This statement of work outlines requirements for the installation of surge protection devices at Federal Aviation Administration operational facilities. The contractor shall replace obsolete surge protection devices and improper installations with FAA-approved equipment, including surge protection devices, heavy duty fusible disconnect switches, and fuses from specified manufacturers. The contractor must provide all labor, tools, materials, and resources to complete the work, which includes evaluating electrical distributions systems, submitting installation sketches and material specifications, attending meetings, complying with safety and security requirements, and coordinating with utility companies and FAA stakeholders. The contractor shall also perform testing, inspections, and submit as-built drawings upon project completion.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 6973GH-23-R-00215 Questions and Answers.pdf | ||
| 6973GH-23-R-00215-0002.pdf | ||
| 6973GH-23-R-00215-0001.pdf | ||
| Wage Determination MN20230125 06.30.2023.pdf | ||
| SIR 6973GH-23-R-00215.pdf | ||
| Uniform Bipartisan Infrastructure Law Report.xlsx | XLSX spreadsheet | |
| Experience Information Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work NON-GFE Provided Version 4
DEPARTMENT OF TRANSPORTATION
Surge Protection Device (SPD) Installation Service
STATEMENT OF WORK
7 / 17 / 2023
TABLE OF CONTENTS
1.0 INTRODUCTION 3
1.1 Description of Work 3
1.2 Location/s of work: LOC ID / System Type / Address or Grid Cords/ Main Feeder Voltage 3
2.0 SCOPE 3
2.1 Services to be Performed 3
2.2 FAA approved equipment or equivalent 6
2.3 Quality Acceptance Inspection (QAI) 8
2.4 Pre and post construction submittals 8
3.0 APPLICABLE DOCUMENTS 8
3.1 Regulations, Specifications, Standards, and Publications 8
3.2 FAA References 9
3.3 Manufacturer Installation Instruction 9
4.0 OTHER REQUIREMENTS 9
4.1 Security 9
4.2 Safe Work Practices to Control Asbestos and Lead Dust 10
5.0 ALLOWED CONFIGURATIONS 11
5.1 If service entrance is a disconnect switch 11
5.2 If service entrance is a switchboard or switchgear 13
5.3 For ELD system 16
Surge Protection Device Installation Service
STATEMENT OF WORK (SOW)
1.0 INTRODUCTION
This Statement of Work (SOW) defines the requirements for the installation work of Surge Protection Device (SPD), maintenance disconnect, and any necessary ancillary equipment for the SPD at the Federal Aviation Administration (FAA) operational facilities listed in section 1.2. This installation work is to fix the obsolete and/or improperly installed SPD at the FAA operation facility.
These improper installations consist of (1) the SPD, being placed on the line side (utility side) of the service entrance to FAA facilities, or (2) the SPD being installed on the load side of the service entrance switch with no dedicated means of disconnect (or over current protection).
1.1 Description of Work
Work performed under this SOW is for the replacement, modification, and/or installation of SPD and maintenance disconnect for the SPD. The contractor must provide all labor, tools, and materials to complete this effort. In the process of the replacement program, obsolete SPDs (those older than UL 3rd edition devices, regardless of vendor) will be replaced with a representative set of compliant technology. Refer to Table 1 in Section 2.2 for a list of FAA-approved or equivalent equipment.
Other vendors/product numbers will be specified in subsequent communications with FAA.
1.2 Facility Information
LOC
ID
System Type
System Voltage and Main Feed Amperage
Address / Cords Required Work Hours and Work Days
Configuration (Section 5)
LSEC
NASEB /
DME
120/240 vac Panel 100 breaker 100-amp fuse 43.87612 -91.25599
Jay Bundy 0600-1630 Monday through Thursday Configuration 3
LSEA NASEB / LOC
120/240 vac Panel 100-amp breaker
43.86704 -
91.25852 Jake Kalberer 0600-1430 Monday through Friday Configuration 4
LSEE LSEE / RCAG
120 / 240 vac 225 amp breaker 200 fuse
43.82599 -
91.20443 Thomas Sherrill 0600-1430
Monday through Friday Configuration 3
RST
TOWB /
ATCT
208/120 3 phase / 200 amp fuse
43.911436 -
92.492126 Montana Sbraggia 1030 - 0500
Monday through Friday Configuration 2
MKTC NASEB / OM
120/240 vac 60 breaker amp panel
44.15264 -
93.87135 Doug Kraus 0600-1600
Monday through Thursday Configuration 4
2.0 SCOPE
The contractor must furnish the necessary personnel, equipment, materials, and other necessary resources to deliver services described in this SOW. All such items must be supplied in conformance with the terms and conditions of this SOW and contract documentation. The contractor must execute the terms of the contract and be solely responsible for the administration/management of any of its subcontracts.
