- Replace the domestic water softener and filtration system at the Pawnee Indian Health Center
- Solicitation number
- 246-23-Q-0168
About this file
This statement of work outlines the requirements for replacing the domestic water softener and filtration system at the Pawnee Indian Health Center in Pawnee, Oklahoma. The project requires a full turn-key replacement of the existing 19-year-old system, including new water softener, carbon filtration, booster pump, UV lamp, bag and fine filtration units, and all associated piping, valves, fittings and equipment. The new system must be sized to accommodate a minimum daily water usage of 2,000 gallons and integrate with the existing ALC WebCTRL building automation system. The contractor will remove and dispose of the existing system, install all new equipment, test the new system, and train staff. The period of performance is 120 calendar days from notice to proceed. The soliciting agency is the Department of Health and Human Services Indian Health Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid sheetPawnee Water Softener Filtration ReplacementProj OK3PAA02CB - Bid Sheet.xlsx | XLSX spreadsheet | |
| SF 24 Bid Gurantee.pdf | ||
| SF25 Performance Bond.pdf | ||
| OF306AddendumToDeclarationForFederalEmp updated.pdf | ||
| ok51.txt | TXT text file | |
| SF25A Payment Bond.pdf | ||
| of0306.pdf | ||
| SF 18 RFQ Provisions Terms and Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Domestic Water Softener and Filtration System Replacement Project # OK3PAA02CB
Pawnee Indian Health Center
Pawnee, Oklahoma July 2023
Oklahoma City Area Indian Health Service
Department of Health and Human Services
TABLE OF CONTENTS:
1.0 INTRODUCTION / BACKGROUND
2.0 OBJECTIVE
3.0 SCOPE OF WORK
4.0 TASKS / REQUIREMENTS
5.0 DELIVERABLES (When and What)
6.0 PROGRESS / COMPLIANCE / INSPECTION
7.0 REFERENCES
8.0 SECURITY REQUIREMENTS
9.0 NOTES
10.0 POINT OF CONTACT
11.0 LOCATION
12.0 PERIOD OF PERFORMANCE
EXHIBITS:
Appendix & Photos & Drawings ........................................................................ Tab A & B
1.0 INTRODUCTION / BACKGROUND
The Pawnee Indian Health Center was built in 2004. The existing domestic water softener and filtration system is over 19 year old and was install when the new facility was built. The facility staff continues to frequently repair and replace parts on the softener and filtration equipment systems that is not easily available for this older model equipment.
2.0 OBJECTIVE
This project is to replace all of the existing domestic water softener and filtration system, which is over 19 years old. The maintenance staff is continuously repairing the system and replacement equipment parts, which are, nor easily available due to being older model equipment. All of the domestic water softener and filtration system is to be replaced and upgraded to allow for increasing water consumption usage in the building.
3.0 SCOPE OF WORK
The project will entail a full turn-key replacement of all the existing domestic water softener and filtration system. The current system services both the domestic hot and cold water lines to soften the incoming hard water and filter the incoming water supply.
General overview of work to be perform but not limited to the following.
1. Full turn-key service for full replacement of existing domestic water softener and filtration system to include all equipment, all controls. all piping, all fittings, all shutoff valves, all supports and accessories components required.
2. All replacement equipment is to be sized for a minimum of 2,000 gallons per day of domestic water usage for the healthcare facility building.
3. Before Demolition of existing equipment, all new equipment needs to be onsite to ensure a timely transition with the replacement with the new equipment to minimal disruption of domestic water downtime servicing the building.
4. Provide full removal of the existing equipment and offsite disposal of all removed equipment and components.
5. Provide full replacement and full installation of a new upgraded domestic water softener and filtration system. This is to include the water softener unit system, brine salt tank, booster water pump, carbon filtration system, all the inline filtration units, inline water UV light sanitizer unit and all the water piping, fitting connections, support and hangers, accessories and all system controllers.
6. Replace all exiting piping lines and install all new copper piping, valves, fittings, hangers, supports and accessories components.
7. Replace all exiting drain lines and install all new copper piping, valves, fittings, hangers, supports and accessories components.
