LANDSPREAD MONITORING AT MULTIPLE SITES
Solicitation number
140L6325Q0055
Issued by

About this file

This Statement of Work (SOW) details landspread monitoring for three Bureau of Land Management (BLM) petroleum contamination sites in western Alaska. The sites include the Rohn Drum Spill Site, Jacksmith Creek Wanigan Spill Site, and Uranium 2 Wanigan Spill Site, where soil containing weathered diesel fuel was previously removed and landspread. The base contract requires conducting progress monitoring in 2027 using Multi-Incremental Sampling (MIS) procedure, with diesel range organics as the primary contaminant of concern, measured by method AK-102. An optional award provides for a second round of identical monitoring. The contractor is responsible for all transportation, must work in the presence of a BLM Project Inspector, and must comply with NEPA and Section 508 accessibility requirements. The project requires submitting draft and final work plans, draft and final summary reports, and all field work must be completed by September 30, 2026, with reports delivered by February 1, 2027.

View the file

Other files

File Type Posted
Rohn_Final_RA_Report.pdf PDF
Sol_140L6325Q0055.pdf PDF
Uranium_2_Final_RA_Report.pdf PDF
Jacksmith_Creek_RA_Final_Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Landspread Monitoring at Multiple Sites

July 15, 2025

1. Introduction

The BLM performed removal actions at multiple sites in western AK. At each site, soil containing weathered diesel fuel was removed and landspread on site. The BLM is seeking to establish long term monitoring for the landspread soil at each site. The base scope of services covers a single sampling event, with associated documentation, at each site. An optional task provides for a second round of monitoring, including planning and reporting documents.

2. Site Information

Rohn Drum Spill Site BLM Case File F-030970; Section 33, Township 26 North, Range 22 West, Seward Meridian;

62°17'46.5"N/153°22'14.2"W

The remediated site is located approximately 84 miles SE of McGrath, AK. During 2010 the BLM discovered an abandoned drum labeled as being military JP4 in the spruce forest several hundred feet north of the Rohn (Tatitna) airstrip. The BLM removed the ½ full drum in 2022. The locations of the soil excavation and landspread are illustrated in Final Removal Action Report – Rohn Spill Site (August 2023), which is attached to this scope of work.

The Rohn airstrip is most practically accessed by small fixed-wing aircraft or by helicopter. Nearest cargo aircraft airstrip for staging is Farewell PAFW.

Jacksmith Creek Wanigan Spill Site BLM Case File AA-094033; SW¼ Section 16, Township 09 South, Range 73 West, Seward Meridian;

59°23'31.6"N/161°35'19.84"W

The remediated site is located approximately 20 miles NNE Goodnews Bay, AK. A wanigan (cabin on skids) and several drums were abandoned decades ago at this location. A drum leaked an unknown amount of fuel at the site. The locations of the soil excavation and landspread are illustrated in Final Removal Action Report – Jacksmith Creek Wanagin Spill Site (August 2023), which is attached to this scope of work.

The nearest cargo aircraft airstrip for staging is Goodnews Bay GNU.

Uranium 2 Wanigan Spill Site BLM Case File AA-094060; NW¼ Section 6, Township 08 North, Range 09 West, Kateel River Meridian;

66°7'30.01"N/160°37'47.76"W

The remediated site is located approximately 18 miles NW of Buckland, AK. This site is a Uranium prospect explored decades ago. Fuel was spilled at the crest of a rocky knoll were a wanigan (cabin on skids) and several drums overturned. A drum leaked an unknown amount of fuel at the wanigan site.

Bears have wallowed in the spill creating an approx. 10’x12’x1’ depression. The locations of the soil excavation and landspread are illustrated in Final Removal Action Report – Uranium2 Wanagin Spill Site (August 2023), which is attached to this scope of work.

The nearest cargo aircraft airstrip for staging is Buckland PABL

3. Contract Tasks

A. General Requirements

1. Mobilization will not occur without an ADEC approved work plan. All response to hazardous and non-hazardous solid wastes on the site shall comply with 18AAC75 and 18AAC60 respectively, and other applicable federal and State laws and regulations.

2. Field work at the Site shall be done in presence of a BLM Anchorage Field Office (AFO) Project Inspector (PI).

3. The contractor is responsible for arranging all transportation to and from each site. Travel date will be established at least 30 days in advance, although may need to be adjusted short-notice due to flying weather and aircraft availability.

