expansion tank, 6 gallon glycol feeder, air separator and flue. Unit must be capable and calibrated to operate at high elevation (over 7,500ft) NPS has 5 weekdays to review approve or reject equipment proposed.

c. Remove Equipment: Boiler, controls, expansion tank, air separator and flue as required for the installation. Remove and replace five (5) zone valves. Contractor to salvage/recycle as much as possible and properly dispose of all waste associated with this project.

d. Install Equipment: Boiler (Propane Fired) to include all plumbing, propane connection and electrical connections, controls, expansion tank, glycol feeder, air separator and flue as required for the installation. This includes Startup, training and commissioning of system

e. Provide operation and service manuals for all equipment.

f. Provide written warranty for equipment and installation.

5.0 OPTIONAL WORK / TASKS:

N/A

6.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIALS / OTHER:

N/A

7.0 SPECIAL CONDITIONS / REQUIREMENTS:

a. The offices will be occupied during the project, contractor shall protect government property during the performance of the work. Contractors shall at all times maintain a safe work zone. The contractor shall work within the existing utility room, Careful consideration of sizing of the equipment is crucial as the park cannot alter the footprint of the utility room. Contractor shall be required to follow all NPS and DOI requirements regarding COVID-19 protocols including facemask wearing when inside government buildings and good practice of social distancing.

b. EQUIPMENT: Boiler (Propane Fired), Laars Mighty Therm2 cast iron boiler or approved equal. Salient characteristics for the boiler include at a minimum all of the following: Combined Water Heating (potable) and Space Heating — Water Heater, LPG propane gas fuel, freeze protection concentration does not exceed 50% and the anti-freeze contains an anti-foam agent, high altitude adaption for elevations at or above 7,500 feet above sea level, capable of providing service to 5 distinct zones through the use of zone valves (approximately 100 LF of registers at an approximate 4,500 SF of office space), minimum 299MBH (299,000 BTU) capacity.

c. Contractor is responsible for all work and materials related to the installation including Install Equipment, Boiler (Propane Fired) to include all plumbing, propane connection and electrical connections, controls, expansion tank, glycol feeder, air separator and flue as required for the installation. This includes Startup, training and commissioning of system required to complete this project. The Boiler shall be installed to existing gas, electrical, and flue inside the utility room. The contractor shall balance the new system and test functionality of system. The system shall be properly balanced, tested and performing properly before the NPS will accept the work.

d. The park requires professionally licensed journeyman level and certified HVAC technicians, plumbers and electricians to perform this work. Apprentices are allowed to perform work but only under the direct on-site supervision of a licensed journeyman level technician for the trade they are performing.

e. Equipment shall be off the shelf, commercially available: no proprietary or custom-built equipment or controls will be accepted. Submittals will be required.

f. NPS Inspections will use the latest editions of: National Electric Code, International Plumbing Code, International Mechanical Code, and manufacturer requirements as the guiding documents for inspections, acceptance or rejection of work.

8.0 PLACE OF PERFORMANCE:

Curecanti National Recreation Area Elk Creek Law Enforcement /Resource Management Building (EC-8) Gunnison, CO 81230

9.0 PERFORMANCE PERIOD / SCHEDULE REQUIREMENTS:

a. Project planning and equipment procurement can start after receipt of the notice to proceed.

b. Period of performance can be negotiated but must occur within 90 days of award. Once onsite work begins, the contractor has 5 consecutive workdays to complete the work. CO approval required prior to performing work outside normal business hours of Monday- Friday 0600 to 1630. Federal Holidays are not to be worked unless prior approval from the CO is granted.

image1.png