8. Install all new shutoff ball valves on both side of all equipment to allow to shutoff pipe to remove equipment for maintenance or offline servicing per the provided layout drawings.
9. Install all new pressure gauges on both side of all equipment to allow pressure monitoring of the new domestic water softener and filtration system per the provided layout drawings.
10. Install new bypass lines with shut-off ball valves to allow the service of equipment when it is not operating correctly and to be place offline for servicing per the provided layout drawings.
11. The existing booster pump system is tie-into existing ALC WebCTRL Building Automation System (BAS). The new booster pump system is to be reconnected and program to the ALC WebCTRL BAS system to monitor the incoming city water pressure, the booster pump operational run condition, and the inlet and outlet booster pump pressure. Provide visible pressure gauges on both side of the booster pump.
12. Remove and replace the existing concrete pad used for the existing domestic water softener and replace with all new concrete pad. Minimum thickness of concrete pad to be 4 inches with rebar and wiring support to increase the pad strength.
13. Provide scheduling phasing of replacement equipment and installation of new equipment with the removal and replacement of the new concrete pad to minimize downtime of domestic water system to provide to the building.
A. The healthcare facility is currently in operational use and work to be perform will require to be schedule during normal working hours, after hours and on weekends to minimize impact to patient and operational services during normal business hours. All work to be performed is to be scheduled and coordination through the IHS COR.
B. The Contractor shall provide an itemized schedule of values by trades/Divisions and a schedule chart for the start and completion of the project. The contractor shall provide 21 calendar days advance written Notice to IHS contracting officer indicating the scheduled completion date of the domestic water softener and filtration system replacement. This is required for IHS to perform a pre-final and final inspection and acceptance prior to placing the new domestic water softener and filtration system on-line.
C. Contractor shall notify and plan and electrical shutdowns, parking lot restrictions, etc. with the COR to be at least 7 days before implementing, when possible in order to coordinate with internal departments. Schedule any shutdowns of the electrical system with the IHS COR and Facility Manager at least one to two weeks in advance in order for healthcare staff to prepare.
D. Ceiling removal required for work above ceiling is to be re-installed prior to the next business day because due to being a Health Center building that is still in operations during normal business hours.
E. The contractor shall be responsible for all aspects of providing a full turn-key services which includes for a full new equipment replacement of the domestic water softener and filtration system and removal and new replacement of the existing concrete pad, and any required related associated components according to all applicable federal and state codes. The Contractor is responsible for demolishing and removing of all components being replace on the existing domestic water softener and filtration system. The Contractor shall provide a full operational and functional replacement domestic water softener and filtration system and all new replacement piping and components.
F. Construction services consist of all new equipment installation and removal of the existing domestic water softener and filtration system. Installation of systems, components, devices and components, the workmanship shall be level and square.
G. The Contractor is responsible for producing redline drawings and verifying the accuracy of all provided IHS facility drawings. Any photos and/or sketches are for reference use only. If any clarification or additional information is required, the IHS contracting officer has to be notified with a written Request for Information (RFI)
H. Contractor shall provide all labor, materials, supplies, tools and equipment, transportation, supervision and all other necessary items for a complete and functional replacement domestic water softener and filtration system per this scope of work. Common trades which may be included on the project:
carpentry, masonry workers, electricians, laborers, power equipment operators, cement workers, etc., and include trades identified in the Davis Bacon Wage Determination and other trades common to the construction industry as required by Federal Government regulations.
I. Install of the new domestic water softener and filtration system is to be in accordance with manufacturer's installation instructions. All new equipment for the new domestic water softener and filtration system shall be anchor to the concrete pad and piping support hanger installed per federal and state mechanical code requirements.
J. Contractor shall provide all required fill-in of water softener system, filtration elements for the all filter system, and UV lighting builds required for testing and operational usage at the time of Substantial Completion of the project.
K. Upon Substantial Completion of project, Contractor shall restore to full operational condition of the domestic water softener and filtration system where work was perform.
