This document is a draft Statement of Work (SOW) for lube oil and coolant testing and analysis services required by the United States Coast Guard (USCG). The USCG requires testing, analysis, data management, and technical support services for new and used lube oil and coolant samples from USCG vessels.

The SOW specifies the scope of work, testing requirements, personnel qualifications, quality control, reporting, and other contract terms. It defines the specific test slates, methods, and equipment to be used for analyzing oil and coolant samples. The Contractor must provide an ISO 17025 certified laboratory located in the continental U.S. capable of processing up to 100 samples per day. The contract includes a one-year base period with four one-year option periods. The SOW is accompanied by a separate Request for Information (RFI) seeking market research on industry capabilities to perform these requirements.

View the file

Other files

File Type Posted
LO Coolant Testing Contract Questionnaire FY25 RFI.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR #:

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

FOR

Lube Oil and Coolant Testing and Analysis

1.0 GENERAL

1.1 BACKGROUND

The United States Coast Guard relies on analysis of lube oil and coolant of assets’ major equipment in order to monitor lubricant/coolant condition, and to maintain awareness of developing or impending component problems that may be detected early by analysis of fluids. Additionally, fluid testing and analysis plays a key role in ongoing efforts to increase utilization of Conditions Based Maintenance programs.

1.1.1 GLOSSARY OF TERMS USED IN THE STATEMENT OF WORK

The following definitions apply to the terms used in this statement of work:

· CLS: Certified Lubricant Specialist

· CONUS: Continental United States

· DR: Direct Reading

· USCG: United States Coast Guard

· OEM: Original Equipment Manufacturer

· STLE: Society of Triboligists and Lubrication Engineers

1.1.2 STANDARDS USED IN THE STATEMENT OF WORK

The following standards apply to this statement of work:

ASTM: American Society of Testing and Materials - ASTM D-288 shall be used for standard definitions of terms relating to petroleum and standards for testing new and used lubricants.

ISO: International Standards Organization - Standard 3448 shall be used to define oil viscosity grades. ISO 17025 - General requirements for the competence of testing and calibration laboratories is the main ISO standard used by testing and calibration laboratories.

API: American Petroleum Institute - API standards shall be used for measuring oil characteristics, including API gravity.

NAS: National Aeronautical Standards - NAS standards shall be used for cleanliness of hydraulic fluids used in commercial and military aircraft.

1.2 SCOPE

The United States Coast Guard (USCG) requires testing of lube oil samples, coolant samples, storage of samples, data analysis and quality assurance of test results, related data management, and supply and shipping of sample bottle kits. The Contractor shall also provide technical service capabilities for use and access of online database, trend analysis and reports distribution, and expert consultation to include training. The Contractor shall be responsible for all new and used lube oil and coolant testing and wear debris analysis for United States Coast Guard vessels during the term of this Contract.

1.3 APPLICABLE DOCUMENTS

1.3.1 COMPLIANCE DOCUMENTS

The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:

· ISO/IEC 17025:2005 or later: General requirements for the competence of testing and calibration laboratories.

· It is acceptable and preferred if the laboratory is also certified to ISO-9001:2000 or later, in addition to the ISO/IEC 17025 requirement.

1.3.2 REFERENCE DOCUMENTS

The following documents may be helpful to the Contractor in performing the work described in this document:

· ASTM D445

· ASTM D6304

· ASTM D2896

· ASTM D4739

· ASTM D664

· ASTM D7593

· ASTM D5181

· ASTM D6595

· ASTM D3321

· ASTM D1287

· ASTM D1125

· ASTM D5827

· ASTM D6130

2.0 TESTING OF LUBE OIL AND COOLANT SAMPLES

2.1 GENERAL

The Contractor shall perform testing, analysis, and data review of new and used oil and coolant samples provided by the Government. The Contractor shall provide complete, accurate, and timely results. The Contractor shall ensure that test result data is verified to be accurate using analytical techniques or current industry methods.