2.1 Services to be Performed
a. The contractor must be licensed, as applicable, to complete electrical work.
b. The contractor must coordinate with FAA facility stakeholders and utility companies, as appropriate, for the work to be performed.
c. The contractor must evaluate distribution system as requested by FAA for modification.
• The contractor must choose the appropriate SPD based on voltage and electrical distribution configuration. See Table 1 in Section 2.2 for a list of FAA-approved or equivalent equipment.
• Reference SPD manufacture installation guide for installation procedures.
• Utilize the drawing sets provided in Section 5.0 Allowed Configurations as FAA approved installation method.
• Connections (Ref: FAA-STD-19F Chg. 3 Section 4.6.2.3). Install the maximum conductor size allowed by the SPD manufacturer, but do not exceed the incoming circuit phase and grounding conductor size permitted by the panelboard, SDM, or protected equipment. The SPD ground conductor does not need to exceed the size of the grounding electrode conductor. All conductors must be installed as short and direct as possible without loops, sharp bends, or kinks. Figures 1 and 2 provided below shows examples of direct and indirect connection method. The ground bus in the service entrance enclosure must be bonded directly to the ground terminal of the Heavy Duty Fusible Disconnect Switch or any ancillary equipment. The ground terminal of the Heavy Duty Fusible Disconnect Switch or any ancillary equipment must be bonded directly to the SPD ground terminal. The SPD enclosure must be bonded to the SPD ground terminal. The Conduit Grounding-Bushings for the rigid conduit between the Main Service Disconnect and the Heavy Duty Fusible Disconnect Switch, and the Conduit Grounding-Bushings for the rigid conduit between the Heavy Duty Fusible Disconnect Switch and the SPD must be bonded to the ground terminal of the Main Service Disconnect. Refer to the Figures 1 and 2 provided below for typical load side connection.
• Fuse: Use Class J fuses for the Heavy-Duty Safety Disconnect. It will require relocation of the fuse base assembly to the alternate position marked in the enclosure.
• Color Coding (Ref: FAA-C-1217H Chg. 1 Section 5.2.5.2.3) For 120, 120/240, 208Δ, 208Y/120 Voltage Systems:
Standard practice for FAA installations is (1) black for 120 volt systems; (2) black and red for 120/240 volt systems; (3) black (phase A), red (phase B), and blue (phase C) for 208Δ and 208Y/120 volt 3-phase systems. This color scheme is generally used within the United States. Phase conductor color coding must be continuous throughout the facility on each phase conductor to its point of use so that the conductor phase connection is readily identifiable.
For 480Δ, 480Y/277 Voltage Systems:
To ensure safety and proper operation of equipment, only one system must be used within a facility. For work at an existing facility, the color coding to be used must match the existing facility color code. For new FAA facilities, the FAA historical practice of yellow-brown-orange for phase A, B, C; local practice brown-orange-yellow for phase A, B, C is permitted. Phase conductor color coding must be continuous throughout the facility on each phase conductor to its point of use so that the conductor phase connection is readily identifiable.
Figure 1. Preferred Method
Figure 2.
d. The contractor must submit sketches of proposed work to include demolish and dispose of obsolete Surge Protection Device (SPD), material/equipment specification, and waterfall schedule as preconstruction submittals. The contractor must provide SPD conductor size as specified in FAA-STD-19F Chg. 3 section 4.6.2.3. The contractor must provide one complete set of spare fuses for all fused disconnect installations.