4.0 TASKS / REQUIREMENTS
Contractor shall be responsible for all aspects of the project to include the full replacement, removal, disposal of the existing domestic water softener and filtration system and associated components with the installation of the new replacement domestic water softener and filtration system, and associated components. Furnish labor and materials to perform all work and as required as follows:
4.1 General and Administrative
A. Contractor shall provide a job superintendent to be on site for supervising and scheduling work that is being perform at the health center by the general contractor or their subcontractors.
B. Contractor shall conduct an initial on-site visit by coordinating with the assigned IHS Contracting Officer. Contractor shall verify site conditions and utilities. Prints are available for viewing.
C. All work shall conform to, and comply with, the latest editions of ALL applicable codes. The list is as follows (not inclusive): International Building Code (IBC), Occupational Safety Health Association (OSHA), International Plumbing Code (IPC), International Mechanical Code (IMC), NFPA 70 National Electric Code (NEC), NFPA 101 Life Safety Code 2012, NFPA 110 Standard for Emergency & Standby Power Systems, NFPA 37 Standard for the Installation & Use of Stationary Combustion Engines & Gas Turbines. NFPA 30 Flammable & Combustible Liquids Code, NFPA 54 National Fuel Gas Code, NFPA 58 Liquefied Petroleum Gas Code, NPFA 99 Healthcare Facilities Code, NFPA 780 Standard for the Installation of Lightning Protection Systems, FGI Guidelines for Design & Construction of
Health Care Facilities, 2018 ed., United States Environmental Protection Agency (EPA), The Joint Commission’s Comprehensive Accreditation Manual for Hospitals (CAMH), Oklahoma Department of Transportation, State of Oklahoma Rules & Regulations for Above Ground fuel storage tanks, All other referenced National Fire Protection Association (NFPA) Publications, UL 1008A for Transfer Switches, UL 2200, other UL Listings, CSA C22.2 No 178, and any other code requirements as required for domestic water softener and filtration system. General electrical: UL/ETL Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
D. Conduct operations to minimize obstruction of public and private entrances and exits; do not obstruct required exits at any time; protect persons using entrances and exits when removing or bringing in construction material. Do not close or obstruct roadways or sidewalks without coordination and permission from IHS COR/Facility Manager or Safety Officer. Protect existing structures and other elements that are not to be remove.
E. Remove debris and trash from site. Contractor shall coordinate with IHS COR/Facility
Manager with providing a staging area for a dumpster location before starting work.
Dumpster shall have mesh cover that is retain in place at all times.
F. Contractor shall provide their own Personal Protective Equipment (PPE), Lockout Tag-out equipment, infection control barriers, vehicles barriers, and any other safety related supplies, materials, and equipment to perform this work.
G. Contractor shall provide a dumpster for the removal of debris, material, and waste for the duration of the project and dispose of according to State, Federal, and EPA regulations.
Location of the dumpster shall be coordinated with the health center Facility Manager.
H. Contractor shall clean work areas daily. Keep work area, and public access areas free from accumulations of waste materials. Contractor shall remove trash daily. Construction waste shall be transported in tightly covered containers to minimize spreading of dirt and debris associated with construction.
I. Contractor shall seal any walls and roof penetration created while performing work per the scope of work. This includes any created holes and opening, and around installed pipes, conduits penetrations and punctures. Seal all penetrations in fire, smoke, and exterior walls with the appropriate material. Any penetrations through walls either interior or exterior shall be patched and repaired with the correct materials.
J. Upon completion of the work, Contractor shall remove barrier material carefully to minimize the spreading of dirt and debris associated with construction.
K. Upon completion of work inside any healthcare patient areas, Contractor shall vacuum work area with filtered vacuums, and wet mop area with cleaner/disinfectant as needed for infection control measures. Contractor shall conduct a final clean and leave the work area in a clean, neat, and orderly condition.
5.0 DELIVERABLES (When and What)
5.1. List of Deliverables by Task
Task End Result/Deliverable Schedule/Milestone
Pre-Construction Meeting
1 Schedule – Gant Chart or Bar Chart Submitted before Notice to Proceed (NTP)
2 List of On-Site and Key Personnel
Provide a list of Contractor’s staff and Sub-Contractor listing.
