SOW_KIMO_Repair_Propane_Tanks.docx
DOCX document 64 KB Posted
- Attached to
- Repair Propane Tanks for NPS, Kings Mountain NMP
- Solicitation number
- 140P5125Q0043
About this file
This Statement of Work (SOW) details a repair and safety enhancement project for propane tank systems at Kings Mountain National Military Park in Blacksburg, SC. The National Park Service requires a contractor to replace crash bollards around the Library/Conference Building, install safety placards on five propane tank systems, and perform annual gas line inspections across five existing steel propane tanks located at different park facilities. The project is a firm, fixed-price contract with a 90-calendar day completion timeline, set to be awarded in April 2025.
The solicitation (140P5125Q0043) is a small business set-aside under NAICS code 213112 with a small business standard of $41,500,000. Interested offerors must have an active SAM.gov registration and be self-certified under the specified NAICS code. The procurement will use simplified acquisition procedures with a lowest price technically acceptable evaluation method. Key response dates include a question submission deadline of August 8, 2025, at 12:00 PM EST, and a quote submission deadline of August 12, 2025, at 5:00 PM EDT, with quotes to be emailed to jade_bynum@nps.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P5125Q0043.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL PARK SERVICE
KINGS MOUNTAIN NATIONAL MILITARY PARK
REPAIR PROPANE TANKS
SCOPE OF WORK
Background:
The National Park Service (NPS) owns and operates Kings Mountain National Military Park located at 2625 Park Rd, Blacksburg, SC, within Cherokee and York Counties. The park was established to commemorate the October 7th, 1780, patriot victory at King’s Mountain in the Southern Campaign of the American Revolution.
The purpose of this project is to replace one set of existing crash bollards with new bollards that provide protection which meets applicable standards, install safety placards on five propane tank systems, and to perform annual gas line inspection on five propane tank systems.
This is a firm, fixed price contract, with all work to be complete within 90 calendar days of the notice to proceed date. The contractor is responsible for obtaining and verifying final measurements and existing conditions in order to meet the desired outcome prior to submittal of bid. All work must be performed in accordance with all applicable laws, regulations, and permit requirements. The contractor shall provide all management, supervision, labor, materials, supplies, tools, equipment, and all other items necessary to coordinate and ensure quality workmanship.
Existing Equipment:
· Park Headquarters, 1,000 gallon, steel propane tank
· Library/Conference Building, 1,000 gallon, steel propane tank
· Visitor Center, 1,000 gallon, steel propane tank
· Mary Morris House, 500 gallon, steel propane tank
· Maintenance Area, 500 gallon, steel propane tank
Scope of Services:
· Replace existing crash bollards surrounding the Library/Conference Building with new bollards that comply with ASME, ASTM, DOT, NFPA, and OSHA standards. Existing crash bollards are spaced too far apart and do not provide adequate protection.
· Specific applicable standard noted during safety inspection includes OSHA 1910.110(d)(7)(iv)(d)
· Inspect each gas line in accordance with Appendix C of the International Fuel Gas Code (IFGC).
· Install warning placards (no smoking, and flammability/hazardous material classification) on each tank. Flammability/hazardous material classification placard shall include the following information: phrase “flammable gas”, the symbol which indicates the flammability (1075), and the number 2 to indicate the hazardous material classification.
· Specific applicable standards noted during safety inspection include OSHA 1910.110(c)(2), OSHA 1910.106 (f)(6), NFPA 704, and NFPA 30, 21.7.2.2 (2018)
Additional Requirements:
· All work shall be performed under a single prime contract.
· The facilities are frequented by park staff and visitors. The contractor will need to install markings, temporary barricades, and safety measures to provide safe working conditions for park staff, visitors, and contractor employees.
· The contractor shall sequence work in order to minimize disruption of services available at the facilities by limiting access restrictions due to work.
1 General Provisions
1.1. All work performed by the contractor shall be performed in accordance with all applicable laws, regulations, industry standards, and commercial practices.
1.2. Contractor is responsible for meeting all ASME, ASTM, DOT, IFGC, IPC, MUTCD, NFPA, OSHA, and other industry regulations applicable for scope of work. Contractor personnel shall possess and maintain all required certifications, contractor is responsible for ensuring that appropriate certifications are in place.