Note: The contractor must install SPD per the manufacture manual.
e. The contractor must attend a pre-construction meeting before the start of on-site work.
f. The contractor must ensure a safe workplace by complying with all OSHA, Fire Protection, and Life Safety requirements. This includes protecting employees and the facility from exposure to asbestos and lead dust. The contractor must utilize the National Fire Protection Association codes and/or local building codes to determine fire protection and life safety requirements.
g. The contractor must perform the Post Installation Testing such as continuity, resistance, phase rotation (if applicable), and voltage test prior to feeding equipment.
h. The contractor must attend a joint FAA finalized on-site quality acceptance inspection
(QAI).
i. The contractor must provide finalized sketches with dimensions of work performed as post construction submittals. Employ the following industry standard Color-coded mark-ups to bring an additional measure of clarity and communication to your drawing changes.:
GREEN = Items to be deleted RED = Items to add BLUE OR BLACK = Notes to the drafter that will not be added as text to the face of the drawing
2.2 FAA approved equipment or equivalent
Table 1 below lists the SPD system components or equivalent equipment designated by FAA. Any equivalent submittal items must fit the salient features and characteristics of the approved items below, as well as meet the SPD requirements according to the FAA-STD- 019F CHG 3, Section 5.7 Surge Protective Device (SPD) – Equipment Specification Requirements, including surge current lifetime rating shown in Table 11, via demonstrated laboratory test data. Any substitution must be approved by the FAA Program Manager with consultation with Power Services Group System Engineering as the OPR of FAA-STD-019f
CHG 3.
Table 1
Approved Equipment type or equivalent (Vendor)
Vendors Equivalent Part Number Vendor Part Number Description
SPD (RayCap/Rayvoss) 120-2S-M1-3-06-A-H 120/240V, 1 phase, 3-wire+G, Smaller Spaced/Wire Sizes Up to 2 AWG
SPD (RayCap/Rayvoss) 120-2S-N1-3-06-A-H 120/240V, 1 phase, 3-wire+G, Wire Sizes Up to 4/0 AWG
SPD (RayCap/Rayvoss) 120-3Y-M1-3-06-A-H 208Y/120V, 3 phase, wye, 4-wire+G, Smaller Spaced/Wire Sizes Up to 2 AWG
SPD (RayCap/Rayvoss) 120-3Y-N1-3-06-A-H 208Y/120V, 3 phase, wye, 4-wire+G, Wire Sizes Up to 4/0 AWG
SPD (RayCap/Rayvoss) 277-3Y-M1-3-06-C-H 480Y/277V, 3 phase, wye, 4-wire+G, Smaller Spaced/Wire Sizes Up to 2 AWG
SPD (RayCap/Rayvoss) 277-3Y-N1-3-06-C-H 480V, 3 phase, wye, 3-wire+G, Wire Sizes Up to 4/0 AWG
Heavy Duty Fusible Disconnect Switch (Square D/Schneider) H361 30A Fused, NEMA 1, Safety Switch, 3 poles, 20hp, 600VAC/DC, See Note 1
Heavy Duty Fusible Disconnect Switch (Square D/Schneider) H362 60A Fused, NEMA 1, Safety Switch, 3 poles, 50hp, 600VAC/DC, See Note 1
Heavy Duty Fusible Disconnect Switch (Square D/Schneider) H363 100A Fused, NEMA 1, Safety Switch, 3 poles, 100hp, 600VAC/DC, See Note 1
Heavy Duty Fusible Disconnect Switch (Square D/Schneider) H364 200A Fused, NEMA 1, Safety Switch, 3 poles, 150hp, 600VAC/DC, See Note 1
Heavy Duty Fusible Disconnect Switch (Square D/Schneider) H321 30A, Fused, NEMA 1, Safety Switch, 3 poles,
7.5 hp, 240 VAC/250DC, See Note 1
Heavy Duty Fusible Disconnect Switch (Square D/Schneider) H322 60A Fused, NEMA 1, Safety Switch, 3 poles, 15hp, 240 VAC/250DC, See Note 1
Heavy Duty Fusible Disconnect Switch (Square D/Schneider) H323 100A Fused, NEMA 1, Safety Switch, 3 poles, 30hp, 240VAC/250DC, See Note 1