Contractor shall update list when changes occur.
3 Project Specific Safety Plan Prior to mobilization. As required.
4 Schedule of Values Provide at pre-construction meeting.
Progress Meetings and Correspondence 5 Daily Progress Reports Daily to COR and CO.
6 Progress Meeting As required.
Construction or Services
7 Update Progress Schedule As required.
8 Submittals As required.
9 RFIs As required.
Completion of Project
10 Punch List Substantial Completion 11 Final Punch List Final Completion
O&M and Training 12 Operations & Maintenance Manuals Substantial Completion
13 Training Schedule after Approval of O&M Manuals
As-Built Drawings & Project Records 14 Redline Drawings End of Project
Functional Testing of Systems
15 Electrical Meter Testing Provide record of testing of meters.
Warranties 16 Warranties Substantial Completion Payments
17 Progress Payments As required.
18 Schedule of Values Attachment to progress payment request.
19 Release of Claims Attachment with Final Payment
5.2. Submittals
Submittals may be shop drawings, product data, cut-sheets of equipment, material samples, sketches, manufacturer’s literature, catalog descriptions, or other description sufficient in detail for review and action to allow a decision by COR. COR shall respond within 5-7 business days.
Substitutions or deviations not approved by the COR risk rejection. Submittals and Safety Data Sheets (SDS) for chemicals and materials shall not be used until approved.
5.3. RFI
If the Contractor desires additional explanation or interpretation of this scope of work, the request must be submitted in writing as a Request for Information (RFI) to the COR and CO via electronic format.
5.4. Warranty
Warranty shall continue for a period of 1-year from the date of final acceptance of the work.
5.5. Transmittals
The contractor shall provide 2 hard copies of each deliverable, and one electronic version.
6.0 PROGRESS / COMPLIANCE / INSPECTION
The Government requires the following from contractors in order to monitor progress and ensure compliance:
6.1. Inspections
Government shall inspect regarding quality assurance and remedies regarding non-conforming work.
Upon completion, IHS will perform an on-site operational inspection, test and quality check. A pre-final and final inspection will be perform by IHS to evaluate if the trade and craft workmanship meets all IHS requirements and this scope of work and contractors submitted documents. Any discrepancies will be submitted in writing to the Contractor for corrections.
6.2. Contractor – Signing In/Out
Contractor shall coordinate with the Facility Manager on the signing in/out and scheduling of Contractor’s staff and sub-contractors in order to maintain efficient use of traffic-flow, parking, access to building and locked areas.
6.3. Life Safety and Infection Control
Before any construction or services are to be perform within the facility, the Contractor is 100% responsible for implementing and maintaining all Safety and Infection Control Measures during performance of their contract.
Initial and periodic inspection will be conducted by the COR, Safety Officer, and/or Infection Control Officer. Any life safety or infection control deficiencies will have to be immediately corrected by Contractor.
Contractor is responsible for implementing all safety and infection control measures to ensure these measures meet OSHA, NFPA Codes, ASHRE, and Joint Commission standards during the course of this project.
7.0 REFERENCES
7.1. Existing As-Builts
As-built prints for electrical are available for review. Coordinate with COR.
7.2. Quality of Workmanship
Contractor shall perform high quality trade and craft workmanship. All work must conform to, and comply with, the latest edition and version of ALL applicable codes including, but not limited to, OSHA, NFPA, IBC, FGI Guidelines for Design and Construction of Health Care Facilities 2014 edition, and Joint Commission Codes, Standards and Guidelines for Hospitals (CAMH).
8.0 SECURITY REQUIREMENTS
Contractor shall abide by all Safety, Security and Infection Control Policies and Procedures of the IHS facility.
Contractor shall comply with security requirements including personal identification. Contractor shall be responsible for providing each of their employee with an ID badge. ID badge shall be worn at all times when performing work during the course of this project.
