SOW MEP_SITE_ARCH_STRUTURAL details V2.docx
DOCX document 32 KB Posted
- Solicitation number
- 19TD55-26-R-0002
- Issued by
-
Department of State
About this file
This is a Statement of Work (SOW) for a comprehensive design/build renovation and security enhancement project of a U.S. Government-owned residential property located at 28 Ellerslie Park, St. Clair, Port-of-Spain, Trinidad. The project encompasses work on two existing structures: a two-story main residence and a separate pump room containing water storage tanks and equipment. The scope integrates architectural, structural, mechanical, electrical, plumbing (MEP), site works, and security upgrades into a single consolidated effort to ensure integrated design, accountability, and schedule control.
The major work categories include exterior improvements such as site and landscape work, tree removal, utility entrance modifications, parking area repaving, ABA-compliant accessible pathway construction, pool fencing installation, roof replacement for the pump room, driveway replacement, and exterior railing installation. Interior architectural work includes general renovations on both floors with kitchen enclosure, powder room upgrades to ABA standards, and flooring replacement. Utility systems upgrades encompass structural seismic reinforcement, HVAC system additions with corrosion protection, plumbing repairs and upgrades including a whole-house sediment backwash system and pool/spa equipment overhaul, complete electrical system renovation with new circuitry and grounding, and fire/life-safety improvements including an Ansul wet chemical suppression system for the kitchen. Security enhancements comprise a 9-foot high perimeter wall with anti-climb features around the property, a fully enclosed guard booth with electrical utilities and CCTV capability, perimeter pedestrian and driveway gates with access control systems, and 360-degree security lighting around the residence and all access points. All work must comply with applicable codes including the International Building Code (IBC), ABA Accessibility Standards, Swimming Pool and Spa Code, and OBO security standards, with specific reference to inspection reports and structural evaluation documents for deficiency lists and detailed design requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Document SF-330.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW PROJECT-SPECIFIC PROGRAM BRIEF ELEMENTS FOR MEP, SITE WORKS AND ARCHITECTURAL & STRUCTURAL Program Overview Statement This project encompasses design/build, permitting, renovation and improvement of the residence and its grounds at 28 Ellerslie Park, St. Clair, Port-of-Spain, Trinidad.
Program Elements The property has two (2) existing superstructures:
1. The House This is a two (2) story building with a first and second floor. This building is situated approximately within the center of the property.
2. Pump Room Structure contains water tanks and pumps.
Major Features of Work Major features of work encompass new work and improvements including:
(SEE ATTACHMENT J.3.3.1 AND STRUCTURAL EVALUATION DOCUMENT FOR FURTHER DRAWING DETAILS) (SEE THARUNA LIMITED INSPECTION REPORT FOR DEFICIENCY LIST AND REQUIRED REPAIR WORKS)
· Site and landscape work, removal of large trees near building footing and perimeter wall.
· Electrical, mechanical and plumbing.
· Structural modifications to accommodate seismic upgrades, accessibility and life safety requirements and improvement of tank/pump area and driveway/carpark.
Exterior Work
· Inspection, verification, and necessary improvements to utility entrance to residence (e.g. water, sewer, electrical, communications). Utility shutoffs to be relocated on the property.
· Repave parking area on property for required capacity.
· Remove all trees and large shrubs from the perimeter fence line and any trees located near the house that may impact security, structural integrity, or future construction. Stump grind and remove roots as necessary to prevent regrowth and damage to new or existing structures.
· Remove koi pond and pump. Backfill and landscape the area.
· Provide accessible pedestrian pathway from parking area to main entrance including new ramp meeting ABA (Architectural Barriers Act) Accessibility Standards- Section 405. https://www.access-board.gov/aba/#aba-405
· Design, supply, and install exterior pool fencing constructed of glass, meeting the International Swimming Pool and Spa Code (ISPSC) and OBO Supplement, to fully enclose the pool and jetted tub areas. Fencing must include self-closing, self-latching gates and meeting all safety, durability, and visibility requirements.
· Design and construct a new roof in the pump room, expanded as necessary to include additional storage tanks and to keep all tanks serviceable. The design must ensure weather protection, adequate ventilation, and safe, convenient access for maintenance and servicing of all tanks and equipment.
· Remove and replace driveway for improved access, durability, and compliance. Expand concrete paved area for additional parking.
· Modify the exterior washroom at rear to be ABA compliant, including accessible fixtures, clearances, door hardware, and signage per ABA standards.
· Design, fabricate, and install exterior railings for safety compliance on the rear stairwell, and prohibit unauthorized roof access. Railings must meet OBO, IBC, and local code requirements for height, strength, and anti-climb features.
· Inspect roofing sheets and gutter systems, repair/clean as required.
· Repair cracks on exterior building walls and fence and repaint entire building.
· Final landscaping and site restoration after all major works.
Interior Architectural Work All works and finishes to be conducted in accordance with requirements in J.3.1.3 Interior Finishes.
· General interior renovations on both floors, including repairs to plumbing, ceilings, walls, and finishes.
· First Floor Level
· Install new infill partition and doors at kitchen to fully enclose the kitchen area.
· Renovate existing powder room to meet ABA requirements.
· Replace engineered wood flooring with tile on the ground level.
· Second Floor Level
· Level and replace subfloor and flooring.
· Modify and upgrade all railing systems to meet Embassy and code requirements.
