This Services Statement of Work (SOW) details the installation of Maritime Approaches Surveillance Towers (MAST) equipment at the OP-1 facility in Vieques, Puerto Rico for the NAS Defense Programs (NDP) and Department of Homeland Security (DHS). The scope of work includes installing a Furuno FAR 2228 radar at 100 feet and a Pelco Esprit camera at 60 feet on an existing tower, along with associated cabling, ground plates, and electrical work. The installation requires a licensed electrician, must conform to the National Electrical Code, and will be performed within 45 days of the award date at the NAVFAC Former Atlantic Fleet Weapons Training Area. Government-furnished equipment includes the Furuno radar antenna (49.3 kg, 102.2 inches wide) and the Pelco Esprit camera. All contracted personnel must provide REAL-ID compliant identification for site access.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SERVICES STATEMENT OF WORK

For

Installation Service for MAST Tower Equipment at OP-1 Site, Vieques, Puerto Rico for the NDP MAST Program

1. Background and Overview

This service statement of work will help in the installation of tower equipment associated with the Maritime Approaches Surveillance Towers (MAST) system to meet the mission requirements of the NAS Defense Programs (NDP) and Department of Homeland Security (DHS). MAST provides primary and supplemental coverage for the existing surveillance systems infrastructures in Puerto Rico, and U.S.

Virgin Islands.

2. Purpose

The NDP seeks to procure installation services to include materials at Vieques, Puerto Rico OP-1 facility where MAST System is to be implemented.

3. Scope of work

Service Provider will provide the following:

Installation of (1) Furuno FAR 2228 radar (GFE) at the mounting plate on top of existing tower at 100ft above ground level (AGL). Mounting plate has holes (4) for the installation.

Installation of two Furuno main control cables (GFE) from radar along the tower cable tray and transition to equipment shelter. Cable run is approx. 180ft.

Provide and Install tower mount for camera base to suit Pelco Esprit Camera at 60ft

AGL

Installation of (1) Pelco Esprit camera (GFE) at camera tower mount mentioned above.

Provide and install one #12 AWG 3-wire 120VAC outdoor wiring cable from camera along the tower cable tray to equipment shelter (120ft approx.).

Provide and install one CAT-5e shielded outdoor ethernet Data cable from camera along the tower cable tray to equipment shelter (120ft approx.) and terminate with proper RJ-45 connectors on each end.

Provide necessary hardware and materials and install ground plate at top of the tower and #6 ground cable conductor from Radar at top of tower to ground level. Interconnect ground with existing ground plate at the bottom of the tower.

• Material must be 100% Copper, Aluminum or Stainless Steel

• Ground plates must be 100% Copper

• Bonding connections to ground plates & boxes must be crimped with 12 Tons of pressure.

• Terminals bolted to ground plates must be double slotted.

Enlarge existing lighting protection terminal and base to avoid interference of the air terminal with the radar. This must extend at least 9 ft from tower center.

4. Location of Work

All work related to this statement of work will be performed at the ICE Tower at OP-1 Facility, inside the NAVFAC Former Atlantic Fleet Weapons Training Area, Vieques P.R.

Coordinates:

Latitude: 18° 7'50.22"N

Longitude: 65°19'1.88"W

5. Period of Performance

Execution of the requirements identified in this Statement of Work shall be completed within 45 days of the award date.

6. Deliverables Schedule & Meetings

Contractor will coordinate with the Contract Specialist and COR local for installation times and availability of escort. Availability times are expected to be from 8am-4pm local time unless other times are agreed upon by on-site staff and the contractor.

7. Applicable Standards

All electrical work must conform strictly to the latest adopted addition of the National Electrical Code (NFPA 70). All electrical work must be completed by a licensed and certified electrician.

8. Acceptance Criteria

Upon installation of equipment and services established in this statement of work, Service Provider shall inform NDP that work is completed. NDP will perform a Contractor’s work Acceptance Inspection (CAI) to evaluate and accept work performed.

9. Special Requirements

All Contracted personnel visiting the Location of Work must provide a REAL-ID compliant identification or an alternative form of acceptable identification. See Attachments.

Government Furnished Equipment at Tower:

1. Furuno Radar Antenna

a. Weight: 49.3Kg (108.7 Lbs)

b. Width: 102.2 Inches

2. Pelco Esprit Camera.

Existing Tower and Shelter: