SOW MXG.pdf

PDF 282 KB Posted

Attached to
Fall Restraint
Solicitation number
W50S7G26QA024
Issued by

About this file

This is a Statement of Work for annual inspection and 5-year recertification of fall arrest systems at the Fuel Cell Hangar (Building 18) to be performed by Flexible Lifeline Systems.

The contractor must conduct a comprehensive annual inspection and Engineering Design Review (EDR) of six Beam & Trolley Fall Protection Systems and Self-Retracting Lifelines (System ID By FPS 7837) located in the hangar. The annual inspection requires a competent person to perform visual and physical examination of all system components to verify compliance with manufacturer requirements and ANSI Z359.2-2017 standards. Any equipment failing inspection must be immediately red-tagged and designated out of service, with options for removal, disposal, repair, or replacement reviewed by the contractor. The EDR, to be performed by a Qualified Professional Engineer, must thoroughly review the original system design through consultation with on-site competent persons and authorized users, evaluate changes in risks, hazards, or tasks since original installation, and assess changes in regulations and standards affecting the fall protection system. All work must comply with OSHA's General Duty Clause and ANSI standards Z359.2-2017 and Z359.6-2016. Deliverables include a Proof of Inspection Certificate, a full set of drawings and report detailing systems in compliance, identified deficiencies, and recommended repairs or remediation, and Qualified Professional Engineer stamped drawings/specifications with a 5-Year EDR Certification.

View the file

Other files

File Type Posted
Solicitation - W50S7G26QA024.pdf PDF
SOW-VM.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work: Fuel Cell Hangar (Bldg 18)

1.0 Objective

This Statement of Work details the annual inspection and 5-year recertification Engineering Design

Review (EDR) to be performed by the contractor, Flexible Lifeline Systems. The objective is to ensure the fall arrest systems in the Fuel Cell Hangar are in compliance with current OSHA and ANSI Z359 standards, identify any deficiencies, and accomplish the required 5-year recertification.

2.0 Scope of Work

The contractor will perform a comprehensive annual inspection and an Engineering Design Review (EDR) for the following systems located in the Fuel Cell Hangar:

• Beam & Trolley FP Systems and SRLs (6 units, System ID By FPS 7837)

2.1 Annual Inspection

A competent person from the contractor will conduct a physical, on-site annual inspection of the systems. The inspection will include:

• Visual and physical examination of all system components to ensure good working order.

• Verification that the systems meet the manufacturer's requirements and ANSI Z359.2-2017 standards.

• Any equipment or system that fails inspection will be immediately red-tagged and designated "out of service." The contractor will then review options for removal, disposal, repair, or replacement.

2.2 Engineering Design Review (EDR)

A Qualified Professional Engineer will perform a thorough EDR to bring the systems into compliance with the latest version of ANSI Z359. The review will include:

• A thorough review of the original system design and a consultation with on-site competent persons and authorized users.

• An evaluation of any changes in risks, hazards, or tasks since the system's original installation.

• An assessment of changes in regulations, standards, or other factors affecting the fall protection system.

3.0 Compliance Standards

All work performed will be in accordance with the following standards to ensure the systems are recertified and safe for use:

• OSHA: General Duty Clause (Section 5(a)(1) of the Occupational Safety and Health Act of 1970)

• ANSI:

• ANSI Z359.2-2017 (Annual Inspection requirements)

• ANSI Z359.6-2016 (5-Year EDR requirements)

4.0 Deliverables

Upon completion of the work, the contractor shall provide:

1. Proof of Inspection Certificate.

2. A full set of drawings and a report detailing the following outcomes:

• Confirmation of systems that are in compliance with current OSHA and ANSI standards.

• A list of any deficiencies found in non-compliant systems.

• Recommended repairs or remediation required to bring all systems back into compliance.

3. Qualified Professional Engineer stamped drawings/specifications and a 5-Year EDR Certification.

File details come from the government source that posted it. Updated .