9.0 NOTES
Not applicable
10.0 POINT OF CONTACT
IHS Oklahoma Area, COR Hugo Gonzalez, Engineer Consultant Sr. Supervisor Indian Health Service, Oklahoma City Area Division of Facilities Management Office of Environmental Health & Engineering 701 Market Drive Oklahoma City, OK 73114 Phone: (405) 951-3857 Cell: (405) 501-2697 E-mail: Hugo.Gonzalez@ihs.gov
IHS – Pawnee Indian Health Center
Tim Jim, Facility Manager Pawnee Indian Health Center 1201 Heritage Circle Pawnee, Oklahoma 74058 Phone: (918) 762-6711
Email: Timothy.Jim@ihs.gov
11.0 LOCATION
The project is location.
1201 Heritage Circle Pawnee, Oklahoma 74058
A. Contractor Work Hours:
Coordination and scheduling of work is shall be coordinated with the COR. Work performed shall be planned to minimize the impact to services to the IHS facility by working after-hours and weekends when noted in the scope of work.
Normal business hours are Monday through Friday from 7:45 a.m. to 4:30 p.m. After normal business hours are 4:30 p.m. to 10:00 p.m., and weekends are required to be pre-schedule for approval.
Contractor to minimize disruption during normal business operation and any major work that will impact operation is to perform work after-hours or weekends to complete portions of the work.
B. Tobacco Free Campus:
IHS facilities are a tobacco free campus. No smoking is permit on the campus grounds.
12.0 PERIOD OF PERFORMANCE
The period of performance for this scope of work is 120-calendar days after notice to proceed
(NTP).
Appendix A
I. Domestic Water Softener and Filtration System Replacement Requirements to be Performed:
The contractor shall be responsible for full key-turn service for the furnishing, installation and replacement of the existing domestic water softener and filtration system per the scope of work.
A. Domestic Water Softener and Filtration System Replacement General Requirements
The domestic water softener and filtration system is to have the following requirements. The contractor is to provide product submittal for IHS COR review and approval.
Pic A-1. Existing Domestic Water Softener and Filtration system
Pic A-2. Existing Domestic Water Softener and Filtration system
1. Existing Domestic Water Softener and Filtration System
The current domestic water usage is approximately 1,200 gallons per day. The new domestic water softener and filtration system is to allow a minimum increase of domestic water usage of 2,000 gallons per day.
a. The existing water softener system Columbia Water Softener System with Polyethylene Vessel Tank Brine Tank 42”x48” Height
b. The existing carbon filtration system Siemens Carbon Filtration System with Polyethylene Vessel Tank 500 Gallons 42”x72” Height
c. The existing booster pump system Grunfos Type: MLE90FA-2-182TC-D1 460V 3HP
d. The existing ultra violet disinfectant system Aquafine Model: CSL-4R 120V
e. The existing initial bag filter unit Hayword Model: FLT 4201 2" NPT 150 PSI Filter Bag #1 (7"x16")
f. The existing final filter unit Model: T910715-432 Type: ZHGAF0620-432 150 PSI
Pic A-3. Layout of Existing Domestic Water Softener and Filtration system
2. New Domestic Water Softener and Filtration System
Provide a complete functional new domestic water softener and filtration system with a new concrete pad to replace the entire existing domestic water softener and filtration system.
a. Full turn-key service for full replacement of existing domestic water softener and filtration system to include all equipment, all controls. all piping, all fittings, all shutoff valves, all supports and accessories components required.
b. All replacement equipment is to be sized for a minimum of 2,000 gallons per day of domestic water usage for the whole healthcare facility building.
c. Before Demolition of existing equipment, all new equipment needs to be onsite to ensure a timely transition with the replacement with the new equipment to minimal disruption of domestic water downtime servicing the building.
d. Provide full removal of the existing equipment and offsite disposal of all removed equipment and components.
e. Provide full removal of the existing equipment and full replacement and full installation of a new upgraded domestic water softener and filtration system. This is to include the water softener unit system, brine salt tank, booster water pump, carbon filtration system, all the inline filtration units, inline water UV light sanitizer unit and all the water piping, fitting connections, support and hangers, accessories and all system controllers.
