SOW redacted.pdf

PDF 167 KB Posted

Attached to
Glass Enclosure Federal contract opportunity
Solicitation number
N0017823Q6893
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This statement of work outlines requirements for the installation of glass walls for a Scrum Room at the Naval Surface Warfare Center in Dahlgren, Virginia. The contractor shall provide materials including glass panels, frames, clips, and frosted vinyl to replace existing fabric partition walls with a glass enclosure. The contractor must perform a pre-site visit, deliver and assemble the materials, install the Scrum Room, and conduct a final walkthrough. The contractor's personnel are required to wear appropriate protective equipment and dispose of existing materials in accordance with regulations. The work must be completed during normal business hours on weekdays and be coordinated with the technical point of contact. The government will provide building access for the work.

View the file

Other files for this federal contract opportunity

Other files attached to Glass Enclosure, newest first.
File Type Posted
SF18 - N0017823Q6893.pdf PDF
Drawings redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTALLATION OF GLASS WALLS

STATEMENT OF WORK (SOW)

1.0 BACKGROUND

The Naval Surface Warfare Center, Dahlgren Division (NSWCDD), requires a service agreement for the procurement and installation of glass walls for the

“Scrum Room”, located in Building .

2.0 APPLICABLE DOCUMENTS

2.1 Environmental Protection Agency (EPA) Regulations;

2.2 Government Drawings (attached);

2.3 Original Equipment Manufacturer (OEM) Specifications;

2.4 Occupational Safety and Health Administration (OSHA) Regulations;

2.5 American National Standards Institute (ANSI) Business + Institutional Furniture

Manufacturers Association (BIFMA) Regulations; and

2.6 Center for Disease Control (CDC) Guidelines

3.0 REQUIREMENTS

3.1 The contractor shall provide the following materials in order to replace existing fabric partition walls with a glass wall enclosure to form a Scrum Room:

Qty Part Number Description

3 JFT5

Glass Joint Filler Tape, 1/2" Glass, 12 Meter Roll (39.370

Feet)

3 VFCR Volo Frameless Ceiling Runner, 144"

4 VFFR Volo Frameless 2-Part Floor Runner, 144"

4 VFHG108.PW48.44.5 44 5/8"W Volo Frameless 1/2" Glass, 9ft High

3 VFHG108.PW48.48.0 48"W Volo Frameless 1/2" Glass, 9ft H

1 VFVA Volo Frameless Vertical Adapter, 120"

18 TCHOOK15 Caddy Clips

1 VCHRCE Volo; Connector Horizontal Reveal Crown 144"L

1 VCVWSA.108 Volo; Connector Wall Start Adjustable; 108"H

18 VRGBLOCK14 Volo Reveal 1" Grid Block, Tile Recess 1/4

1 VDFPFHH2391080L

Volo; Swing Door Panel, Lh, 2" Base, Full Height, 39"W

X 108"H

1 VDUAFHH39108L

Volo; 39'w Aluminum Swing Door, Fiull Height, 9ft Or

Less; Left Hand

1 4835 Frosted Window Vinyl Roll

3.2 The contractor shall perform a pre-site visit to take exact measurements.

3.3 The contractor shall deliver materials, assemble and install the Scrum Room.

3.4 The contractor shall conduct a final walk through at the conclusion of the work.

3.5 The Contractor personnel shall wear personal protective equipment in accordance with

OSHA and ANSI BIFMA regulations and CDC guidelines throughout the project.

3.6 The Contractor shall protect Government property from damage or disfigurement.

3.7 The Contractor shall keep all supplies, equipment, and tools out of traffic lanes or other areas where they might create a hazard.

3.8 At the end of each work period, the Contractor shall secure all supplies, equipment and tools, and clean up the work areas.

3.9 The contractor shall perform all work at the NSWCDD located in Dahlgren, Virginia during normal working hours, Monday through Friday, 0700-1600.

3.10 The contractor shall dispose of old existing materials IAW EPA regulations.

3.11 The contractor shall coordinate all work with the technical point of contact identified below.

4.0 GOVERNMENT-FURNISHED PROPERTY/MATERIAL/INFORMATION

(GFP/GFM/GFI)

4.1 The Government will provide access to Building for work completion.

5.0 SECURITY

All work that is to be performed under this contract is unclassified. Contractor personnel are required to be escorted at all times while performing this work.

6.0 TRAVEL

The Contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and must be coordinated with the technical point of contact. All travel shall be conducted in accordance with the Federal Travel Regulations (FTR).

7.0 TECHNICAL POINT OF CONTACT