2.1.1 CAPACITY

The Contractor shall have the capacity to process a maximum of 100 samples per day under this Contract. The normal volume of samples is estimated to be 40 samples per day.

2.1.2 TEST SLATES

The Contractor shall perform tests of physical properties and spectrochemical analysis for each sample received as defined in Attachment A. Each different type of oil and coolant shall undergo a predetermined slate of tests, specified in Attachment A. Analytical Ferrography tests shall be conducted on oil samples with results exceeding specific limits in Direct Reading (DR) ferrography, ISO 4406 Wear Particle Count, or wear metals.

2.1.3 BARCODED SAMPLE LABELS

The Contractor's laboratories shall be capable of providing printed barcoded sample labels through its web based reporting system for easy tracking and error free data entry of samples.

2.1.4 SAMPLE BOTTLE KITS, MAILERS AND SHIPPING COST

The Contractor shall provide 3 oz (90 ml) or 4 oz (120 ml) sample bottle kits with a shipping container to hold a minimum of 10 sample bottles. Each sample bottle shall be constructed of clear plastic and shall not collapse when subjected to a minimum of four (4) inches Hg vacuum. Each sample bottle shall be double wrapped (container within a container with absorbent material). The Contractor shall provide 1 shipping box, 2 shipping containers to hold 5 bottles each, two (2) prepaid, preaddressed commercial express mailer and 10 sample labels in each lube oil sample bottle kit for shipment of samples from the vessel to its testing facility. Shipping cost shall be prepaid and included in total price of sample kits.

2.2 SHIPPING, TESTING, DATA TRANSFER, AND RETENTION:

2.2.1 SHIPPING

The Government will send lube oil and coolant samples via courier service using the contractor’s provided shipping labels to the Contractor’s laboratories. The Contractor shall maintain a log documenting date and time of receipt of samples and assign a sequential number to each sample received.

2.2.2 TESTING

The Contractor shall test each sample, which will contain a min of 90 ml of oil or coolant, in accordance with the specific test slates identified on the sample label information. The Contractor shall not process unregistered samples (e.g. unlabeled or unidentified samples). The Contractor shall contact USCG SFLC-ESD for disposition instructions for the unregistered samples. The Contractor shall perform testing as specified by the equipment registration number provided by the Government. The Contractor shall complete processing of all samples received at the Contractor’s facility each day within two (2) business days of receipt (excluding weekend and federal holidays). Completion of processing of samples is defined as to occur when the Government has received the test results electronically. The Contractor shall perform expedited testing as requested by the Government at no additional cost.

2.2.2.1 TEST SLATES

Each test slate consists of a set of tests. Attachment (A) specifies the tests required for each Test Slate, the requirements related to each individual test, and the unit of measurement, where applicable for specific tests.

2.2.2.2 ANALYTICAL FERROGRAPHY

Analytical Ferrography tests will be performed automatically when test slates for DR Ferrography and Particle Count test results exceed threshold or as requested by the Government. The requirements of Analytical Ferrography are specified in Attachment (A).

2.2.2.3 TREND ANALYSIS

The Contractor shall employ analysis techniques using Government furnished threshold limits, trend analysis, or OEM threshold limits to determine oil sample condition (normal, caution, abnormal, or severe). Color coding of sample condition as follows: NORMAL – GREEN, CAUTION – YELLOW, ABNORMAL – MAGENTA and SEVERE – RED. Recommendations as a result of trend analysis are required. The analysis shall be provided at no additional cost to the Government.

2.2.2.4 SAMPLE RETENTION

The Contractor shall retain samples forty-five (45) days after test date for potential retesting requirements. After forty-five (45) days, the Contractor shall dispose of samples.

2.2.2.5 RETEST

The Government may order retesting of specific samples. Government requested rechecks shall be conducted within two (2) business days of request. The Contractor shall not be entitled to payment for retests in the event original test results are found to be incorrect. The Contractor shall be entitled to payment for the tests performed in the event original tests are confirmed to be correct.