Utility Systems or Systems Upgrades
· Make repairs listed in “BUILDING INSPECTION REPORT” by Tharuna Limited.
New work and adjustments, rebalancing, and commissioning of all the following systems:
· Perform upgrades as necessary utilizing OBO residential safety attachment, “Residential Safety Checklist V8 May 2025”.
· Structural (Reference J.3.1.3)
· Provide all necessary structural modifications to accommodate seismic upgrades, accessibility, and life safety requirements.
· Seismic reinforcement of the exterior structure and block infill on the patio.
· Mechanical
· Additional HVAC systems will be required on the first-floor corridor. Systems must be capable of operating in cooling and dehumidification mode. All new/replacement HVAC equipment to be provided with enhanced corrosion protection features. Include new electrical power infrastructure.
· Provide exhaust fans in all bathrooms. Include new electrical power infrastructure.
· Plumbing
· In addition to the plumbing repairs listed in survey report by Tharuna Limited, flush, clean and disinfect the hot/cold domestic water distribution piping with appropriate treatment means, suitable for the material of the existing water distribution system.
· Install whole house sediment backwash system.
· The main water storage tank is to be protected from the elements, sunlight and elevated ambient temperatures.
· The swimming pool and hot tub systems need to be surveyed and evaluated for code compliance using the Swimming Pool and Spa code. Overhaul and repair all pool and hot tub equipment, including controls, pumps, and filtration.
· Install sewer access cover in driveway to allow for routine cleaning of existing transition box approximately 5’ deep (marked with “X” on site). Incorporate design in driveway improvement project.
· Modify ground floor sewer piping to allow for proper flow from exterior washroom and interior maid’s quarters washroom.
· Electrical
· Complete electrical renovation – Based on the survey report by Tharuna Limited, the entire electrical system is old without any labels and schedules, missing GFCI receptacles, dated light fixtures and switches, overloaded panelboards.
· New circuitry to support new room layouts and equipment.
· Inspect and install proper grounding system. Install separate earthing and neutral bus. Add independent ground rod to new earthing bus for main electrical distribution panel.
· Inspect generator and controls for proper operation. On a non-running three phase or single-phase generator, use an ohmmeter to verify that no short circuit (low to zero ohms) exists between generator enclosure/frame/ground rod/connecting metal conduit/junction boxes and any phase conductor and all its interconnecting wiring to the building loads. For generators with a 3-pole Automatic Transfer Switch (ATS), there should be no bond between ground and neutral. The neutral-to-ground bond must be removed at the generator.
· Power quality study – to determine if an Automatic Voltage Regulator (AVR) is required or upgrade of electrical system capacity.
· Replace all deteriorated electrical light fixtures – Indoor and outdoor lightings.
· Provide all required electrical utilities and connections for the new guard booth, including power, lighting, communications, security system connections, and climate control.
Fire/Life-Safety
· Specialty fire extinguishing in commercial kitchen. Ansul wet chemical fire suppression system to be installed in the kitchen.
Security
1. Perimeter Wall- Design and construct a 9 ft high perimeter wall throughout the property, measured from the attack side, to considerably deter unauthorized access. Wall design to include anti-climb features such as spike strips or metal tubing as required by OBO security standards.
a. South (Front) Wall raised to 9 ft.
b. East side wall of property will have a combination of anti-climb fence and sheet metal to create a significant barrier
c. West wall will be flush with front wall up to the guard shack. The remainder of the wall will have metal tubing.
d. No additional requirements for the rear wall.
e. Add spike strips to south, east, and west walls.
2. Guard Booth- Design and construct a fully enclosed guard booth at the driveway entrance, designed to meet OBO security standards. The booth shall include all associated electrical utilities (power, lighting, communications, security system connections, and climate control as required).
a. Guard Booth will be located in the southwest corner of property near the vehicle gate, but north enough to clear the electrical pole and to not have the swing gate interfere with viewing panel of the booth.
b. Guard booth will be approximately 9’x 8’ and share a wall with the western wall.
c. Guard booth will need electrical power for an AC unit and a CCTV monitor.
d. A sliding glass window will face east and a door will face north.
3. Perimeter gates- Design and construct a perimeter pedestrian gate and a driveway gate, both to match the height of the perimeter wall and include anti-climb features. Pedestrian gate to include keypad access control, video/audio identification system, and an additional means of egress other than a key. Driveway gate to be equipped for remote opening or manual operation by on-site security, and both gates to be designed for substantial security and durability. Provide all construction details, hardware, and finishes.
a. Vehicle and pedestrian gate will be same height as front wall and have spike strips.
b. Vehicle gate will also have spike strips.
c. Vehicle and pedestrian gate will have sheet metal style louvres to prevent climbing and create privacy.
d. Pedestrian gate will have a keyed entrance and thumb turn exit or push button exit.
e. Pedestrian gate will have a programable keypad entrance.
f. Pedestrian gate will have a camera to view guests outside the gate.
4. Perimeter lights- Design and install security lighting to provide 360-degree visibility at night around the house, including all residential compound entrances, exits, facades, and adjacent areas, as well as at all pedestrian and vehicle perimeter access points and common ground areas.
a. Proper illumination must be maintained at pedestrian and vehicle perimeter access points, common ground areas, building entrances, and areas adjacent to building facades. Residential compound entrances and exits and facades must be illuminated. Residence should have security lighting that provides 360 visibilities at night around the house.
File details come from the government source that posted it. Updated .