SOW Phase 3 Air Monitoring 8th Floor CLC.pdf
PDF 320 KB Posted
- Solicitation number
- 36C24225Q0175
About this file
This Statement of Work (SOW) outlines requirements for third-party asbestos air monitoring services during renovation project #528A7-18-739 at the Syracuse VA Medical Center's 8th Floor CLC. The contractor must provide air monitoring during the abatement of approximately 3,200 linear feet of ACM thermal system pipe insulation, 3,300 SQFT of ACM flooring/mastic, and 800 SQFT of ACM lobby flooring.
The work will be performed in three parts from 11/1/2024 to 11/30/2024, with specific timeframes for Lobby Part A (5 days), Lobby Part B (4 days), and Phase 3 (12 days). The contractor must be independent from the abatement contractor, provide NYS-certified asbestos project monitors and inspectors, submit air samples to an NYSDOH ELAP-accredited laboratory, and perform air sampling using PCM/TEM analysis methods. Daily reports and a final report are required within 7 days of project completion. Pricing is structured across four CLINs covering general conditions, Phase 3 Part A (400 SQFT flooring), Phase 3 Part B (400 SQFT flooring), and Phase 3 main work (3,300 SQFT flooring and pipe chases).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications Asbsetos Modification CLC 05 08 24.pdf | ||
| 36C24225Q0175_1.docx | DOCX document | |
| Wage Determinations- 2015-4163 rev 26 7-22-24.pdf | ||
| Vol_II_Survey_Rpt_Syr_Bldg_1 Final 3-30-11.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New York/New Jersey VA Health Care Network Syracuse VA Medical Center
800 Irving Avenue | Syracuse, NY 13210 315-425-4400 www.syracuse.va.gov
Statement of Work
Project Name: Phase 3 Asbestos Air Monitoring for 8th Floor CLC Project No. 528A7-18-739
PART 1: GENERAL
The Syracuse VA Medical Center has an upcoming renovation, project #528A7-18-739 Renovate 8th Floor CLC, that requires disturbance and abatement of asbestos containing materials (ACM) and therefore requires that a 3rd party asbestos air monitoring contractor provide all labor, tools, materials, transportation, and supervision to perform quality assurance and air monitoring during the ACM removal. The abatement being completed under project #528A7-18-739 Renovate 8th Floor CLC will consist of the following, Performed in Qty (3) Parts
• Removal of approximately 3200 linear feet of <2” diameter ACM thermal system pipe insulation, mudded fittings, pipe end sealant and all other related materials.
•3300 SQFT ACM Flooring/Mastic
•800 SQFT ACM Lobby Flooring in two parts
The General Contractor/Abatement Contractor is required to remove all walls and ceilings as required to access concealed piping and ensure that all ACM is abated.
1.01 GENERAL REQUIREMENTS
A. The 3rd party asbestos air monitoring contractor shall be independent of, and not affiliated with, the asbestos abatement contractor.
B. The awardee will be provided the Asbestos Abatement Work Plan (AAWP). This contract will be to ensure the Asbestos Abatement Contractor is completing the work properly and in accordance with the associated AAWP.
C. The AAWP and this contract shall be in full accordance with all applicable federal, state and local laws, rules and regulations including the following regulations, guidance, and documents as
800 Irving Avenue | Syracuse, NY 13210 follows:
D. Place of Performance: Syracuse VA Medical Center
E. Period of Performance: 11/1/2024 to 11/30/2024
Lobby Part A Approximate Start 11/1/2024 5 days
Lobby Part B Approximate Start 11/07/2024 4 days
Phase 3 Approximate Start 11/15/2024 12 days
1. Occupational Safety and Health Administration (OSHA) Title 29 Code of Federal regulations (CFR) Part 1910.1001 - Asbestos, General Industry Standard.
2. OSHA Title 29 CFR Part 1926.1101 – Asbestos, Construction Standard.
3. United States Environmental Protection Agency (US EPA) Title 40 CFR Part 763 - Worker Protection Rule, Asbestos-In-Schools Rule, Asbestos Hazard Emergency Response Act (AHERA), AHERA - Model Accreditation Plan, and Asbestos Ban and Phase Down Rule.
