EMISSIONS TEST FOR PEAK SHAVE GENERATOR Federal contract opportunity
Solicitation number
70Z02723QPR000008
Issued by
Department of Homeland Security US Coast Guard

View the file

Other files for this federal contract opportunity

Other files attached to EMISSIONS TEST FOR PEAK SHAVE GENERATOR, newest first.
File Type Posted
Notification To DEQ.doc DOC document
DEQ_Stack_Test_Protocol.docx DOCX document
Wage Rates.txt TXT text file
Commercial Supplies Services Clauses Provisions.pdf PDF
RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment required to Test Stack Gasses of Peak Shave Generator to Ensure VDEQ Compliance located at the Main Gate on the USCG Base Portsmouth, 4000 Coast Guard Blvd., Portsmouth, VA 23703.

2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT five (5) days after notice to proceed and work diligently to complete the entire work as soon as possible

3. SCOPE OF WORK: Base Portsmouth has a natural gas fueled Peak Shave Generator that requires a stack emissions tests to ensure environmental compliance with VDEQ standards. The contractor shall provide all parts, materials and labor required to complete the test. The test shall adhere to the following standards: Conduct emissions test per 40 CRF Part 60 Subpart JJJJ and the Virginia Air Permit regulations for NOx, CO, VOC, and O2 on the Peak Shave Generator. Testing guidance is to be strictly adhered to and no deviations are permitted. Testing shall include a minimum of 3 test runs of 60 minutes each. Test data to be provided on site and with a follow-on summary report provided for future submittal to Virginal DEQ

4. SITE VISIT: All bidders are strongly encouraged to visit the site to field verify any/all quantities and take measurements of opening before submitting bids. Interested parties shall make arrangements for a site visit with Hayden Heyer, Gary.H.Heyer@uscg.mil (757) 284-6873 or Jon Cooper, Jonathan.A.Cooper2@uscg.mil , (757) 483-8593. The scheduling of all site visits is to be made 72 hours in advance in order for those requiring Base access to be cleared by Base Portsmouth Security. The following information is to be passed for a site visit clearance:

· Full name

· Date of birth

· Last 4 of SSN

· Verify US citizenship

5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is Hayden Heyer, Gary.H.Heyer@uscg.mil (757) 284-6873. Inquiries concerning any phase of the specification before or after award shall be made to Jon Cooper, Jonathan.A.Cooper2@uscg.mil , (757) 483-8593.

6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.

7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.

8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.

10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.

12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station’s regular hours, he may submit his request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.

13. UPON COMPLETION OF WORK: Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.

14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The Base Portsmouth Security Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.

15. SAFETY REQUIREMENTS:

1. Responsibilities:

a. All contractors working on CG Base Portsmouth shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.

b. Written notification must be provided to the Base Safety Officer, (757-638-2793) in their capacity as Base Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Base, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.

c. Copies of the following must be provided to the Base Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. A facility dig chit is required in addition to a Miss Utility dig chit. The systems on Base Portsmouth are not limited to what the City of Portsmouth has on file. To ensure electrical safety and integrity of systems, a facility chit is required.

d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on Base Portsmouth. A Facilities Division representative is required for all contractors Lock Out/Tag Out needs.

2. Rights:

a. Every employee working on Base Portsmouth has the right to a safe and healthy workplace. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

16. ENVIRONMENTAL PROTECTION REQUIREMENTS:

a. All contractors working on CG Base Portsmouth shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist, Jonathan Cooper (757.483.8593) prior to starting work and must be in accordance with CG BASE PORTSVA INST M5090.1B, the USCG Base Portsmouth Unit Environmental Guide (UEG).

b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Base Portsmouth. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.

d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.