SOW Replace Deadman Switch.pdf

PDF 797 KB Posted

Attached to
U. S. COAST GUARD BASE ASTORIA REPLACE FUEL FARM DEADMAN VALVE
Solicitation number
70Z03325Q31190017
Issued by

About this file

This Performance Work Statement (PWS) details a contract for replacing the deadman valve and switch at the U.S. Coast Guard Base Astoria's aviation fuel farm. The project requires a contractor to remove the existing valve and switch, procure and install a new 3-inch deadman valve with specific technical features including pressure reducing, surge shutoff, and compatibility with existing fuel farm machinery. The contractor must have mechanical engineering licensing, provide a contract manager, and ensure all personnel meet security requirements.

Key project specifications include completing the work within 40 days of contract award, performing tasks Monday through Friday between 8:00am and 4:00pm, and conducting all work in compliance with OSHA safety standards. The bid walk is scheduled for January 14, 2026 at 0900 at the Warrenton, Oregon location. The contractor must provide a minimum 1-year warranty on materials and workmanship, and all work must be conducted safely with proper identification and approvals. The Contracting Officer's Representative is LT Holden Takahashi, who can be contacted at Holden.S.Takahashi@uscg.mil.

View the file

Other files

File Type Posted
Update 02 STATEMENT OF WORK Replace Deadman Switch.pdf PDF
Updated SOW Replace Deadman Switch.pdf PDF
Wage Rates Clatsop County.pdf PDF
FP SVC R.pdf PDF
FP SVC A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT – SCOPE OF WORK

U.S. COAST GUARD BASE ASTORIA REPLACE FUEL FARM DEADMAN VALVE

SECTION 1 – GENERAL INFORMATION

1.1 Scope of Work

The contractor shall provide all personnel, equipment, tools, transportation, supervision and other items and services necessary to replace the deadman valve and switch at Base Astoria’s aviation fuel farm. The contractor must perform to the standards in this Scope of Work (SOW) contract. All questions regarding this Scope of Work for Services must be sent through the US Coast Guard Contracting Officer’s Representative (COR). The COR is LT Holden Takahashi, Phone, (503) 706-3150; Email: Holden.S.Takahashi@uscg.mil.

A bid walk will be offered on Wednesday 14JAN2026 at 0900 at the below listed address. No other bid walk will be offered.

1.1.1 Place of Performance

Coast Guard Base Astoria, Warrenton Campus 2185 SE 12th Place Warrenton, OR 97146

1.2 Contractor Personnel

1.2.1 Contract Manager

The contractor must provide a contract manager who must be responsible for the performance of the work.

1.2.1.1 The contract manager or alternate(s) must have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

1.2.1.2 The contact manager and alternate or alternates must be able to read, write, speak, and understand the English language.

1.2.1.3 The contract manager’s firm must be licensed to conduct mechanical engineering work in accordance with Federal and State requirements.

1.2.2 Contractor employees

The contractor must not employ persons for work on this contract if such employee is considered by the contracting officer to be a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

1.2.2.1 Contactor personnel must present a neat appearance and be easily recognized as contractor employees.

1.2.2.2 The contractor must not employ any person who is an employee of the U. S. Government if employing that person would create a conflict of interest. Additionally, the contractor must not employ any person who is an employee of the U. S. Coast Guard unless such person seeks and receives approval according to U. S. Coast Guard regulations.

1.2.3 Security requirements

Due to heightened Security at USCG Facilities, all contractor employees performing tasks related to this SOW, while onboard a Coast Guard facility, shall have proper valid identification, specifically a Real ID.

Time spent undergoing entrance to USCG facilities will not be considered a government delay of work or differing site condition. Prior to commencing work the contractor shall send a roster to the COR which includes the names of the contractor employees who will be onsite, their dates of birth, and their license number.

1.3 Hours of Operation – Projected Date of Completion

The contractor must perform the tasks as required by the SOW under this contract during the following hours: Monday through Friday between 08:00am and 4:00pm unless other time is specified. The contractor shall have all work completed within 40 days of award of contract.

