SOW Manlifts 49 Busl.doc
DOC document 61 KB Posted
- Attached to
- EQUIPMENT RENTAL- 40' ELECTRIC MANLIFT
- Solicitation number
- 70Z04024Q60518Y00
About this file
This solicitation seeks rental of two electric 40-foot manlifts for a five-month period between February 2029 and September 2024 at the U.S. Coast Guard Yard in Baltimore, Maryland. Quotes are due by February 22, 2024 and must be submitted to Erica Gibbs via email with the subject line including the solicitation number. The award will be made to the lowest priced technically acceptable offer based on meeting the requirements in the statement of work to provide two JLG E400AJPN electric manlifts or equal. The rental cost must include delivery and pickup. An option is also requested to extend the rental period on a weekly basis following the initial term.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR CLAUSES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK P/R: 2124404Y61B4499002
POC: Paint Shop Foreman Donnie Legg Cell: (410) 636-3166 Email: b.legg@uscg.mil
Ship Superintendent LTJG Lauren Silva Cell: (410) 636-7703 Email: lauren.d.silva@uscg.mil
Location: USCG Yard, 2401 Hawkins Point Rd, Baltimore, MD 21226
1. GENERAL REQUIREMENTS: The work consists of providing equipment as required iaw the description below. Located at 2401 Hawkins Point Road Baltimore MD 21226 49’ Busl.
1.1 Government intended use is for blasting exterior surfaces of Coast Guard 49-foot vessel while in an enclosed tent. The work will include blasting operations of the entire exterior surfaces of the vessel. Any normal damages cause by the above work task will be at no cost to the Government. Rental will be on a firm fixed price regardless of the hours used. Any damage found outside normal ware and tear must be presented to Contracting Officer for approval prior to repair work being completed.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall provide the equipment for 5 consecutive months sometime between 02/29/24 and 09/01/24. Final period of performance will be determined by the Yard POC / Ship Superintendent.
3. Description of Equipment: Description: 2 each JLG Articulating Boom Lift E400AJPN or equal. Lifts must be manufactured within the 5 years of contract award date. An inspection report finding the equipment to be in good working order must be completed prior to delivery & forwarded to the Contracting Officer.
· Articulating Boom Lift – Platform Height 40ft, Machine Width 4FT 11IN, Wheel 6FT 7IN, Ground Clearance 5IN, Machine Height 6FT 6IN, Platform Capacity 500lb, 48 Volt Electric Operation, Drive Speen 3 mph, 2WD, Swing 360 Degrees, Swing Type Non-Continuous, Outside Turning Radius 10FT 4IN, JIB Rang of Articulation 144 Degrees If at any time the equipment is deemed non-functioning, Contractor has 24 hours to either replace or have equipment up and functioning. Contractor must be available 7 days a week for repairs or replacement.
4. Delivery: Equipment must be delivered to the USCG Yard 2401 Hawkins Point Road Baltimore Maryland 21226. 49-foot Project (Bigtop Tent) location between 7:00am and 9:00am. Access to the Yard during the rental period is coordinated through the Yard POC. All personnel shall receive visitor’s passes and clearance from USCG Coast Guard Yard Security located at the Main Gate. List of personnel requiring access shall be provided to the Yard POC twenty-four (24) hours prior to requiring access. Personnel will be required to provide full name, picture I.D. (valid driver’s license preferred), and date of birth. For Non-US citizen’s, a passport will be required. The following forms of IDS are authorized: CAC, Foreign Passport containing appropriate visas, TWIC, Green Cards, US Passport, or MOST state IDs.
5. Pick Up: Request automatic pick up after 5 months unless optional months are authorized by Contracting Officer. Only the Contracting Officer may modify the contract. A contract modification must be executed prior to an extension occurring.
6. Schedule Period: 5 consecutive months sometime between 2/29/24 & 09/01/24. Final period of performance will be determined by the Yard POC / Shop Superintendent.
7. Damage to Government Property: The Contractor shall be held liable for any damage to government property caused by the Contractor. Any concerns must be brought to the attention of the POC.
6. Definitions and Acronyms: NA
8. CONTRACT DEFINITIONS:
1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
3. Safety Standards: Contractors must follow applicable OSHA guidelines.
9. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modifies or otherwise affect the terms of this contract.
File details come from the government source that posted it. Updated .