This statement of work outlines the requirement to purchase a Hydrotherm Model KN-10 Series boiler to replace an existing, unrepairable boiler at Joint Base San Antonio Randolph in Texas. The new boiler must be delivered by 30 days after contract award. Key specifications of the required boiler include a capacity of 900 MBH, natural gas firing, and operating pressure of 20 PSI. The statement of work also lists component requirements and operational parameters. The related federal contract opportunity is a solicitation issued by the Department of the Air Force to fulfill this boiler replacement requirement. Interested parties must submit a response by the stated suspense date to the identified point of contact. The contractor must provide a one year warranty on materials and honor the manufacturer's warranty, and also add an additional five year warranty.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Reference Pictures.docx | DOCX document | |
| SSJ -Ran Boiler_signed.pdf | ||
| RFQ final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
To Purchas Boiler
JBSA RANDOLPH A.F.B
SCOPE OF NEED. Contracting shall purchase Hydrotherm Model # KN-10 Series KN10NS11A1E3N0N0NNYY01 (120V/60HZ). No substitutions on this product. Boiler shall be delivered to 9860 1ST ST ,JBSA Randolph, TX 78148
2. SPECIFIC TASKS. The current boiler that is there is no longer working. Boiler is unrepairable. Hydrotherm model KN-10 (120V/60) is the close fit to the foot print of the current boiler in place.
2.2. Characteristics
1. Hydrotherm Model # KN-10 (120V/60).
a. Boiler capacity (Output) @ 900 MBH
b. Fire tube boiler Hydrotherm model KN-10
c. Natural Gas
d. Operating pressure: 20 psi
e. GAS NOx emissions level: uncontrolled
f. Site gas pressure:24” Water Column
Components from Customer Unit to burner
a) Manual valve #1 1.1/4” Apollo ball
b) Honeywell motorized safety shut off valve GPR configuration RV 1.5” standard trim
Natural Gas Pilot Train (Release valve)
a) Air vent connection 2” NPT
b) Return connection 4” flanged 150 lb. F.F
c) Supply connection 4” flanged 150 lb F.F
d) Safety Valve #1- 1” 125 lb HW
e) Stack Connection 12” flanged
f) Manual gas shut off valve cock standard
g) Outlet Pressure gauge 2.5 Standard
h) Modulating Motor 0-135 OHM
i) Modulating control hot water
j) Operating temperature limit Control
k) High limit control hot water
l) Combustion Control CB780EIR
2. HOURS OF OPERATION. : Normal duty hours are from 7:00 Am to 5:00 PM, Monday thru Friday, except on government holidays. Contractor should coordinate work with 502d CES Project Government Representative Carlos Flores at 210 671-9976 or Victor Reyna 210 671 3924.
3. QUALITY ASSURANCE. The government will perform inspections of equipment upon delivery by authorized personnel from 502d CE Planning Engineering.
4. PERIOD OF PERFORMANCE: Contractor has 30 days after the contract is awarded to deliver the boiler requested.
5. CONTRACTOR’S WARRANTY: The contractor shall guarantee all materials one year warranty and the honor the manufactures warranty, also add an additional 5 yr warranty.