Heavy Duty Fusible Disconnect Switch (Square D/Schneider) H324 200A Fused, NEMA 1, Safety Switch, 3 poles, 60hp, 240VAC/250DC, See Note 1
Heavy Duty Fusible Disconnect Switch (Square D/Schneider) VH221 30A Fused, NEMA 1, Safety Switch, 2 poles, 7.5hp, 240VAC/250DC, See Note 1
Heavy Duty Fusible Disconnect Switch (Square D/Schneider) VH222 60A Fused, NEMA 1, Safety Switch, 2 poles, 15hp, 240VAC/250DC, See Note 1
Heavy Duty Fusible Disconnect Switch (Square D/Schneider) VH223 100A Fused, NEMA 1, Safety Switch, 2 poles, 30hp, 240VAC/250DC, See Note 1
Heavy Duty Fusible Disconnect Switch (Square D/Schneider) VH224 200A Fused, NEMA 1, Safety Switch, 2 poles, 60hp, 240VAC/250DC, See Note 1
Fuses (Eaton/Bussman) LPJ30SP LPJ-SPI, 600 Vac 300 kA AC 300 Vdc 100 kA DC, 30A, See Note 2
Fuses (Eaton/Bussman) LPJ60SP LPJ-SPI, 600 Vac 300 kA AC 300 Vdc 100 kA DC, 60A, See Note 2
Fuses (Eaton/Bussman) LPJ100SP LPJ-SPI, 600 Vac 300 kA AC 300 Vdc 100 kA DC, 100A, See Note 2
Fuses (Eaton/Bussman) LPJ125SP LPJ-SPI, 600 Vac 300 kA AC 300 Vdc 100 kA DC, 125A, See Note 2
Fuses (Eaton/Bussman) LPJ200SP LPJ-SPI, 600 Vac 300 kA AC 300 Vdc 100 kA DC, 200A, See Note 2
Fuse Reducer (Eaton/Bussman) J-13 Class J fuse reducer, 30 A fuse, 100A clips, 600 Vac
Fuse Reducer (Eaton/Bussman) J-16 Class J fuse reducer, 60 A fuse, 100A clips, 600 Vac
Connector (Polaris) IPLD3/0-3 3 Port 3/0-6 AWG, UL Listed 486B Wire Connector (Dry location), See Note 3
Add after part numbers, in order:
Note 1: N for factory-installed neutral, RB for outdoor use (NEMA 3R with bolt-on hub provision), DS for outdoor/corrosion resistant (NEMA 4, 4X, and 5) Equipment Ground Kits (Al/Cu) are factory installed standard in 30-200 A Series F NEMA Type 4/4X/5 (stainless steel)
GL for factory installed Ground Kit (Al/Cu) on Series F NEMA Type 1
Note 2: 4-6 per kit (includes spare set).
Note 3: Only use if no UL Listed Lugs/space in Main Service Disconnect-will also require additional appropriate environment rated NEMA enclosure (to enclose the Polaris connectors), required conduit and connectors, elbows, and cable.
2.3 Quality Acceptance Inspection (QAI)
Before Government acceptance of the facility and equipment, a QAI must be completed by the contractor and the FAA COR together at the site. The QAI checklist found in the attachment must be used unless the FAA Resident Engineer has submitted an alternative QAI checklist before or during the Site Survey. The contractor must note that final payment will not be made until QAI is complete (with all exceptions cleared) and submitted to the CO and COR.
2.4 Pre and post construction submittals
a. Pre-construction submittals
• Project safety plan, including FAA 3900-18, Work Release Request (WRR), and plan to control asbestos and lead dust
• Proposed waterfall schedule
• Proposed installation sketches by the facility
• SPD specification by facility
• Disconnect and fuse specification by the facility
• Conductor specification sheet by the facility
• Associated hardware, fasteners, conduit specification sheet by the facility
• Grounding and bonding material specification sheet by the facility
b. Post construction submittals
• Pre-energized test data by the facility
• Finalized installation sketches by the facility
• Both contractor and FAA jointly signed QAI document by the facility
3.0 APPLICABLE DOCUMENTS
3.1 Regulations, Specifications, Standards, and Publications
The contractors are required to be in compliance with the latest version of Regulations, Specifications, Standards and Publications.