2.2.2.6 SPECIAL SAMPLE ANALYSIS

The Government may order special testing outside of the requirements of section 2.2.2. The exact nature, scope of effort, and time required cannot be anticipated prior to discovery and identification of the special need. In such cases, the Government will describe the analysis to be performed, the required time to respond, and request a quote from the Contractor. Contractor will respond with a quote including expected time to respond and the Government will provide positive approval once agreement has been achieved. Any deviations from the rest of this contract shall be noted in the quote.

2.2.3 NOTIFICATION OF COMPLETED TEST RESULTS

The Contractor shall provide daily notification of completed test results to a designated USCG personnel via email. The test results shall be provided in an automated summary report that contain the below information:

Sample Id (Fluid Category)

Cond.
Submitted by
Unit ID
Component

Description Type Date Taken Tested

Recommendation
Problem Code

This shall confirm completed sample results are ready for distribution for USCG users through the contractor’s online database. A Laboratory Data Analyst shall review all oil and coolant test data for completeness and accuracy prior to submission to USCG. The Laboratory Data Analyst shall provide remarks to indicate the test results have been reviewed and verified in the Lab Comment data field.

2.2.4 ONLINE DATABASE

During the period of the contract, the Contractor shall provide an online database for the Government to utilize for its data reporting and management needs. Database must allow for 7-digit equipment ID numbers for all registered equipment. The Contractor shall maintain all lube oil and coolant sample test results in its online database that will have the capability for USCG personnel to access, provide comments and recommendations, distribute summary reports via email to shipboard and shore side personnel, print reports, and download and export data. The Contractor shall also provide database access to each cutter participating in the program and designated shore side personnel to view, download, print reports and export data. The online database shall be accessible via the internet through a secured website with user name and password account information for every cutter in the USCG Oil Analysis Program and cognizance USCG personnel. Access to database shall require passwords that are permanent for the life of the contract and do not require periodic password changes. Database shall have a dashboard that provide summary of condition, problem equipment and turn-around time. It shall also have the capability for searching samples, maintaining equipment information, performing diagnosis and creating management reports. The database shall maintain all test results as received from the Contractor’s laboratories for the life of the contract.

2.2.5 OTHER TECHNICAL SERVICE CAPABILITIES

The Contractor shall provide technical capabilities for trending analysis and expertise consultation as required by the USCG. The Contractor shall be capable in distribution of trend and summary reports to USCG assets, provide expertise advice in oil, coolant, wear analysis, and provide technical literature or online webinar training to USCG personnel on fluid sampling and testing techniques when requested by the government.

3.0 CONTRACTOR PERSONNEL

3.1 QUALIFIED PERSONNEL

The Contractor shall provide a Program Manager as key person who upon commencement of performance and throughout the contract period shall meet the minimum qualifications set forth below in section 3.3.1. Resume and certification for person in this position shall be submitted in the proposal.

The Contractor shall provide Laboratory Data Analysts set forth in section 3.3.2. Resumes and certifications for personnel in these positions shall be submitted in the proposal.

3.2 CONTINUITY OF SUPPORT

The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor must provide a fully qualified replacement.

3.2.1 SUBSTITUTION OF PERSONNEL

Key personnel may not be replaced under the contract without express approval of the Contracting Officer.

Other personnel fulfilling technical roles substituted by the Contractor shall meet the minimum personnel qualifications described in Paragraph 4.2 and resumes shall be submitted ten (10) days in advance of substitution and subject to USCG approval.

3.3 KEY PERSONNEL

3.3.1 PROGRAM MANAGER

The Program Manager shall be the single point of contact for all matters pertaining to the performance of the contract. The Program Manager is expected to be available during working hours. USCG expects that this contract will be the Program Manager’s primary, but not necessarily sole duty. All recommendations for substitution of personnel as defined by the contract shall originate from the Program Manager.

The Program Manager shall have a minimum of either a Bachelor of Science or Bachelor of Arts degree, minimum of five (5) years experience in managing an oil analysis program or testing facility, and a Certified Lubricant Specialist (CLS) certified by STLE or MLA by ICML. The Program Manager must also be an employee of the laboratory to be utilized during performance of the contract.