1.3.1 Holidays: If applicable.

1.3.2 Special event, or adjusted work hours: If circumstances should arise wherein the contractor desires a different work schedule as required in section 1.3 above, the contractor must request the same in writing.

Submit written request to the Contracting Point of Contact (POC) a minimum of 24 hours before the requested adjusted work schedule. If the desired schedule change is to be effective on a Monday, the request must be submitted to the (POC) prior to 9:00am on the Friday prior to commencement of work.

1.4 Invoicing

In conjunction with the subject award, proper invoices will be submitted through the Invoice Processing Platform (IPP) at https://www.ipp.gov/. IPP is a secure web-based electronic invoicing system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis (FRSTL). IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency.

Actions to take:

If you are already enrolled in IPP:

If your company is already registered to use IPP, you will not be required to re-register and you do not need to contact IPP.

If you are NOT already enrolled in IPP:

The point of contact you provided in your SAM.gov registration will receive two emails from ipp.noreply@mail.eroc.twai.gov. Please note that emails from this email address may filter into your spam or junk folder:

1. The first email will have the IPP Logon ID and a link to the IPP application.

2. A second email, which will be sent within 24 hours of the first email, contains a temporary password.

Once your contact receives these emails, please ensure they log into IPP and complete the registration process.

Once registered to use IPP, your company may submit invoices electronically, receive e-mail notifications when requests are paid, view payment history, and access remittance downloads. The e-mail notification of payment is sent when a payment is distributed to your bank account and may include the following payment information: Date of payment, dollar amount, invoice number, paying agency, payee name, and ACH trace number.

Vendor training materials, including a first time login tutorial, are available on the https://www.ipp.gov/ website. Once you have logged in to the IPP application, you will have access to user guides that provide step-by-step instructions for all IPP capabilities, ranging from creating and submitting an invoice to setting up email notifications. Live webinars are held monthly and provide a great opportunity to learn the basic of the system and to call in and ask the IPP team questions about the IPP application.

IPP Customer Support is available to assist users of the system and can answer your questions related to accessing IPP or completing the registration process.

Toll-free number: 866-973-3131 Email address: IPPCustomerSupport@fiscal.treasury.gov Hours of operation: Monday through Friday (excluding bank holidays) from 8:00 am - 6:00 pm ET

SECTION 2 – DEFINITIONS

2.1 General Definitions

When the (SOW), solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulations (FAR), the word or term has the same meaning as the definition as contained in section 2.101 of the FAR. The FAR index is available via the Internet at http://www.acqnet.gov at the end of the FAR, after the FAR Appendix.

2.1.1 Defective Service: A service or commodity output that does not meet the standard of performance requirement specified in the contract for that service or commodity.

2.1.2 Quality Assurance: A planned and systematic pattern of all government actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. Quality assurance refers to actions by the government assurance functions for a contracted service.

2.1.2 Quality Control: Those actions taken by a contractor to control the production of outputs to ensure that they conform to the contract requirements.

2.1.3 Technical Definitions: Not applicable to contract.

SECTION 3 – GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1 General Information:

The Government must provide the facilities, equipment, materials, and services listed here:

3.1.1 On-site parking for contractor vehicles

3.1.2 120V Electricity necessary for use by contractor in conjunction with this contract

SECTION 4 – CONTRACTOR FURNISHED ITEMS AND SERVICES

Except for those items, services, or commodities specifically stated in section 3 as government furnished, the contractor must furnish everything needed to perform this contract according to all its terms.

SECTION 5 – SPECIFIC TASKS

The deadman safety valve at the aviation fuel farm is stuck in the open position, creating risk of a runaway spill when fueling helicopters. This Scope of Work requires the contractor to replace the valve, switch, and associated hardware. Following replacement, the contractor shall test the functionality of the new deadman valve and switch.

