SOW - Repair Back-Up Power H11.pdf

PDF 125 KB Posted

Attached to
Repair Backup Power - Hangar 11 Federal contract opportunity
Solicitation number
W50S6L21B0001
Issued by
Department of the Army Alaska Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Repair Backup Power - Hangar 11, newest first.
File Type Posted
Bid Abstract - 21B0001.pdf PDF
W50S6L21B0001 Amendment 2 (SAM).pdf PDF
W50S6L21B0001 Amendment 1 (SAM).pdf PDF
Section 01000 General Requirements.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
W50S6L21B0001.pdf PDF
Attachment 1 - PDC Study Report.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLANNING/CONSTRUCTION SERVICES

STATEMENT OF WORK

Provide Back-Up Power, Hangar 11 (Building 16430)

FXSB200746

1. GENERAL

1. The work covered by this Statement of Work (SOW) includes providing all plant, labor, equipment, and materials required to perform planning and construction of the tasks outlined below. The contractor shall be responsible for necessary travel and services required to perform the work.

2. The contract procedures and project objective provide only general direction of what is required and does not constitute a complete explanation of the work involved. The government is relying on the contractor’s expertise in providing planning and construction that meets the intent of the task. The contractor shall work closely with designated government representative to work out details.

3. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting

Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency

Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense, Headquarters Air Force, and/or local policy. Should the Force Protection Condition

(FPCON) change, the Government may require changes in contractor security matters or processes.

4. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center

Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB)

(AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

5. Contractor Manpower Reporting Application (CMRA):

a. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the National Guard Bureau (or your organization) via a secure data collection site.

b. The contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year

(FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at http://www.ecmra.mil.

http://www.ecmra.mil/

FXSB210279 SOW (continued)

6. Work shall comply with local, state, and federal codes and applicable ANG

Engineering Technical Letters (ETLs).

7. Materials incorporated into the work shall be new.

8. The contractor is responsible for all applicable permitting (e.g. dig permits).

9. Contractor shall provide shop drawings for all work. The Government will provide, upon request (if available), existing drawings. The Contractor shall treat these existing drawings as “For Official Use Only (FOUO)” and shall either destroy them or return them to the Government once finished. The Contractor shall examine all field conditions and take field measurements to verify all conditions prior to preparing their shop drawings.

2. CONTRACT PROCEDURES

1. This contract shall be awarded on a firm fixed price basis.

2. The government will perform a site visit to show the areas where work is to be completed and answer questions.

3. The contractor will be given access to all paper copies of as-built drawings, stored in

Building 7252, pertaining to project areas.

4. The contractor shall clean up all construction debris and remove all unused materials.

5. The contractor shall walk the site with the government project manager for a final inspection to verify all tasks are complete and that objectives were achieved.

3. PROJECT OBJECTIVE

Base Bid Item

1. Install Permanent Generator: Provide/install material/equipment needed to execute

Option D/A (install adequately sized generator based on load readings and use existing manual transfer switch and panels) described in the attached engineering study report conducted by PDC dated 7 May 2021. Generator shall be self-contained

(to include dual lined fuel tank) weatherized unit and sit on top of and be anchored to concrete raised housekeeping pad. Generator shall be same brand and similar to unit installed at Hangar 18 (Building 17470) to make stocking of replacement parts easier.

Optional Bid Item

2. Install Power for Adjacent Container Facility: Install adequate power from

Hangar 11 (Building 16430) to adjacent container facility off southwest corner of

Hangar 11 as described in attached engineering study report conducted by PDC dated

7 May 2021.

FXSB210279 SOW (continued)

4. PERIOD OF PERFORMANCE (POP)

1. The POP shall be 150 days from date of the notice to proceed is issued for base bid item.

2. The POP shall be 120 days from date the notice to proceed is issued for optional bid item.

6/7/21