3.3.2 LABORATORY DATA ANALYSTS

3.3.2.1 SENIOR LABORATORY DATA ANALYST

The Senior Laboratory Data Analyst shall have a minimum of five (5) years experience in a testing laboratory facility and certification as a Certified Lubricant Specialist (CLS) certified by STLE or MLA by ICML.

3.3.2.2 LABORATORY DATA ANALYST

The Laboratory Data Analysts shall have a minimum of two (2) years experience in a testing laboratory facility.

3.3.3 ROSTER OF PERSONNEL

The Contractor shall submit a list of all personnel, including designated key personnel, who are points of contact for this contract. The listing shall include phone numbers, email addresses, and mailing addresses. If changes in personnel or offices are made, an updated list shall be submitted.

4.0 OTHER APPLICABLE CONDITIONS

4.1 LICENSES, PERMITS, AND PRECAUTIONS

The Contractor shall, at Contractor expense, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable laws, codes, and regulations, in connection with the performance of work. The Contractor shall comply with all federal, state and local regulations for the proper handling and disposal of hazardous materials. Further, the Contractor is responsible to ensure that proper safety and health precautions are taken to protect the work, workers, public, and property of others.

4.2 PERIOD OF PERFORMANCE

The period of performance for this contract is a one-year base period with four one-year option periods as follows:

Base PeriodSeptember 17, 2024 through September 16, 2025
Option Period OneSeptember 17, 2025 through September 16, 2026
Option Period TwoSeptember 17, 2026 through September 16, 2027
Option Period ThreeSeptember 17, 2027 through September 16, 2028
Option Period FourSeptember 17, 2028 through September 16, 2029

4.3 PLACE OF PERFORMANCE

The primary place of performance will be the Contractor’s facilities. The Contractor shall provide at least one ISO 17025 certified laboratory located in the Continental United States (CONUS), capable of testing and analyzing a minimum of 8,000 lube oil and coolant samples per year and storing a minimum of 1,500 lube oil samples for a period of forty-five (45) days before disposal. The Contractor’s laboratories shall be located within the Continental United States (CONUS).

The Contractor laboratories shall be, at a minimum, accredited as an ISO-17025 for at least three years.

4.4 EQUIPMENT

The Contractor facilities shall have the specific equipment to run ASTM/ISO tests as specified by the seven (7) different test slates, a Supplemental Analytical test and consumables [Attachment (A)]. At a minimum, the Contractor’s laboratories shall have the following test equipment:

· Inductive Couple Plasma Arc (ICP) or Roto-disk Electrode (RDE) Spectroscopy

· Direct Reading (DR) Ferrography and Analytical Ferrography equipment

· Automatic particle counter

· Gas Chromatograph (GC)

· Fourier Transform Infrared Spectroscopy (FTIR) equipment

· Soot meter

· Karl Fischer titration equipment

· Automated titration equipment to conduct Total Base Number (TBN) and Total Acid Number (TAN) tests in accordance with ASTM tests mandated in Attachment (A).

· Industry approved laboratory Viscometer

4.5 QUALITY CONTROL & PROFICIENCY

4.5.1 QUALITY CONTROL PLAN

The Contractor shall have a Quality Control Plan to maintain the quality standards for all services. The Quality Control Plan shall be implemented upon contract award. The Contractor is responsible for conforming to its Quality Control Plan and processes to ensure proper performance and correct any deficiencies that may occur. The Quality Control Plan shall be implemented upon contract award.

4.5.2 PARTICIPATION IN ASTM PROFICIENCY TESTING PROGRAM

The Contractor shall be a current participant of the ASTM Proficiency Testing Program. The Contractor shall provide a copy each of the PTP report for oil and coolant testing in the last year.

4.5 TRAVEL

Contractor travel must not be required for this requirement.

