SOW N4044321Q0016 DREW TIME DELAY INSTALL.pdf
PDF 78 KB Posted
- Attached to
- Provide services and parts necessary to replace time delays onboard USNS CHARLES DREW T-AKE 10
- Solicitation number
- N4044321Q0016
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS Drew
( TAKE 10 )
SERVICE ORDER CONTRACT NO. SO-20-007CHD
ITEM NO. SO-20-007 CHD CATEGORY "A" 2019-12-16
Time Delay Replacement
SO-21-006 CHD - 1
1.0 ABSTRACT
1.1 Provide services and parts necessary to replace time
delays onboard USNS CHARLES DREW T-AKE 10 pierside in Chinhae, Republic of Korea.
2.0 REFERENCES/ENCLOSURES:
2.1 Enclosure:
2.1.1 ENCL 1: Transalt TAKE18-496 Eaton Time Delay
Relay Replacement
2.1.2 ENCL 2: Confirmation of AER for Point Eight
proposal
2.1.3 ENCL 3: Point Eight Proposal Q2001592r2
3.0 ITEM LOCATION AND DESCRIPTION
3.1 Locations/Quantity
3.1.1 Location:
- LOCATION: Pierside, Chinhae, ROK
POP: 02/25/2021 – 03/07/2021
3.1.2 Quantity:
- QUANT: 25 timers (CFM per attached quote)
3.2 Bill of Material:
3.2.1 Contractor shall provide:
Tools and other material to install QTY 25 Solid State Timers
3.2.2 Additional material/components necessary to
accomplish work required are not included on the Bill of Materials, or on References 2.1 shall be provided by the Contractor.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS/SERVICES:
4.1 QTY 25 Solid State Timers for installation
5.0 NOTES:
1.1.1 To gain access to MSC vessels, contractors must
submit the following information to the Port Engineer:
SERVICE ORDER CONTRACT NO. SO-20-007CHD
SO-21-006 CHD - 2
1.1.1.1 U. S. Citizen Contractors: Full Name;
Full SSN; Ship Attending; Reason For Visit; Dates Requiring Access.
1.1.1.2 Non-U.S. Citizen Contractors: Full Name;
Date of Birth; Nationality; SSN, Passport No. or ARC No.; Ship Attending; Reason For Visit; Dates Requiring Access.
5.1 Provide all access requests to the Principal Port
Engineer, Jordan Timmons at jordan.a.timmons1@navy.mil , 757-341-5994 and Zachary Fellone at Zachary.fellone1@navy.mil, 757-362-8780.
5.2 The contractor and subcontractors must consult
Military Sealift Command’s General Technical Requirements, (GTR’s), to determine applicability to this work item. The contractor and all subcontractors must comply with all applicable GTR requirements.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional
7.0 STATEMENT OF WORK:
7.1 Contractor shall install new solid-state timers to
form a working system.
7.2 Contractor must consult with the Chief Engineer each
day before accomplishing this work and after completion to provide daily report.
7.3 Notify the Chief Engineer to provide as needed Ships
Force personnel to assist in repair.
7.4 Contractor shall diagnose any related issues with
installation.
7.5 Contractor shall provide redline drawings of new
installation, as a well as any and all manuals for new material installed.
7.6 Contractor will be provided with power and air as
needed, but should coordinate any lifts on/off vessel with Chief Mate.
7.7 Contractor will turn over any excess gear to Chief
Engineer prior to departure.
7.8 Contractor shall complete work as outline in enclosure
3.
SERVICE ORDER CONTRACT NO. SO-20-007CHD
SO-21-006 CHD - 3
7.9 Contractor shall notify the Principal Port Engineer, Jordan Timmons 757-341-5994 jordan.a.timmons1@navy.mil, upon completion of this Service Order and provide a service report.
7.10 Manufacturer's Representative:
7.10.1 Point Eight Power
1510 Engineers Road Belle Chasse, LA 70037 (504)394-6100 www.PointEightPower.com
8.0 GENERAL REQUIREMENTS:
8.1 All personnel will follow all local, state, and/or
federal COVID regulations. Where required, personnel will quarantine prior to boarding the vessel.
File details come from the government source that posted it. Updated .