SOW JBSA CAMP BULLIS B5413 Rev 4.16.25 - Draft.pdf
PDF 267 KB Posted
- Attached to
- Camp Bullis Dormitory Furniture
- Solicitation number
- FA301625Q0166-SS
About this file
This Statement of Work (SOW) details a furniture replacement project for the Technical Training facility at Joint Base San Antonio (JBSA) Camp Bullis, specifically Building 5413. The project requires the contractor to procure, deliver, install, and dispose of dormitory furniture, including 188 heavy-duty twin bunkable beds, 188 twin mattresses, 188 nightstands, 94 student desks, and associated furniture. The scope involves removing existing furniture, with some items (81 storage wardrobes and 187 student desk chairs) to be transported to a designated warehouse instead of being disposed.
The project has specific requirements including working during 7:45 AM to 3:30 PM hours Monday through Friday, obtaining base access passes, wearing identifiable contractor clothing, and following strict protection and clean-up protocols. The contractor must coordinate closely with the Program Manager, provide a single point of contact, give 15-day and 24-hour advance notifications before delivery, and ensure minimal disruption to training students occupying the building. All furniture must be new, with a minimum one-year commercial warranty, and the contractor is responsible for managing all logistics, protection of building property, and proper disposal of debris.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice - Dormitory Furnishings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 -
STATEMENT OF WORK
Dormitory Furniture Delivery, Installation, and Disposal
Technical Training Facility JBSA Camp Bullis Student Dormitory Building 5413
PROJECT DESCRIPTION:
Procure student dormitory furniture for the Technical Training facility, at Joint Base San Antonio (JBSA), Camp Bullis dormitory living facility throughout building 5413. Most designated furnishings currently stored within the facility shall be removed and disposed by the awarded contractor in accordance with industry standards. However, two (2) different furnishing items, indicated in the below chart i.e. Storage Wardrobes and Student Desk Chair quantities shall be removed from building 5413 and transported to the storage warehouse and placed within the building 4193 designated Ft Sam Houston storage warehouse area. All removed and replaced furnishings shall be replaced accordingly within phases as instructed by the onsite program manager (PM) indicated below and with minimum disturbance to training students housed throughout the facility.
Note: The awarded contractor shall provide all management, supervision, tools, supplies, labor, equipment, transportation, storage, installation with required assembly, and removal of designated furnishing and appliances as directed by the onsite PM. The contractor shall ensure removal and disposal of all designated furniture throughout the building along with any related packaging trash and dispose outside the installation.
The facility site shall be at Camp Bullis building 5413 with physical address at 5413 McWiliams Road, JBSA Lackland Camp Bullis, TX 78257. Note: Building 5413 shall be occupied with training students and will remain occupied for the duration of this project. Note: The contractor shall not have any communications with the students and only consult with the onsite PM regarding any furnishings project concerns.
The awarded contractor shall deliver, install, remove, and dispose of all designated furnishings in accordance with following throughout JBSA Lackland building 5413 with physical address located at Camp Bullis, JBSA Camp Bullis, Texas 78257:
Items to Install IAW Industry Standards and based on below Salient Characteristics
Items to Install Throughout Bldg. 5413
Total Items for Disposal
Physical Delivery Address at 5413 McWilliams Road, JBSA Camp Bullis, Tx 78257
Total Items to Transfer from Camp Bullis Bldg. 5413 to Ft Sam Houston Warehouse Bldg.
4193 located at 2100 Supply Street at
JBSA FSH 78234
- 2 -
Heavy Duty Rated Twin Single, Bunkable Beds
188 188 5413 McWilliams Rd, JBSA Camp Bullis, Tx 78257
Twin Mattresses 188 188 5413 McWilliams Rd, JBSA Camp Bullis, Tx 78257
Nightstands 188 188 5413 McWilliams Rd, JBSA Camp Bullis, Tx 78257
Storage Wardrobes 188 0 5413 McWilliams Rd, JBSA Camp Bullis, Tx 78257
Student Desks 94 94 5413 McWilliams Rd, JBSA Camp Bullis, Tx 78257
Student Desk Chairs 94 0 5413 McWilliams Rd, JBSA Camp Bullis, Tx 78257
PROJECT PHASES: The contractor shall work closely with the PM to ensure the installation and removal process is completed in a satisfactory manner with limited disturbance to the students. Of the four (4) floors throughout the facility, the contractor shall work to clear one floor at a time and ensure the removal and installation of furnishing items are complete per room as the students are physically away from the facility. Preferably, all old furnishings shall be removed and new furnishings installed in place with a completion mindset as the contractor moves throughout each floor. The contractor shall begin in order of first, second, third and fourth floor and notify PM accordingly as they complete each floor.