4.6 POST AWARD CONFERENCE

The Contractor must attend a Post Award Conference with the Contracting Officer and the COR no later than 15 business days after the date of award. The purpose of the Post Award Conference, which will be chaired by the Contracting Officer, is to discuss technical and contracting objectives of this contract and review the Contractor's draft project plan. The Post Award Conference will be held via online virtual meeting or teleconference.

4.7 PROJECT PLAN

The Contractor must provide a draft Project Plan at the Post Award Conference for Government review and comment. The plan, at a minimum, must include: (a) list of work to be performed;(b) project schedule; (c) description of intended results; (d) role of key personnel, if applicable and (e) how quality of service (project) will be maintained throughout life of contract. The Contractor must provide a final Project Plan to the COR not later than 10 business days after the Post Award Conference.

4.9 PROGRESS REPORTS

The Project Manager must provide a quarterly progress report to the Contracting Officer and COR via electronic mail. This report must include a summary of all Contractor work performed, including all direct costs by line item, an assessment of technical progress, schedule status, any travel conducted and any Contractor concerns or recommendations for the previous reporting period.

4.10 PROGRESS MEETINGS

The Program Manager must be responsible for keeping the COR informed about Contractor progress throughout the performance period of this contract, and ensure Contractor activities are aligned with DHS objectives. At a minimum, the Project Manager must review the status and results of Contractor performance with the COR on an annual basis via teleconference or virtual meeting e.g. Microsoft Teams.

4.11 MONTHLY REPORTS

The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications). Reports are not separately priced and the data and format for reports are defined in section 4.11.1.

4.11.1 LUBE OIL SAMPLE MONTHLY REPORTS

The Contractor shall submit a Lube Oil and Coolant Sample Monthly report with details of all sample analysis activity for the previous month. The report will include a summary sheet indicating the total number of samples by ship and the number of alerted and non-alerted samples per ship during the monthly reporting period. The report will also include the following information:

a. Total number of samples in the month

b. Number of samples by test slate per month

c. Total number of unregistered (e.g., unidentified, unlabeled samples) samples received from USCG vessels, by vessel, if known.

d. Total number of rechecks, by test method, requested by USCG, broken out by Rechecks-Correct and Rechecks-Error.

e. Total number of samples that are not processed within the 48-hour turnaround requirement.

f. Number of Sample Bottle Kits supplied per vessel

4.12 PERFORMANCE STANDARDS

The Contractor's performance will be continually assessed to ensure that the performance objectives are being met during the life of the contract. The Government reserves the right to conduct a periodic inspection of the Contractor's facilities. Such inspections shall be conducted by the Contracting Officer’s Representative (COR) or his designated representative.

4.12.1 PERFORMANCE OBJECTIVES AND STANDARDS

The performance objectives to be assessed under this contract are quality and timeliness of test results. The COR shall be responsible for surveillance.

4.12.1.1 QUALITY OF TEST RESULTS AND EQUIPMENT

The Contractor shall provide complete and accurate test results. The performance standards for quality of test results are specified below:

Performance Standard
Method of Assessment
Performance
100% of tests per month complete and free of errors
Lube Oil Sample Monthly Report
Samples with errors redone at no cost to the Government

4.12.1.2 TIMELINESS OF TEST RESULTS

The Contractor shall provide timely results. The performance standard for timeliness of test results is specified below:

Performance Standard
Method of Assessment
Performance
100% of tests are completed within two (2) business days, retest and ferrography will add two (2) business days
Lube Oil Sample Monthly Report
Samples not submitted within turnaround time subject to possible non payment

4.13 PROTECTION OF INFORMATION

Contractor access to proprietary information is required under this SOW. Contractor employees must safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation.

5.0 GOVERNMENT FURNISHED RESOURCES

The Government will not furnish any resources to the Contractor in support of this contract.

6.0 CONTRACTOR FURNISHED PROPERTY

The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract.