4. US EPA Title 40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants
(NESHAP).
5. OSHA Title 29 CFR Part 1910.134 - Respiratory Protection Standard.
6. Other sections of OSHA Title 29 CFR 1910 (Occupational Safety and Health) and OSHA Title 29 CFR 1926 (Safety and Health Regulations for Construction) that are applicable to this project.
7. New York State Department of Labor Title 12 New York Code Rules, and Regulations (NYCRR) Industrial Code Rule 56 - Asbestos.
800 Irving Avenue | Syracuse, NY 13210
1.03 LICENSING, NOTIFICATION AND DOCUMENTATION
A. Within 10 days of award the Contractor shall submit to the Contracting Officer’s Representative (COR) a valid New York State Asbestos Training Certificate as an Asbestos Project Monitor and Inspector issued by the New York State (NYS) Commissioner of Labor per Title 12 New York Code, Rules and Regulations (NYCRR) Part 56. Contractor employees shall carry the certificate at all times while working on each and every project.
B. Within 10 days of award the Contractor shall submit to the Contracting Officer’s Representative (COR) to perform and/or collect air samples in this asbestos air monitoring project a valid New York State Asbestos Training Certificate as an Asbestos Project Air Monitor issued by the New York State (NYS) Commissioner of Labor per Title 12 New York Code, Rules and Regulations (NYCRR) Part 56 of the individuals that will be performing the air sampling. Contractor employees shall carry the certificate at all times while working on each and every project.
C. The air monitor shall submit air-monitoring samples for analysis to an accredited laboratory that is independent of and not affiliated with the asbestos air monitoring contractor and is independent of and not affiliated with the asbestos abatement contractor. The laboratory must be approved by the New York State Department of Health Environmental Laboratory Approval Program (NYSDOH ELAP) for the selected asbestos analysis methodology.
1.04 SUBMITTALS
A. One electronic submittal, containing the following, shall be emailed to the Contracting Officer for review/approval. The Project COR will provide a review/response of the submittal within fourteen (14) days from the date it was received. Submit the following;
1. Contractor’s asbestos training certificates for individuals performing the tasks.
2. Laboratories’ accreditation certificate for air sampling asbestos analysis.
3. Projects satisfactorily completed determination.
4. Monitoring project final report.
800 Irving Avenue | Syracuse, NY 13210
PART 2: SCOPE OF WORK
2.01 GENERAL
A. The contractor shall review the asbestos abatement contractor’s Asbestos Abatement Work Plan (AAWP), to include all its attachments, and obtain and/or verify all measurements and project data/information required to perform this contract. In addition, the contractor is required to review all Project Monitoring contract documents and provide written notice to the Contracting Officer of any discrepancies that are found. It is anticipated that the asbestos abatement removal will take 10 working days to complete and will be one single phase. Abatement is intended to take place during normal business hours 0700-1530 and shall be an 8-hour shift. The air monitor contract will be coordinated with the approved schedule of project #528A7-18-726 Renovate 4B for Cardiology.
2.02 AIR SAMPLING REQUIREMENTS
A. Background air sampling (prior to start of project), pre-abatement air sampling (area preparation), abatement air sampling (work in progress), and post-abatement (clearance) air sampling. The general air sampling shall be performed IAW Title 12 NYCRR Part 56. Sample analysis shall be performed using Phase Contrast Microscopy (PCM) using NIOSH 7400 methodology. If Transmission Electron Microscopy (TEM) is required, i.e., where the use of PCM has resulted in fiber counts that exceed the air clearance levels acceptable under Title 12 NYCRR Part 56, TEM may be utilized to obtain a more accurate asbestos fiber count. Where such election is made, both the PCM and TEM results must be made available to the COR. The analysis shall be performed in accordance with the procedures described in 40 CFR Part 763, Appendix A to Subpart E. Collect the general air samples, have them analyzed by the accredited laboratory and shall verbally report the results directly to the COR as soon as the results are available, typically less than 24 hours after the sample was submitted to the laboratory. Final written reports are due to the COR within 72 hours of sample collection, with copies provided to the abatement contractor. Ensure proper chain of custody records for all sampling performed.