f. Provide a new water softener system with a new operational adjustable display controller unit as existing and a replacement new salt brine tank. Fill full the brine tank with manufactured approved required bags of salts.
g. Provide a new carbon filtration system with a new operational adjustable display controller unit as existing.
h. Provide a new booster pumps system with a new operational adjustable display controller unit as existing with replacement of new pressure gauges and DDC pressure sensors tie-back and programed with graphics to the existing ALC WebCTRL building automation system and visible a replacement pressure gauges.
i. Provide a new UV lamp system with a new operational adjustable display controller unit as existing.
j. Provide a new bag filtration unit and new fine filter system as exiting filtration units. Install all new bag and fine filters and provide stock filters for four replacements.
k. Replace all exiting piping lines and install all new copper piping, valves, fittings, hangers, supports and accessories components.
l. Replace all exiting drain lines and install all new copper piping, valves, fittings, hangers, supports and accessories components.
m. Install all new shutoff ball valves on both side of all equipment to allow to shutoff pipe to remove equipment for maintenance or offline servicing per the provided layout drawings.
n. Install all new pressure gauges on both side of all equipment to allow pressure monitoring of the new domestic water softener and filtration system per the provided layout drawings.
o. Install new bypass lines with shut-off ball valves to allow the service of equipment when it is not operating correctly and to be place offline for servicing per the provided layout drawings.
p. The existing booster pump system is tie-into existing ALC WebCTRL Building Automation System (BAS). The new booster pump system is to be reconnected and program to the ALC WebCTRL BAS system to monitor the incoming city water pressure, the booster pump operational run condition, and the inlet and outlet booster pump pressure. Provide visible pressure gauges on both side of the booster pump.
q. Remove and replace the existing concrete pad used for the existing domestic water softener and replace with all new concrete pad. Minimum thickness of concrete pad to be 4 inches.
r. Provide scheduling phasing of replacement equipment and installation of new equipment with the removal and replacement of the new concrete pad to minimize downtime of domestic water system to provide to the building.
Pic A-4. Replacement Layout of New Domestic Water Softener and Filtration system.
B. Domestic Water Softener and Filtration System Testing and Quality Control Requirements
For the new domestic water softener and filtration system, perform on all equipment a full operational and functional testing as required per the manufacture requirements. Provide for all new equipment installed a listing operational and functional testing report to IHS COR review and approval. During the equipment installation, maintain workmanship with quality control inspections to ensure scope of work requirements are being meet. The contractor is to provide submittal for IHS COR review and approval.
a. Provide a full operational flushing test on the new water softener system and adjust and set the operational controller unit to flush during after-hours healthcare office hours.
b. Provide a full operational test on the new carbon filtration system and adjust and set the operational controller unit to filter during healthcare operational hours.
c. Provide a full operational test on the new booster pump system and adjust and set the operational controller unit to run the buster pump when the inline domestic water pressure is below 20 psi.
d. Provide a full operational test on the new UV lamp system and adjust and set the operational controller unit to run continuously 24/7.
e. Provide a full operational test on all new DDC pressure sensor and verify the pressure reading against the visible pressure gauges and the existing ALC WebCTRL system monitoring readings.
C. BAS Emergency Generator DDC Integration and Programming General Requirements
The contractor for the DDC integration and BAS programming of the Emergency Generator System replacement System is to use the existing Building Automation System (Automated Logic WebCTRL) and the Automated Logic Main Control Modules at the facility per the scope of work. The DDC integration phasing and BAS programming work to be perform is required to provide submittal to the IHS COR for review and final approval.
Contractor shall provide user-end training on the BAS integration performed per the scope of work.
1. Domestic Water Softener and Filtration System DDC Integration
Domestic Water Softener and Filtration System is to be DDC integrated with the existing Automated Logic DDC main modular control system per the scope of work.
a. The DDC module controls are to be placed in a NEMA control box with the control wires properly routed, zip tied together in a bunch and labeled.
b. Furnish and install engraved plastic control box tags with the control box name, equipment
DDC integrated and the control module being tied to.