7.0 GOVERNMENT ACCEPTANCE PERIOD

The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

7.2 The COR will have thirty (30) business days to review deliverables and make comments. The Contractor must have three (3) business days to make corrections and redeliver.

7.3 All other review times and schedules for deliverables must be agreed upon by the parties based on the final approved Project Plan. The Contractor must be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor must work with personnel reviewing the deliverables to assure that the established schedule is maintained.

8.0 TECHNOLOGY IMPROVEMENTS

After contract award, the Government may solicit, and the Contractor is encouraged to propose independently, technology improvements to the equipment, products, software specifications or other items required for the performance under this contract. These improvements may be proposed to save money, to improve performance, to save energy or for any other purpose which presents a technological advantage to the Government. The Government is under no obligation to accept technology improvements. Pending approval of such improvements, the Contractor remains obligated to provide the supplies and services required under this contract.

8.1 SUBMITTAL OF TECHNOLOGY IMPROVEMENT PROPOSALS

The Contractor will submit a proposal that includes pricing to the Contracting Officer for evaluation. The price proposal shall reflect the same pricing strategy for the new item as was implemented under this contract for the item being replaced. The proposals will at a minimum contain the following information: 1) a description of the difference between the existing contract requirement and the proposed change with the comparative advantages and disadvantages of each; 2) itemized requirements of the contract which must be changed if the proposal is adopted with the proposed revisions to the contract language; 3) an estimate of the changes in performance or cost, if any, that will result from the change; 4) an evaluation of the effects the proposed change would have on collateral costs to the Government, such as Government furnished property costs, costs of ship equipment maintenance, operation and conversion costs; 5) a statement of the time by which a contract modification must be issued so as to obtain the maximum benefits of the changes for the remainder of this contract including supporting rationale; and 6) any effect on contract time and delivery schedules shall be identified.

8.2 IMPLEMENTATION OF TECHNOLOGY IMPROVEMENT PROPOSALS

Those proposed technology improvements that are acceptable to the Government would be processed as contract modifications.

9.0 DELIVERABLES

The Contractor must consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the COR prior to proceeding to next deliverable or event in this SOW.

ITEM
SOW REFERENCE
DELIVERABLE / EVENT
DUE BY

DISTRIBUTION

1
4.6
Post Award Conference
Xxxxx

N/A

2
4.6, 4.7
Draft Contractor Project Plan
Xxxxx

COR, Contracting Officer

3
4.7
Final Contractor Project Plan
Xxxxx
COR, Contracting Officer
6
4.9
Progress Reports
Xxxxx
COR, Contracting Officer

10.0 LIST OF ATTACHMENTS

ATTACHMENT (A): Test Slates and Specifications

ATTACHMENT (B): Contractor’s Test Equipment and Capacity

ATTACHMENT (A): TEST SLATES AND SPECIFICATIONS

I. Test Slates by Oil Type: The routine test slates for each type of oil samples are defined in the table below. The Contractor shall perform these tests by using the test methods outlined in Paragraphs II through V below.

Test Slate 1
Viscosity, Water, Total Base Number (TBN), Spectrochemical Analysis, Fuel Dilution, Oxidation, Soot Index, Direct Reading Ferrography

Test Slate 2

Viscosity, Water, Spectrochemical Analysis, Total Acid Number (TAN), Particle Count

Test Slate 3
Viscosity, Water, Spectrochemical Analysis, TAN
Test Slate 4
Viscosity, Water, Spectrochemical Analysis, TAN, Direct Reading Ferrography
Test Slate 5
Viscosity, Water, TBN for diesel engine oils or TAN for non-diesel engine oils, Spectrochemical Analysis
Coolant Basic
Appearance, Freeze Point, Glycol Content, Boiling Point, pH, Total Dissolved Solids, Chlorides, Nitrites, Nitrates, Phosphates, Sulfates and Metals (Fe, Cu, Al, PB, Zn, Mo, B, Si)
Coolant Advanced
Appearance, Freeze Point, Glycol Content, Boiling Point, pH, Total Dissolved Solids, Chlorides, Nitrites, Nitrates, Phosphates, Sulfates, Metals (Fe, Cu, Al, PB, Zn, Mo, B, Si) and Organic Acid Inhibitors (Total Cumulative)
Supplemental
Analytical Ferrography
Special Testing
TBD

