Attachment 1 - PDC Study Report.pdf
PDF 16 MB Posted
- Attached to
- Repair Backup Power - Hangar 11 Federal contract opportunity
- Solicitation number
- W50S6L21B0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract - 21B0001.pdf | ||
| W50S6L21B0001 Amendment 2 (SAM).pdf | ||
| W50S6L21B0001 Amendment 1 (SAM).pdf | ||
| Section 01000 General Requirements.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| SOW - Repair Back-Up Power H11.pdf | ||
| W50S6L21B0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name:
Project #:
Date:
Calculated by:
Checked by:
DIRECT COST DESCRIPTION
UNIT EQ, MATERIAL
No. UNITS COST LABOR & OTH
OPTION A
25kW Generator (Exterior) 1.00 ea
60A/3P circuit breaker (LSIG) 1.00 ea
60A ATS (Interior) 1.00 ea
100A 480V Panel and feeder (75') 1.00 ea
30kVA transformer, NEMA 1 1.00 ea
100A 208V panel and feeder (20') 1.00 ea
Relocate branch circuits (about 15 averaging 75') 1.00 ea
Site changes (trenching, pad, bollards) 1.00 ea
Fuel Tank (1000 gallon double wall on pad) 1.00 ea
ADJUSTED SUBTOTALS
CONTRACTOR O&HP
ESTIMATING CONTINGENCY
TOTAL ESTIMATED COST
Engineer's Cost Estimate
Hangar 11 Backup Power
21007AN
May 7, 2021
BKH
RDP
QUANTITY ADJUSTED
P:\2021\21007AN-Hngr11_EBG\E\Calcs\JBER Hangar 11 Engineer's Cost EstimatePage 3
Project Name:
Project #:
Date:
Calculated by:
Checked by:
DIRECT COST DESCRIPTION
UNIT EQ, MATERIAL
No. UNITS COST LABOR & OTH
OPTION C
Remove MTS and portable generator connection 1.00 ea
Refeed panel DP11-114-1S 1.00 ea
100kW Generator (Exterior with weather enclosure) 1.00 ea
100A ATS (Exterior) 480V 1.00 ea
45kVA transformer on pad (Exterior NEMA 3R) 1.00 ea
200A ATS (Exterior) 208V 1.00 ea
Relocate service feeder (480V) 1.00 ea
Relocate service feeder (208V) 1.00 ea
Site changes (trenching, pad, bollards) 1.00 ea
Parts and Labor for breaker adjustment in MDP11-114-1 1.00 ea
Fuel Tank (1000 gallon double wall on pad) 1.00 ea
Adjust 480V Service Main Breaker and Relabel 1.00 ea
ADJUSTED SUBTOTALS
CONTRACTOR O&HP
ESTIMATING CONTINGENCY
TOTAL ESTIMATED COST $
Engineer's Cost Estimate
Hangar 11 Backup Power
21007AN
May 7, 2021
BKH
RDP
QUANTITY ADJUSTED
P:\2021\21007AN-Hngr11_EBG\E\Calcs\JBER Hangar 11 Engineer's Cost EstimatePage 3
Description
Option A Option B Option C
Hangar Doors 6000
CF-1 1743
CF-2 1743
CF-3 1743
RH-1 (x21) 3590
B-1 500
B-2 500
B-3 500
CP-1 1260
CP-2 1260
CP-3 1260
CP-4 2380
CP-5 2380
CP-6 250
CP-7 250
MUA-1 9135
MUA-2 9135
UH-FG-01 100
UH-FG-02 100
SF-FG-01 1176
Lighting DP11-114-2S-2,4 2059
Lighting LP11-10-1-15,17 1911
Lighting B-1,2,3,4 1500
Lighting B-1,3,4, 5 & C-1,3,4, 6 2400
Lighting C-1,2,3,4,5 1500
Lighting LP11-118-1-21 754
Lighting LP11-110-1-23,25 1922
Lighting LP11-118-1-23,25 2382
CUH-11-03 200
EF-11-01 860
CUH-11-04 200
UH-11-02 20
CUH-11-01 200
CUH-11-02 200
2 QUAD RECEPTS 720
SF-11-01 1660
Loads (W or VA)
UH-11-02 20
CUH-11-07 200
AHU-11-02 1180
EF-11-02 110
CUH-11-06 200
UH-11-06 10
2 QUAD RECEPTS 720
AHU-11-01 1180
QUAD RECEPT 360
SF-11-02 860
SF-11-03 1750
UH-11-04 20
EF-11-04 30
EF-11-03 30
2 QUAD RECEPTS 720
AHU-11-03 1660
Entire Building (2 normal services) -
Peak Load info from meter readings
36000 (208V) &
57000 (480V)
TOTALS 14819 72543 93000
20kw 75kw 100kw
25 93.75 125
30kVA 100kVA 125kVA