3.2 FAA References
FAA-C-1217H CHG. 1 Electrical Work, Premises Wiring
FAA-C-1391E Installation, Termination, Splicing, and Transient/Surge
Protection of Underground Electrical Distribution System Power Cables
FAA-STD-019F CHG 3 Lightning and Surge Protection, Grounding, Bonding, and Shielding Requirements for Facilities and Electronic Equipment
JO 3900.64 Air Traffic Organization Electrical Safety Program
JO 3900.57A CHG 1 Environmental and Occupational Safety and Health (EOSH)
Requirements in the Planning and Execution of Construction and Maintenance Activities at National Airspace System (NAS) Facilities
NFPA 70 National Electrical Code
NFPA 70E Standard for Electrical Safety in the Workplace
FAA 3900-18 Pre-Construction/Installation Environmental and Occupational
Safety and Health Checklist
FAA Asbestos O&M SOP-2 ATO SOP for Drilling into Asbestos Containing Building Materials with a Milwaukee Attachment
FAA LBP SOP-4 ATO SOP for Drilling into Materials Coated with Lead-based Paint using the Milwaukee Attachment
3.3 Manufacturer Installation Instruction
The contractor must follow the installation instructions and guides published by the equipment manufacturer.
4.0 OTHER REQUIREMENTS
4.1 Security
Security will be addressed on a site-by-site basis. The contractor must comply with FAA security requirements as defined in this contract (Ref. Section I). This includes but is not limited to FAA facility access, contractor personnel security screenings, and access to FAA information systems and data. Most Contractor work at Government locations will be performed within secure facilities.
The contractor must be responsible for safeguarding all Government property provided for Contractor use or under Contractor control. Whenever a work area is to be unattended for an extended period, Government facilities, equipment, and materials must be secured. The contractor must provide the COR and CO with a listing of Government provided property per employee and maintain that property list. The contractor must establish and implement methods of ensuring that all keys, identification cards, and vehicle decals issued to the Contractor by the Government are not lost or misplaced and not used by unauthorized persons. Issued keys must be turned in by personnel who no longer require access to locked areas. The contractor must immediately report occurrences of lost or duplicate keys to the COR or CO. The contractor must prohibit the use of Government issued keys by persons other than the Contractor’s employees. The contractor must prohibit the opening of locked areas by the Contractor’s employees to permit the entrance of persons other than the contractor’s employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR or CO.
For work at an airport (or Terminal), the contractor must comply with all Airport Authority security and badging requirements. This includes specific access times, identification, and permitting. All associated costs must be included in the contractor’s estimate for inclusion in the specific task order.
The contractor will only be issued FAA Contractor PIV badges for full-time employees directly under the employment of the Contractor (Prime) unless otherwise directed by the CO. All costs associated with security background checks, fingerprinting, etc. are the responsibility of the contractor. Issuance of a PIV and access to an FAA facility or airport is at the sole discretion of the site-specific security authority. Denial of access to a facility or airport, or failure to pass security requirements must not be grounds for a claim.
4.2 Safe Work Practices to Control Asbestos and Lead Dust
Contractor must comply with FAA, OSHA and EPA requirements to provide a safe worksite free from exposure to asbestos and lead dust. This can be achieved by sampling material prior to construction to determine if asbestos or lead is present, or by assuming the material does contain asbestos and lead and then using engineering controls and safe work practices.
4.2.1 Sampling
Prior to construction, determine all building material that will be impacted by the project. Follow all state requirements to collect samples and have them tested to determine if they contain asbestos fibers or are coated in Lead Based Paint (LBP). If the materials contain asbestos and/or lead, follow FAA SOP O&M SOP-2, and/or FAA LBP SOP-4 to control dust. If the material does not contain asbestos or LBP, specialty work practices are not required.
4.2.2 Assume Material Contains Asbestos Fibers and LBP
If the materials contain asbestos and/or lead, follow FAA SOP O&M SOP-2, and/or FAA LBP SOP-4 to control dust.