Definitions of Test Slates:

Test Slate 1:This test slate will be used for testing used diesel engine oil samples.
Test Slate 2:This test slate will be used for testing used hydraulic oil and gas turbine oil samples.
Test Slate 3:This test slate shall be used for testing used refrigeration, circulating, compressed air, and bearing samples.
Test Slate 4:This test slate shall be used for testing used gear oil samples.
Test Slate 5:This test slate shall be used for testing new oil samples.

Coolant Basic: This test slate shall be used for testing standard inhibited coolant samples.

Coolant Advanced: This test slate shall be used for organic acid or extended life coolant samples.

Special Testing: This test slate shall be used for special testing of lube oil or coolant residue/materials unavailable in above lists. Scope of effort, techniques used, and costs are to be determined and approved by the Government at the time the need is identified.

II. Physical Test Properties (Lube Oil)

Physical Test Property
Description
Unit of Measure
Viscosity
Test in accordance with ASTM D445. Report Viscosity at 40°C for non-diesel engine oils and V100°C and 40°C for diesel engine oils.
cSt
Water
Water content shall be tested for by using industry accepted screening methods. If any water content is detected, the Karl Fischer water test (ASTM 6304) will be run. Report any Free Water observed as percent by volume.

Polyalkylene glycol (PAG) based oils always require Karl Fischer water test.

PPM or Percent by volume

Total Base Number (TBN)
Test in accordance with ASTM D2896/D4739.
Testing Range 1-70
Total Acid Number (TAN)
Test in accordance with ASTM D664.
Testing Range up to 6.0
Soot Index
Test in accordance with industry approved soot meter or using Fourier Transform Infrared (FTIR) spectroscopy.
Testing Range between 0.01 to 5.0%
Oxidation
Test using Fourier Transform Infrared (FTIR) spectroscopy.
Testing Range 1-50 A/Cm
Direct Reading Ferrography
Particle size index shall be reported in microns using industry accepted test methods.
Testing Range 0-1000 microns
Analytical Ferrography
Perform test as directed by DR Wear Particle Content (WPC), Particle Count testing, and/or trend analysis and requested by the Government.
Fuel Oil Dilution
Fuel dilution shall be tested using gas chromatograph (GC) equipment following ASTM D7593.
Percentage by volume (0.1-15%)
Particle Counting
Test in accordance to ISO 4406 or ISO 11171 guidelines. Test results provided shall be the actual particle count readings in 4/6/14 micron size including the class designation.
Testing Range 4 micron/6 micron/14 micron

III. Spectrochemical Analysis:

The Contractor shall conduct oil elemental analysis using an atomic emission spectrographic analyzer (ASTM D5181 or D6595) and report concentrations of the following elements:

Wear Metal
Symbol
Unit of measurement
Aluminum
(Al)
PPM
Boron
(B)
PPM
Barium
(Ba)
PPM
Calcium
(Ca)
PPM
Chromium
(Cr)
PPM
Copper
(Cu)
PPM
Iron
(Fe)
PPM
Lead
(Pb)
PPM
Magnesium
(Mg)
PPM
Molybdenum
(Mo)
PPM
Nickel
(Ni)
PPM
Phosphorous
(P)
PPM
Potassium
(K)
PPM
Tin
(Sn)
PPM
Silicon
(Si)
PPM
Silver
(Ag)
PPM
Sodium
(Na)
PPM
Titanium
(Ti)
PPM
Zinc
(Zn)
PPM

IV. Analytical Ferrography Testing Standards:

The Contractor shall conduct ferrographic analysis as dictated by results of DR Wear Particle Content (WPC), Particle Count testing, and/or as dictated by the Government. The following elements shall be included on each analytic ferrography report submitted to the Government:

