This document is a Statement of Work (SOW) for an oily waste offload service for the USCGC HEALY, a United States Coast Guard Cutter. The SOW requires a vendor to remove approximately 9,000 gallons of waste oil and oily water from the vessel's storage tanks, which were impacted by a fire main rupture. The work will be performed at the Municipal Pier in Dutch Harbor, Alaska, with a performance period from July 11-13, 2025, beginning on the first day of the cutter's arrival.
The project involves the vendor disposing of all removed fluids in compliance with federal, state, and local regulations. Cutter engineers will use their installed system to pump off the waste through shore tie connections near the fueling station, with an approximate 100-foot connection from the cutter to the loading truck. Key personnel contacts include Ryun Konze (primary POC) and LT Christopher Maytum (secondary POC) from the USCGC Healy. The solicitation number is 70Z085Q20394, and the opportunity is under the Department of Homeland Security US Coast Guard.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work: CGC HEALY Oily Waste Offload Background:
Significant amount of oily water in oily waste storage tanks due to a fire main rupture.
Statement of Work:
Vendor shall remove up to 9,000 gallons of waste oil and oily water from USCGC HEALY. Vendor shall dispose of all removed fluids in accordance with all applicable Federal, state, and local laws, ordinances, regulations.
Cutter engineers can pump off using their installed system and it would be from their shore tie connections right next to the fueling station.
The approximate connection from cutter to loading truck is 100 feet. Request contractors verify their capability once the cutter moors in Dutch Harbor.
GFE: None POP: 7/11/2025-07/13/2025*note 1 Note 1 - work can begin on the first day of cutter arrival.
Location of work to be performed:
Municipal Pier at 1171 Airport Beach Rd, Dutch Harbor, AK 99692 Key USCG Personnel Information The primary unit POC is Ryun Konze, USCGC Healy, (707) 815-7469, Ryun.J.Konze@uscg.mil.
Secondary POC is LT Christopher Maytum christopher.j.maytum@uscg.mil