2. Domestic Water Softener and Filtration BAS Integration Programming
The domestic water softener and filtration system and the booster pump system is to be BAS programmed using the existing Automated Logic BAS system to allow full access monitor of the status, and troubleshoot with the BAS system from the any BACNet points available. To monitor the city water pressure, and the booster inlet and outlet pressure and provide an alarm when the city pressure is below 20 psi and the booster pump in turn-on.
Pic A-5. Existing Booster Pump System reading Run Condition and Pressures on ALC WebCTRL System
Appendix B
I. Reference Photos of Existing Domestic Water Softener and Filtration System:
Providing reference photo showing existing condition of the existing domestic water softener and filtration system per the scope of work.
Pic B-1. Existing Domestic Water Softener and Filtration system located in the Pawnee IHC Mechanical Room.
Pic B-2. Existing Columbia Water Softener System and Salt Brine Tank.
Pic B-3.Existing Siemens Carbon Filtration System:: Carbon Filtration Unit 500 Gallons 42”x72” Height
Pic B-4. Existing Booster Pump Unit:
Pic B-5. Existing Booster Pump Unit: Grunfos Type: MLE90FA-2-182TC-D1 460V 3HP Impaller
Pic B-6. Existing Bag Filter Unit: Hayword Model: FLT 4201 2" NPT 150 PSI Filter Bag #1 (7"x16")
Pic B-7. Existing Ultra Violet Disinfectant System: Aquafine Model: CSL-4R 120V
Pic B-8. Existing Final Filter Unit: Model: T910715-432 Type: ZHGAF0620-432 150 PSI
II. Reference Layout Drawings of Existing and Replacement Domestic Water Softener and Filtration System:
Providing reference IHS layout drawing on the existing condition of the existing domestic water softener and filtration system per the scope of work.
Existing Salt Brine Tank
Existing UV Lamp
Existing Carbon Filter
Existing Water Softener
Existing Fine Filter
Existing Bag Filter
Existing Booster Pump
Main Water coming in (overhead) Main Water coming out
(overhead)
Main Water coming out going to Hot Water Tank (overhead)
Existing 12x12 Floor Drain
Existing Pressure Tank - GEO
Existing Condensing water - GEO
Elec. Power
Elec. Power
Note: Piping is not exact route.
Shown for clarity purpose.
Arrows are in the direction of flow. All piping is 2" pipe (exception: pipe from softener to salt brine tank is 12 tubing).
Existing 2" pipe with direction of flow
Legend
Existing drain pipe
Demo Damaged Concrete Pad
Existing Geothermal Equipment not to be touched
Existing Equipment Layout
New Salt Brine Tank
New UV Lamp
New Carbon Filter
New Water Softener
New Fine Filter
New Bag Filter
New Booster Pump
Main Water coming in (overhead)
Main Water coming out (overhead)
Main Water coming out going to Hot Water Tank (overhead)
Existing 12x12 Floor Drain
Existing Pressure Tank - GEO
Existing Condensing water - GEO
Elec. Power
Elec. Power
1. Piping is not exact route. Shown for clarity purpose.
Arrows are in the direction of flow.
2. Size of NEW equipment might vary and should be checked for fitment before ordering or installation.
3. Replace existing gauges and existing DDC equipment with NEW. Verify final location with COR before installation (needs to be easy access). NEW gauges and DDC equipment may be need to e added.
All New 2" pipe with direction of flow
Legend
All New drain pipe
Proposed Bypass
Proposed Bypass
Pr op os ed
B yp as s
Proposed new bypass
New Concrete Pad
Existing Geothermal Equipment not to be touched
New Equipment Layout
Proposed shut off valves
Notes
| 07-24-23 Pawnee Domestic Water Softener & Filtration System Replacement SOW Proj# OK3PAA02CB.pdf |
| Pages from 07-20-23 Pawnee Domestic Water Softener & Filtration System Replacement SOW Proj# OK3PAA02CB (p).pdf |
File details come from the government source that posted it. Updated .