1.3. Contractor shall research and verify, and at all times comply with all applicable laws, life safety codes, ordinances, rules, regulations, and orders of authority having jurisdiction.
1.4. The work to be performed under this contract consists of providing all materials, labor, equipment, tools, and services necessary to include all related incidental work in accordance with the bid schedule and specifications herein. Therefore, any items not specifically noted but necessary for performance in accordance with accepted industry standards shall be furnished under this contract.
1.5. Only changes as approved in writing by the CO shall be deemed authorized. Any other form of changes performed under this contract that are unauthorized shall be the burden of the Contractor and shall be at no cost to the Government.
1.6. Contractor is responsible for researching and obtaining any and all required permits that apply for scope of work.
1.7. Contractor shall properly dispose of all refuse materials generated through performance of work.
1.7.1. The contractor shall provide the COR with the tare weight for all materials disposed of, and/or recycled upon completion of work.
1.8. Temporary staging and storage locations (if necessary) shall be coordinated with COR in advance of work.
1.8.1. The contractor shall limit staging and minimize holding of large materials and/or debris in order to reduce the impact on parking at the facility.
1.9. Worksite, and staging area shall be maintained in a tidy manner. Contractor shall confine his work, the storage of materials and equipment, the parking of vehicles, and all other operations in connection with this contract to the areas approved by the COR while on NPS grounds.
1.10. The contractor shall take all reasonable precautions to avoid damaging the surrounding work area to include asphalt, stone walls, and the landscape during the performance of their work. The contractor shall protect the work site from silt/debris run off that could impact parking areas, roadway, landscape, walkways and other accessible features near the work site.
2. Scheduling and Hours of Work
2.1. The determination of the total daily productive man hour requirements, and total quantity of materials for the performance of all work specified herein is the sole responsibility of the bidder.
2.2. All work shall be performed between the hours of 7:30am and 5:00pm during the normal 5 day workweek, Monday through Friday; work on Federal holidays is excluded, unless specifically approved in advance.
2.3. Scheduling of all work must be approved in writing by the COR.
2.4. Requests for shutdown of utilities, buildings, park grounds, and roads shall be made in writing to the COR at least 14 calendar days in advance, in order to minimize disruption to public use and traffic patterns.
2.5. The Contractor will follow the Federal Government Work Schedule policy by the Office of Personnel Management (OPM) for determination of closures or delays to the contract work schedule (i.e., government closed on a federal holiday, the personnel will not report).
2.6. All work outside of the designated performance hours are required to be requested seven (7) business days in advance, in written form, by the Contractor to the Contracting Officer’s Representative (COR) for approval
3. Supplies, Materials, and Equipment
3.1. The Contractor shall furnish all supplies, materials, equipment, and ancillary services necessary for the performance of the work of this contract.
3.2. All equipment shall meet Federal, OSHA, State, and local safety requirements, including proper licensing.
3.3. Contractor must field verify all quantities and dimensions affecting the work of this contract, and must field verify all new and existing dimensions affecting the work of this contract.
3.4. Contractor shall not use any materials which the COR determines would be unsuitable for the scope of work or harmful to any part of the landscape, roadway, park resources, equipment, or persons.
3.5. The contractor is responsible for the procurement, scheduling and management (schedule, procure, supply, payment, etc) of temporary worksite protection measures necessary for performance of work associated with this contract.
3.6. The Contractor shall locate utilities in the field prior to engaging work that could damage utilities by contacting a private utility marking company forty eight (48) hours in advance of work. Utility marking company must mark the area prior to any digging.
3.6.1. Work involving excavations shall not commence until the COR has confirmed site inspection and clearance by park archeologist.
3.6.2. Contractor will be held liable for any damages to utilities resulting from performance of work and will be responsible for the protection of existing utilities and related structures.
4. Contractor Qualifications
4.1. Contractor shall possess the necessary knowledge, skills, abilities and resources to perform the work herein and within the "best industry" standards and practices. The contractor shall be responsible for professional quality, technical accuracy, project coordination, material installation, disposal of existing materials, and all other items required to deliver and handover a complete project to the NPS upon completion of work.