· A representative photograph of sample from 100x-1000x in magnification

· Wear particle count

· Normal wear concentration

· Sliding wear concentration

· Severe wear concentration

· Wear particle size determination

· Dark oxide concentration

· Red oxide concentration

· Corrosive wear particle concentration

· Non-Metallic Particle Concentration

· Non-Ferrous Metallic Particle Concentration

· A narrative with a statistical list of suspected problems and the recommended actions

· Sample analysis data

III. Physical Test Properties (Coolants)

Physical Test Property
Description
Unit of Measure
Freeze Point
Test in accordance with ASTM D3321. Report Freeze Point in °F.
°F
Glycol Content
Test in accordance with ASTM D3321. Report Glycol Content as percent by volume.
Percent (%)
pH
Test in accordance with ASTM D1287.
Total Dissolved Solids
Test in accordance with ASTM D1125. Report in PPM.
PPM
Chlorides
Test in accordance with ASTM D5827. Report in PPM.
PPM
Nitrites
Test in accordance with ASTM D5827. Report in PPM.
PPM
Nitrates
Test in accordance with ASTM D5827. Report in PPM.
PPM
Phosphates
Test in accordance with ASTM D5827. Report in PPM.
PPM
Sulfates
Test in accordance with ASTM D5827. Report in PPM.
PPM
Metals (Fe, Cu, Al, Pb, Zn, Mo, B, Si)
Test in accordance to ASTM D6130. Report in PPM.
PPM
Appearance
Report color, clarity, presence of sediment and/or petroleum layer
Boiling Point
Test in accordance with industry approved standards. Report in °F.
°F
Organic Acid Inhibitors
Test in accordance with industry approved standards. Report in Percent (%).
Percent (%)

The data analyst shall provide remarks to indicate the test results have been reviewed and verified. Additional information concerning sample condition such as abnormal visual appearance, presence of contaminants or inability to perform test results due to insufficient sample, shall also be provided in the laboratory comments of the data format (Attachment B).

The data analyst shall employ analysis techniques using USCG furnished threshold limits, trend analysis or OEM threshold limits to determine oil sample condition (normal, caution, abnormal or critical) and provide alert indications. Recommendations are required. The analysis provided shall be at no additional cost to the Government.

ATTACHMENT (B): CONTRACTOR’S TEST EQUIPMENT

AND CAPACITY

TEST
TEST METHOD

(ASTM/ISO)

TYPE OF EQUIPMENT USED
QUANTITY AND SERIAL #S OF EACH EQUIPMENT
NUMBER OF SAMPLES PER EQUIPMENT PER DAY

VISCOSITY @ 40C

ASTM D445

VISCOSITY @ 100C

ASTM D445

WATER CONTENT

ASTM D1744/ D6304

TOTAL BASE NUMBER

ASTM D2896/D4739

TOTAL ACID NUMBER

ASTM D664

SOOT INDEX

FTIR/Soot Meter

OXIDATION

FTIR

SPECTROCHEMICAL ANALYSIS

ASTM D5185/D6595

FUEL DILUTION

ASTM D7593

PARTICLE COUNT

ISO 4406 or ISO 11171

DIRECT READING FERROGRAPHY

13
ANALYTICAL FERROGRAPHY
14
FREEZE POINT
ASTM D3321
15
GLYCOL CONTENT (%)
ASTM D3321
16
pH
ASTM D1287
17
TOTAL DISSOLVED SOLIDS
ASTM D1125
18
CHLORIDES
ASTM D5827
19
NITRITES
ASTM D5827
20
NITRATES
ASTM D5827
21
PHOSPHATES
ASTM D5827
22
SULFATES
ASTM D5827
23
METALS (Fe, Cu, Al, Pb, Zn, Mo, B, Si)
ASTM D6130
24
BOILING POINT
25
ORGANIC ACID INHIBITORS (Cumulative Total)

LAST UPDATED: XX/XX/XXXX PAGE 8/17

File details come from the government source that posted it. Updated .