- Replace the domestic water softener and filtration system at the Pawnee Indian Health Center
- Solicitation number
- 246-23-Q-0168
About this file
This document contains a bid sheet template for replacing the domestic water softener and filtration system at the Pawnee Indian Health Center. Key details include a cost breakdown template with 19 line items for materials, labor, taxes, overhead, profit, bonds, and total estimated costs. The related federal contract opportunity is solicitation number 246-23-Q-0168 from the Department of Health and Human Services Indian Health Service to replace the existing domestic water softener and filtration system. The bid sheet provides a framework for contractors to submit pricing details for the required work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID Schedule
| Bid Sheet | |
| Pawnee Indian Health Center | |
| Domestic Water Softener & Filtration System Replacement | Project # OK3PAA02CB |
| Date: |
Summary
| Direct Labor Cost | $ | |
| Direct Material Costs | $ | |
| Sales Tax ( %) | $ | |
| Subtotal: | $ | |
| Overhead ( %) | $ | |
| Subtotal: | $ | |
| Profit ( %) | $ | |
| Totla with Overhead and Profit: | $ | |
| Bond ( %) | $ |
Estimate Total: $
Cost Breakdown
| No. | Description | Material | Sales Tax ( %) | Labor | Subtotal |
| 1 | General Requirements and Admin | ||||
| 2 | GC Admin Supervision | ||||
| 3 | GC Onsite Supervision | ||||
| 4 | Domestic Water Softener & Filtration System Replacement | ||||
| 5 | Water Softner System | ||||
| 6 | Brine Tank Sytem | ||||
| 7 | Carbon Filter System | ||||
| 8 | Booster Pump Unit | ||||
| 9 | Ultra Violet Disenfectant Unit | ||||
| 10 | Bag Filter Unit | ||||
| 11 | Final Filter Unit | ||||
| 12 | Removal Existing Equipment & Piping | ||||
| 13 | Installation of New Equipment | ||||
| 14 | Installation of New Piping & Accessories | ||||
| 15 | Electrical Old Equipment Disconnect | ||||
| 16 | Electrical New Equipment Installation | ||||
| 17 | Demo of Existing Concrete Pad | ||||
| 18 | New Concrete Pad | ||||
| 19 | DDC Integration | ||||
| 20 | |||||
| 21 |
| SubTotal: | $ | $ | $ | $ | ||
| Input Sum | ||||||
| Total Above | Input Sum | |||||
| Total Above | Input Sum |