Sow r1.pdf

PDF 155 KB Posted

Attached to
Water Service Line
Solicitation number
246-20-Q-0097
Issued by

View the file

Other files

File Type Posted
General Decision Number OK20200036 01-31-2020.pdf PDF
SF18 (002).pdf PDF
BidDrawingsrevised 6-22-2020.pdf PDF
Bidspecs-WLX 6-10-20.pdf PDF
SF24-16d (1)Bid Bond.pdf PDF
BidSheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OK l7-E86 Participant WLX

IHS PROJECT OK 17-E86

WATERLINE EXTENSION FOR CADDO COUNTY RURAL WATER DISTRICT

#3 TO SERVE PARTICIPANT

CADDO COUNTY, OK

1.01 SUMMARY

A. Project is to extend a water-main belonging to the Caddo County Rural Water District

No.3.

B. Proposed extension is approximately 1700 feet of 4-inch SDR 11 HDPE and 8985 feet of 4-inch PDC SDR21 waterline.

1.02 LOCATION AND CONTACT INFORMATION

A. Location:

15139 County Street 2620, Binger, OK 73009

B. Contact info;

1. Caddo County Rural Water District No. 3 Randy Powers 33029 State Highway 58 Carnegie, OK 73015 Phone: 580-6542318

2. Project Engineer Shaun Wiegmann 1515 NE Lawrie Tatum Road Lawton, OK 73507 Phone: 580-354-5650

3. Contract Specialist Jeff Earnest 701 Market Drive Oklahoma City, OK 73114 405-951-3740 jeffrey.earnest@ihs.gov

1.03 STATEMENT OF WORK

A. General

1. Contractor shall inform project engineer and Rural Water District at least 3 days prior to beginning construction.

2. All work is to follow attached specifications.

mailto:jeffrey.earnest@ihs.gov

3. All work is to adhere to applicable regulations and standards listed in attached specifications.

4. All work performed and material installed is to be covered by a one-year warranty.

5. Any rock removed is to be transported to the homeowners land for their future use.

B. Water main extension

1. Contractor shall furnish and install approximately 1700 feet of 4-inch SDR 11

HDPE and 8985 feet of 4-inch PDC SDR2 l water line as shown on plans.

2. Contractor shall connect to existing 4-inch PVC water main at the existing valve.

3. Gravel driveways are to be crossed utilizing open cut method and/or boring, and restored to original condition.

4. Contractor shall install flushing valve at end of water main extension.

5. Contractor shall disinfect water main as indicated in specifications, and collect bac-T samples until 2 consecutive negative samples taken at least 24 hours apart are achieved.

a. Re-sampling of positive test are to be performed at contractor expense.

C. Water Service Line

1. Rural Water District shall tap installed water main for water service line, and install meter boxes.

a: Rural Water District to set themeter.