5.0 ALLOWED CONFIGURATIONS
5.1 If service entrance is a disconnect switch
5.2 If service entrance is a switchboard or switchgear
5.3 For ELD system
| 1.0 INTRODUCTION |
| 1.1 Description of Work |
| Work performed under this SOW is for the replacement, modification, and/or installation of SPD and maintenance disconnect for the SPD. The contractor must provide all labor, tools, and materials to complete this effort. In the process of the replaceme... |
| 1.2 Facility Information |
| 2.0 SCOPE |
| The contractor must furnish the necessary personnel, equipment, materials, and other necessary resources to deliver services described in this SOW. All such items must be supplied in conformance with the terms and conditions of this SOW and contract d... |
| 2.1 Services to be Performed |
| 2.2 FAA approved equipment or equivalent |
| 2.3 Quality Acceptance Inspection (QAI) |
| Before Government acceptance of the facility and equipment, a QAI must be completed by the contractor and the FAA COR together at the site. The QAI checklist found in the attachment must be used unless the FAA Resident Engineer has submitted an altern... |
| 2.4 Pre and post construction submittals |
| a. Pre-construction submittals |
| Project safety plan, including FAA 3900-18, Work Release Request (WRR), and plan to control asbestos and lead dust |
| Proposed waterfall schedule |
| Proposed installation sketches by the facility |
| SPD specification by facility |
| Disconnect and fuse specification by the facility |
| Conductor specification sheet by the facility |
| Associated hardware, fasteners, conduit specification sheet by the facility |
| Grounding and bonding material specification sheet by the facility |
| b. Post construction submittals |
| Pre-energized test data by the facility |
| Finalized installation sketches by the facility |
| Both contractor and FAA jointly signed QAI document by the facility |
| 3.0 APPLICABLE DOCUMENTS |
| 3.1 Regulations, Specifications, Standards, and Publications |
| 3.2 FAA References |
| FAA-C-1217H CHG. 1 Electrical Work, Premises Wiring |
| FAA-C-1391E Installation, Termination, Splicing, and Transient/Surge Protection of Underground Electrical Distribution System Power Cables |
| Shielding Requirements for Facilities and Electronic Equipment |
| JO 3900.64 Air Traffic Organization Electrical Safety Program |
| JO 3900.57A CHG 1 Environmental and Occupational Safety and Health (EOSH) Requirements in the Planning and Execution of Construction and Maintenance Activities at National Airspace System (NAS) Facilities |
| NFPA 70 National Electrical Code |
| NFPA 70E Standard for Electrical Safety in the Workplace |
| FAA 3900-18 Pre-Construction/Installation Environmental and Occupational Safety and Health Checklist |
| FAA Asbestos O&M SOP-2 ATO SOP for Drilling into Asbestos Containing Building Materials with a Milwaukee Attachment |
| FAA LBP SOP-4 ATO SOP for Drilling into Materials Coated with Lead-based Paint using the Milwaukee Attachment |
| 3.3 Manufacturer Installation Instruction |
| The contractor must follow the installation instructions and guides published by the equipment manufacturer. |
| 4.0 OTHER REQUIREMENTS |
| 4.1 Security |
| Security will be addressed on a site-by-site basis. The contractor must comply with FAA security requirements as defined in this contract (Ref. Section I). This includes but is not limited to FAA facility access, contractor personnel security screenin... |
| For work at an airport (or Terminal), the contractor must comply with all Airport Authority security and badging requirements. This includes specific access times, identification, and permitting. All associated costs must be included in the contractor... |
| The contractor will only be issued FAA Contractor PIV badges for full-time employees directly under the employment of the Contractor (Prime) unless otherwise directed by the CO. All costs associated with security background checks, fingerprinting, etc... |
| 4.2 Safe Work Practices to Control Asbestos and Lead Dust |
| Contractor must comply with FAA, OSHA and EPA requirements to provide a safe worksite free from exposure to asbestos and lead dust. This can be achieved by sampling material prior to construction to determine if asbestos or lead is present, or by ass... |
| 4.2.1 Sampling |
| Prior to construction, determine all building material that will be impacted by the project. Follow all state requirements to collect samples and have them tested to determine if they contain asbestos fibers or are coated in Lead Based Paint (LBP). I... |
| 4.2.2 Assume Material Contains Asbestos Fibers and LBP |
| If the materials contain asbestos and/or lead, follow FAA SOP O&M SOP-2, and/or FAA LBP SOP-4 to control dust. |
| 5.0 ALLOWED CONFIGURATIONS |
| 5.1 If service entrance is a disconnect switch |