5.1 Selective Demolition

5.1.1 The contractor shall remove and dispose of offsite the existing deadman valve.

5.1.2 The contractor shall remove and dispose of offsite the existing deadman valve switch and cable reel.

5.1 Valve and Switch Installation

5.2.1 The contractor shall select, procure, and install a valve that satisfies the requirements of Section 5.3 and 5.4., and is compatible with the rest of the fuel farm machinery.

5.2.2 The contractor shall select, procure, and install a deadman switch (cable reel) that is compatible with the new deadman valve.

5.2.3 Following installation, the contractor shall test for full functionality after installing the new valve, to include automatic opening and closing of the valve, and full functionality of the deadman switch.

5.3 Valve Features

5.3.1 The contractor shall select a deadman valve with the following features.

5.3.2 Opening: when the lever on deadman control is depressed, pressure is relieved form the cover chamber of auxiliary Hytrol, opening auxiliary hytrol. This relieves main valve cover pressure to outlet and the main valve opens under command of the pilot system.

5.3.3 Closing: when the lever on deadman control is released, pressure is applied to the cover chamber of auxiliary Hytrol, closing auxiliary hytrol. This directs main valve inlet pressure into the cover chamber of the main valve, and the main valve closes.

5.3.4 Pressure reducing: pressure reducing control is a normally open control that senses main valve outlet pressure changes. An increase in outlet pressure tends to close control and decrease in outlet pressure tends to open control. This causes main valve cover pressure to vary and the main valve modulates (opens and closes) maintaining a relatively constant outlet pressure.

5.3.5 Surge shutoff: pressure felief control is normally closed control that responds to pressure changes sensed downstream. When downstream pressure increases to the set point of control, control opens. This directs inlet pressure into the main valve cover and the main valve closes until normal downstream pressure is restored and pressure relief control closes.

5.4 Valve Specifications

5.4.1 The contractor shall select a deadman valve with the following specifications.

5.4.2 Valve shall have a 3 inch diameter.

5.4.3 Valve shall have the following components: Hytrol (reverse flow), flow clean strainer, pressure relief control, ejector, flow control, pressure reducing control, valve position indicator, restriction assembly, quick disconnect assembly, and deadman and hose assembly.

5.3 Licensing, Certifications, and Qualifications:

5.3.1 The contractor shall be certified and licensed to conduct the work described above.

5.3.2 Prior to commencing work, the contractor shall provide the COR with digital copies of their licenses & certification.

5.4 Interferences:

5.4.1 The contractor shall be responsible for any/all interferences that may be encountered while completing this SOW.

5.5 Safety:

All work shall be conducted in a safe manner and shall comply with all applicable Federal, State, and local safety standards and requirements. Base Astoria reserves the right to inspect for compliance with safety standards and requirements. The Contractor shall comply with all Federal, State, and local laws, including

OSHA.

5.6 Operations and Storage Facilities:

The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the on-site representative with the concurrence of the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor’s performance.

5.7 Warranty

5.7.1 The contractor shall offer a minimum 1 year warranty on materials and workmanship if they execute.

SECTION 6 – ACCEPTANCE

6.1 Acceptance

6.1.1 Acceptance on behalf of the government will be made by the POC as attested to / witnessed by signatures on the contractor generated document / form per section 6.1. above.

SECTION 7 – APPLICABLE PUBLICATIONS AND FORMS

Publications and forms that apply to the (SOW) are listed below. The publications and forms have been designated as either mandatory or informational. The contractor is obligated to follow those publications and use those forms designated as mandatory to the extent specified in other sections of this (SOW). The contractor must be guided by those publications or use those forms designated as informational to the extent necessary to accomplish requirement in this (SOW).

7.1 Publications

7.1.1 OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for Construction

SECTION 8 – SITE PICTURES

Picture 1: Existing Deadman Safety Valve

Picture 2: The deadman switch is the cable reel with red and green cables; this also requires replacement