SALIENT CHARACTERISTICS with estimated variances:
BUNKABLE TWIN BED: Wooden Heavy Duty, Stackable (Bunkable) with Wedge Lock Spring Units, without Facia Rails; smart bed. Heavy duty rails, bunkable, adjustable height bed with solid metal insert in post ends. Dimensions: 80” to 85” Length, 39” to 42” Width, 33” to 35” Height. Heavy duty rated single, bunkable, adjustable height bed with solid metal inserts in post ends. Seven (7) positions. Accepts a 38 x 80 mattress (extra-long twin).
TWO DRAWER NIGHTSTAND: Two equal size Drawers; High Pressure Laminate Top with internal Banded Solid Oak Bullnose Edges; integrated Figure Pulls and Oak Veneer Core Plywood Construction Dimensions: 18” to 22” Width, 19” to 23” Depth: 23” to 25” Height.
Solid Oak Two equal size drawers shall include Heavy duty drawer suspensions: ball bearing slides with positive stop drawer release (100lbs); two per drawer 3/4extension.
PEDESTAL DESK: Single Wooden Pedestal Desk with NO CARRELL/HUTCH, High Pressure Laminated Top, Four (4) Drawers; Dimensions: 42” to 46” Length, 18” to 22” Depth and 30” to 33” Height. Panel end pedestal desk with 2 boxes and 1 file drawer, pencil drawer in
- 3 -knee space. High pressure laminate top with internally banded solid oak bullnose or similar edges, integrated finger pulls, oak veneer core plywood construction with +/- 1 (one) inch variance.
STORAGE WARDROBE: Dimensions: +/-1 (one) inch on dimensions variance is acceptable Width: 36.5″, Depth: 25.25″, Height: 72.25″, Weight: 180lbs. Wood Face door Pull. With top Shelf, internal shatter proof mirror placed on internal door, and closet rod. Natural Oak Finish with standard mirror on internal door.
STUDENT DESK CHAIR – Wood Seat & Back: All desk chair components are solid oak with hardwood corner blocks in each corner and wood seat and solid back support with dimensions (18” x 18” x 32:”H with a variance of +/- 1 inches. (Preferred New England Model Number #2085).
PROJECT MANAGEMENT
The awarded contractor shall identify and provide a single Point of Contact (POC) to provide overall management, supervision and detailed communications throughout the term of this project. The POC will serve as a representative for the PM customer to ensure the delivery, installation and disposal of furniture is successful. All pertinent communications should be confirmed in writing.
The awarded contractor shall provide the Government/Program Manager (PM) a 15-day notification prior to delivery, a 24-hour notification prior to truck arrival and shall also provide email notification as to the date and time the trucks will be arriving to the PM:
- The building PM shall be, Ms. Veronica Escamilla and can be contacted only during regular office hours at office contact number (210) 295-0284 or mobile contact number (832) 329-2003 and email: veronica.escamilla@us.af.mil.
ADDITIONAL PROJECT INFORMATION:
- All materials and accessories shall be installed in accordance with industry standards and manufacturer’s recommendations. Space can be made available to allow for staging or storage on the site’s parking lot, but the contractor must coordinate with the Government PM upon award. The contractor will also coordinate all deliveries and installation times with the Government Representative no later than 72 hours prior to delivery.
- As of now, there are not any other projects taking place in building 5413 during this dorm furniture install/disposal. However, the contractor should stay in communication with the Government Representative before and during the installation to ensure another project hasn’t been scheduled. Contractor shall take this into consideration when planning for delivery, installation and disposal of the items required by this SOW.
- 4 -
- Contractor shall provide their own dumpsters for contractor generated refuse as a result of this requirement. All contractor dumpsters must be located outside of building perimeter and must be emptied as soon as it is full. The government will not provide any dumpsters and will not provide any equipment for implementation and completion of this requirement.