B. In the event that air monitoring results show an airborne fiber concentration which exceeds 0.01 fibers/cubic centimeter (f/cc) or the background level, whichever is greater, the COR shall be notified and the COR shall make all necessary notifications so corrective action may begin. The
800 Irving Avenue | Syracuse, NY 13210 notification to the COR shall occur at the same time the sampling results are provided (i.e.:
within 24 hours of sample collection).
2.03 REQUIREMENTS AND AUTHORITY
A. This contract shall monitor the asbestos abatement contractor to assure any asbestos abatement work is performed in accordance with the asbestos abatement work plan and all applicable federal, state and local laws, rules, regulations and guidance including OSHA, EPA, NYS and Syracuse VA Medical Center requirements. Immediately notify the COR if the abatement plan is not being adhered to or if discrepancies are discovered.
B. Daily reports shall be prepared, maintained and submitted on a daily log of all on-site asbestos abatement activities to include, but is not limited to, number of workers, description and quantity of work performed, hours worked, weather conditions, visitors to the site, unusual events, inspections performed, air samples taken, air sample analysis results received, photograph documentation and any other appropriate and pertinent information. Provide the original version of these logs to the Syracuse VAMC COR with the project’s final report.
C. The asbestos abatement project shall be deemed satisfactorily completed when the requirements of the project’s asbestos abatement work plan have been met and, when clearance air sampling is completed and post-abatement air sampling results are below 0.01 fibers of asbestos per cubic centimeter, or the background level, whichever is greater. A post abatement inspection will be required with the Air Monitor, COR, Abatement Contractor and the General Contractor (Serviam Construction). This inspection request should be generated by the Abatement Contractor through the General Contractor (Welch Construction).
D. A final written report shall be provided to the COR and shall include summary of the work performed by the abatement contractor, post demobilization visual inspection results including damage punch-list, and the original version of the daily logs. The final report shall be submitted within seven (7) calendar days after the asbestos abatement contractor has demobilized. All records shall be maintained as required by state and federal regulations. This contract shall be completed within seven (7) calendar days after the determination has been made that the asbestos abatement project no longer requires asbestos abatement work and the asbestos abatement contractor has demobilized all asbestos abatement equipment and personnel.
800 Irving Avenue | Syracuse, NY 13210
2.04 PRICING
Pricing shall be submitted as follows:
A. CLIN 001 – General Conditions. Provide all required project documentation noted within this document and as required by 12 NYCRR 56, including final report and daily logs.
Plan Review and Final Report
B. CLIN 002 – PHASE 3 PART A Provide all necessary air monitoring sampling per 12 NYCRR 56 for a Small Asbestos Project with 400 SQFT Flooring and Mastic near elevators
Mobilize Certified Technician Air Samples, PCM Analysis TEM Analysis Phase 3 Report at end
C. CLIN 003 – PHASE 3 PART B Provide all necessary air monitoring sampling per 12 NYCRR 56 for a Small Asbestos Project for a Small Asbestos Project 400 SQFT Flooring, Mobilize Certified Technician Air Samples, PCM Analysis TEM Analysis Phase 1 Report
D. CLIN 004 – PHASE 3 Provide all necessary air monitoring sampling per 12 NYCRR 56 for a Large Asbestos Project with Small Asbestos tent enclosures at (34) pipe chases, 3300 SQFT Flooring, Mobilize Certified Technician Air Samples, PCM Analysis TEM Analysis Phase 1 Report
PART 3: QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
A. PURPOSE
800 Irving Avenue | Syracuse, NY 13210
This Quality Assurance Surveillance Plan (QASP) will be used as a guide to Government Quality Assurance Personnel (QAP).
B. PERFORMANCE AREAS
1. Quality: Conformance with statement of work and industry standards.
2. Management Responsiveness: Evaluate the adequacy of the contractor’s responsiveness and their ability to keep the government informed of work progress and provides for early problem identification and effective corrective action plans.
3. Documentation: Provides timely submission of all required documentation.
C. RATING
Contractor will be given an overall rating of Satisfactory, or Unsatisfactory using the above evaluation criteria