4.2. Contractor represents familiarity with the scope and nature of the work required by the NPS, and understands the conditions under which it will be obligated to operate.
4.3. Contractor shall be licensed and certified to perform the scope of work, and in the use of the required equipment outlined in the IFGC for inspections.
5. Submittals - Submit documents for NPS approval as specified.
5.1. Before any work commences, the COR must approve the following submittals:
5.1.1. Placard specifications and proposal for installation method.
5.1.2. Shop drawings which show at a minimum proposed demolition plan for existing bollards, installation diagram for new bollards, and all components required for bollard installation.
5.2. Upon completion of work, and required for contract close out, the COR must approve the following submittals:
5.2.1. As built diagram for new bollards.
5.2.2. IFGC gas line inspection report.
5.2.3. Contractor warranty information for installation and labor. (1 year minimum required)
6. Quality Assurance/Control
6.1. All materials shall be installed according to technical specifications.
6.2. Work performed under this contract shall be subject to inspection and approval by the COR.
6.3. Careless, unsafe, and other performance issues that have been previous addressed within this scope will not be acceptable.
6.4. Any deficiencies shall be documented by the COR and provided to the contractor. Any corrective actions or other form of addressing the documented concern/issues shall be addressed and mitigated, or provided with a timeline for being addressed with appropriate identified method, within eight (8) hours from the time of notification with approval as such from the COR.
7. Safety and Health - The contractor shall provide all required supervision, safety protection devices, and personal protective equipment (PPE), required for complete and safe operations on site. Protective measures shall prevent injury to the public, Federal employees and contractors, visitors, Contractor’s employees, and damage to or contamination of surrounding property and/or the environment.
8. Contractor/Contractor Personnel Responsibilities
8.1. Contractor shall provide a contact list of Contractor personnel assigned to the contract within 10 days of award for communication purposes to the COR. This list should at the minimum provide the names of key personnel, titles, email address(s), office number, and cellular number.
8.2. Contractor shall provide cellular phones to their supervisor or foreman for contact and information associated shall be provide to the CO/COR.
8.3. Contractor shall provide labor records for all personnel assigned to perform work of this contact to the CO/COR as defined in deliverables schedule.
8.4. Contractor vehicles, if company owned shall have the contractor’s name and logo on each side of the vehicle and shall display a park provided vehicle pass (if necessary) within the vehicle where it shall be clearly visible.
8.5. Contractor/ Contractor Personnel shall park in legal parking spaces identified by the park/or within the park.
8.6. Contractor personnel shall wear either the standard company issued uniform or approved attire by company’s standards (shirt, smock, coveralls) of a distinctive color clearly bearing the Contractor’s company name and an approved method of identification as issued by the Contractor. Uniform must be worn at all times by personnel when performing work of this contract.
8.7. Contractor shall require its employees to comply with the instructions pertaining to conduct and park regulations.
8.7.1. Contractor personnel shall perform work in a safe manner. Unsafe work habits shall be addressed by the COR to the Contractor to have corrective measures implemented. Should the unsafe work habits persist, the Contractor will be notified by the COR and required to remove the Contractor personnel.
8.7.2. Contractor personnel shall have a form of Government issued identification in their possession at all times while performing work of this contract.
8.7.3. Contractor personnel shall be respectful, courteous and mindful of the park environment, visitors, and park personnel. Contractor personnel are subject to the rules and regulations of the NPS at all times while performing work of this contract.
8.8. Contractor shall be requested by the CO to remove personnel in its employment on this contract for the following reasons:
8.8.1. Exhibiting inappropriate or offensive behavior while performing work of this contract or while on federal property.
8.8.2. Disrespect to NPS employees or visitors during performance of the contract.
8.8.3. Using illegal drugs, drinking alcoholic beverages, intoxicated behavior or unsafe work habits.
8.8.4. Any other misconduct or inappropriate behavior.
8.8.5. Contractor shall be responsible for immediate removal of contractor personnel that do not follow conditions set forth within this contract. When it is necessary to remove a personnel(s), the contractor shall immediately provide a replacement(s) to carry out the services to be performed under this contract. Contractor is responsible for obtaining all Government issued property from the removed personnel; providing to the COR within three (3) business days.