4. Field work at each site shall be performed in the presence of a BLM Project Inspector (PI). .

5. Execution of this project shall comply with National Environmental Policy Act (NEPA) policy. The contractor shall decontaminate all equipment and personnel before mobilization to, and before demobilization from the site. The contractor shall thoroughly clean all vehicles, transport equipment used in access and construction, and Personal Protective Equipment (PPE) used by the on-site crew prior to moving equipment across or onto BLM managed lands to ensure it is weed and weed seed free. The contractor’s cleaning shall include high pressure washing where practical to treat the insides of bumpers, wheel wells, undercarriages, inside belly plates, excavating blades, buckets, tracks, rollers, drills, buckets, shovels, any digging tools, and any other equipment to remove potential weeds and weed seed carrying soil, greasy dirt, and vegetative material.

6. 508 Compliance: The .pdf final report shall be in Rehabilitation Act Section 508 compliant format subject to being made available to the public via being posted on the internet. Section 508 requires that Federal agencies' electronic and information technology is accessible to people with disabilities to assure accessibility by the visually impaired using assistive technology such as screen readers and refreshable Braille displays. Guidance on Section 508 compliance is available at: http://www.section508.gov/

B. Site Specific Tasks

1. Base Award

Petroleum Contaminated Soil Treatment Monitoring The contractor shall conduct progress monitoring of petroleum contaminated soil in 2027 at each of the following three sites: Rohn Drum Spill Site, Jacksmith Creek Wanigan Spill Site and Uranium 2 Wanigan Spill Site. Monitoring shall employ using Multi-Incremental Sampling (MIS) procedure The main contaminant of concern is diesel range organics, as measured using method AK-102.

2. Optional Award:

Petroleum Contaminated Soil Treatment Monitoring The contractor shall conduct progress monitoring of petroleum contaminated soil in 2027 at each of the following three sites: Rohn Drum Spill Site, Jacksmith Creek Wanigan Spill Site and Uranium 2 Wanigan Spill Site. Monitoring shall employ using Multi-Incremental Sampling (MIS) procedure The main contaminant of concern is diesel range organics, as measured using method AK-102.

McCrum, Michael A These requirements may need to be modified depending on whether BLM PI will accompany contractor during field work

3. Government Provided Equipment:

The government will not provide any equipment for this project.

4. Submittals:

Draft Work Plan: A draft work plan consisting of a general description of the work, a Field Sampling Plan and a Quality Assurance Project Plan shall be submitted to the BLM as a MS Word 2010 (Word) document. Figures may be submitted as PDF files. The contractor shall plan for BLM shall provide comments using track changes in the Word document within 10 working days. The contractor shall revise the document per BLM comments and submit a revised draft work plan as a complete PDF (figures included). The revised draft work plan shall be submitted to the ADEC for review and comment. The contractor shall submit 3 hardcopies of the final report and a fully compiled PDF.

Final Work Plan: The contractor shall modify the document per ADEC comments and compile a final version to be submitted to BLM at least 10 working days prior to start of field work (3 hardcopies and 1 in .pdf format). The final work plan shall include a copy of a letter from the ADEC indicating the plan has been approved. The final work plan addendum shall be formatted such that it is in compliance with Section 508 of the Rehabilitation Act1

Draft Summary Report: The contractor shall submit a draft report documenting site activity, sampling results, conclusions drawn from site observations and sampling data, and recommendations for the next phase of monitoring. The contractor shall plan for BLM to provide comments using track changes in the Word document within 10 working days. The contractor shall revise the document per BLM comments and submit a revised draft work plan as a complete PDF (figures included). The revised draft work plan shall be submitted to the ADEC for review and comment. The contractor shall submit 3 hardcopies of the final report and a fully compiled PDF.

Final Summary Report: The contractor shall modify the document per ADEC comments and compile a final version to be submitted to BLM at least 10 working days prior to start of field work (3 hardcopies and 1 in .pdf format). The final report shall be delivered to BLM Project Manager within 120 days of completing field work at all three sites. The final report shall be formatted such that it is in compliance with Section 508 of the Rehabilitation Act.

5. Period of Performance: All field work is to be completed by September 30, 2026, with Summary Reports delivered to BLM by February 1, 2027.

C. BLM Project Manager, Contracting Officer's Representative and Project Inspector: Francis

Marley, Anchorage Field Office, 907-621-4616, fmarley@blm.gov.

D. Attachments:

Final Removal Action Report – Rohn Spill Site (August 2023) Final Removal Action Report – Jacksmith Creek Wanagin Spill Cleanup (December 2024) Final Removal Action Report – Uranium2 Wanagin Spill Cleanup (October 2023) mailto:fmarley@blm.gov