QUALITY ASSURANCE
The Government shall inspect all work performed by the contractor. The inspection shall be completed by the Government representative and reported to 502 CONS. Work performance shall be deemed satisfactory and acceptable by the government when the 37 TRSS Program Manager declares the project satisfactory.
The contractor shall deliver all items specified, deliverables shall be new and not used or factory refurbished. If repair or replacement of damaged items is needed, the contractor shall repair or coordinate replacement of damaged, defective, or missing items. The Government may require repair or replacement of nonconforming supplies or re-performance of non-conforming services at no increase in the contract price. Any disputes in this area must be brought to the attention of the Government Representative and the Contracting Officer immediately.
HOURS OF OPERATION AND FURNISHINGS MOVEMENTS
The awarded contractor shall perform all work during the hours of 7:45 AM to 3:30 PM, Monday through Friday. Work outside of normal business hours shall be requested from and approved by the Contracting Officer. The awarded contractor is not required to perform work during federal holidays such as the following, i.e., (New Year's Day, Martin Luther King Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day).
PROTECTION OF BUILDING PROPERTY
The contractor shall provide all material to protect all floors, carpeted areas, walls, carpeting from damage and soil during the moving and installation. The protective materials shall not be bolted, glued, or stapled to floors, carpeted areas, walls, ceilings, or doors but instead shall either be free standing or braced so as not to cause any damage.
Proper measures (protective runners, pads, etc.) shall be provided where necessary and utilized by the contractor to protect the building (stairs, stairwells, walls, floors, etc.). The contractor shall establish and maintain this protection and maintain it throughout the full term of the purchase order. The contractor shall furnish furniture padding or other acceptable protective materials for the interior of the building, including, door frames, thresholds, and corners to which the property shall be moved under this purchase order. Any damage caused by the contractor shall be the responsibility of the contractor to repair or replace.
After the installation of each phase, the contractor and government representative shall jointly conduct a walk-through and annotate any new damage at the new location. Any damage caused
- 5 -by the contractor will be the responsibility of the contractor to repair or replace at no additional cost to the Government.
WORK SITE
Throughout the furnishing’s movement process, the awarded contractor shall collect all trash, debris, refuse, garbage, etc., which is generated, remove and properly dispose of all applicable materials from the work site. Trash and debris collection shall be coordinated by the contractor and disposed of off base. The contractor shall ensure required equipment is available for removal of debris, refuse, and garbage before and during the delivery of the dorm furniture. The contractor shall take precautions to prevent damage to government property. The contractor shall repair or replace damaged items resulting from contractor performance of this requirement at no additional cost to the government. It is incumbent for the contractor to identify any existing damage to the building by means of a Pre-Installation and Delivery Walk-Thru, and submissions of checklists to the PM on site.
BUILDING STAIRWELL(s) JBSA Camp Bullis Building 5413 is a three (3) story dormitory building with nighty four (94) dormitory rooms, all located with access from within the facility and each consists of two (2) students per room. This facility has one (1) interior stairwell and no available elevator.
WARRANTIES
Contractor shall provide all commercial warranties for a period of not less than one-year from the date of installation/acceptance/delivery for all issued furnishing items.
INSTALLATION ACCESS
The awarded contractor and all employees shall meet minimum security requirements to gain access on to Joint Base San Antonio (JBSA) Camp Bullis, Texas. A ten (10) day advance notice is needed for a base access pass, and any person with a background history may not be able to enter the military installation. A base access pass for an employee without a U.S. Driver’s License of US State issue ID card may take longer.
The contractor shall obtain all required installation passes for contractor personnel by providing the employees full name, date of birth, Driver’s License/ID information and Country born into the Government Representatives identified within this document. Contractor personnel shall be able to produce personal identification when required by current force protection conditions or special instructions.
The contractor personnel shall wear an identifiable outer garment (company shirt) or badge which clearly identifies a contract employee. The badge shall contain a name of employee and contractor's name and/or special company identifier when a/o if confronted.
- 6 -
CLEAN-UP
All debris and rubbish resulting from this requirement shall be disposed of by the contractor off Government property. The Government will designate a location for a contractor provided dumpster, if necessary. Disposal will be compliant with all applicable Federal, State, and local hauling and disposal regulations. Site clean-up shall occur daily. Contractor shall a thorough cleaned up work site at the end of each working day prior to departing the installation.
END OF STATEMENT OF WORK
File details come from the government source that posted it. Updated .