9. Government Responsibilities
9.1. NPS shall provide site access as approved and appropriate for performance of this contract.
9.2. Neither electrical power nor potable water will be furnished by the Government.
9.3. Restroom facilities are located within the park.
9.4. Staging areas made available to the contractor will only be used in the performance of work under this contract. The Contractor shall maintain such space in a neat, orderly condition, and shall at the expiration of the contract, return it to the Government in reasonably the same condition as at the time of entering into the contract. The Government does not assure security or safekeeping of items stored on the worksite, and will not be responsible for any damage or loss to the Contractor’s stored supplies, materials, equipment, or replacement parts.
10 Pre-Work Conference
10.1 A pre-work conference will be conducted between the National Park Service Contracting Officer (CO) and the Contractor prior to the beginning of the work.
10.2 The Contractor shall designate in writing at this meeting the names, telephone numbers, and work addresses of all supervisors. The Contractor or his/her supervisor shall be available at all times when the contract work is in progress to receive notices, reports or requests from the CO or the COR.
10.3 It is advised by NPS CO that the Contractor Supervisor and other key personnel attend the pre-work conference as key members of the Contractor’s personnel team for this contract.
11 Reports
11.1 The contractor shall file required reports with the COR.
11.2 The contractor shall note and report to the COR in writing the presence of any conditions that need to be addressed and cannot be corrected within the scope of work described herein. If so directed by the COR the contractor shall provide a proposal for performing the prescribed work that includes a breakdown with unit prices for labor, materials, and equipment required to perform the task(s). The COR will evaluate the proposal and if valid will seek approval from the Contracting Officer. Failure of the contractor to obtain the approval of the Contracting Officer for work beyond the scope of the contract will release the government from any obligation to pay for services claimed.
12 Government Points of Contact - NPS, IR2 shall designate a Contract Officer and an individual to serve as the CO Representative who shall be the primary point of contact for day to day operations of the program.
| Contracting Officer (CO) |
| Contracting Officer Representative (COR) |
| CO: TBD |
| COR: Andy Welborn |
| Address: |
| Address: 2625 Park Road |
Blacksburg, SC 29702
| Email: |
| Email: andy_welborn@nps.gov |
| Phone: |
| Phone: 864-490-9354 |
13 Procedures for Measurement and Payment
13.1 Any inquiry regarding payment shall be directed to the COR.
13.2 Invoice for payments will need to be submitted to the NPS COR by email at andy_welborn@nps.gov for approval of payments before being entered into Invoice Processing Platform (IPP). Once approval is received by the COR, the Contractor may submit payments in IPP for processing.
13.3 Invoices must provide the following information:
· Date of Invoice
· Contractor’s Contact Information (Email, Phone, Fax, Address)
· Contractor’s Point of Contact (POC) for Billing
· Billing Address
· Billing POC Contact Information (Email, Phone, Fax, Address)
· Billing Period (must fall within period of performance)
· Location(s) of Service(s)/Delivery performed
· Rate of Service(s)/Item(s)
· Invoice Number
· Contract/Task Order Number
· Date of Service(s)/Delivery
· Acceptance Documents, and any Quality Assurance Documents
· Description of Service(s)/Item(s) Delivered/Performed
13.4 Hard copies of an invoice may be mailed to the following if preferred. Please note if mailed, it may take longer for response from COR for payment approval to be processed in IPP:
National Park Service
| Kings Mountain National Military Park |
| COR: Andy Welborn |
| 2625 Park Road |
| Blacksburg, SC 29702 |
| Contract Number: TBD |
13.5 All payment requests, once approved by the COR, must be submitted electronically through the U.S. Department of the Treasury's (https://www.ipp.gov) Invoice Processing Platform System (IPP).
13.6 Invoices must clearly state where work was performed and what work consisted of.
13.7 The Contractor shall upload a copy of the invoice as an attachment(s) through IPP.gov. The invoice will be rejected if a copy is not attached through IPP.gov.
April 2025, Repair Propane Tanks, KIMO 330913A image1.jpeg
File details come from the government source that posted it. Updated .