SOW - HVAC Repairs and Fan Coil Unit Troubleshooting_Updated 41526.docx
DOCX document 76 KB Posted
- Solicitation number
- 70Z02726QPORT0038
About this file
This is a Statement of Work (SOW) for HVAC repairs and fan coil unit troubleshooting services at U.S. Coast Guard Station Little Creek in Virginia Beach, Virginia. The contractor must provide all labor, supervision, materials, equipment, tools, and incidentals to complete the work within 30 working days of contract award, with mobilization required no later than ten days after notice to proceed. The scope includes repair of a TRANE HVAC unit on Circuit #2, requiring removal and replacement of the defective condenser coil, expansion valve, and associated filter driers, followed by system evacuation, recharge, and balance to factory specifications. Additionally, the contractor must troubleshoot, diagnose, and repair seven fan coil units throughout the station: six units that do not power on (located in Rooms 137, 131, Galley, Fitness Room, Cardio Room, and Room 227), one unit requiring motor replacement (Conference Room), and one unit with excessive condensate production requiring drain pan, drain line, and coil inspection (Crew Lounge). Prior to conducting repairs on the fan coil units, the contractor must submit a Condition Found Report for all seven units to the government for written approval before proceeding with any corrective actions.
The contract is a firm-fixed price award under a 100 percent small business set-aside using NAICS code 333415 (Air-Conditioning and Warm Air Heating Equipment Manufacturing), with a small business size standard of 1,250 employees. The contractor must complete equipment enrollment documentation using the Equipment Enrollment Form with UNIFORMAT II Level 4 designations for plumbing, HVAC, electrical, water systems, and any machinery or equipment installed. All work must comply with OSHA regulations, EPA environmental requirements, and lockout/tagout procedures coordinated with Station Little Creek Engineering personnel. A mandatory site visit is scheduled for May 5, 2026 at 10:00 a.m. Eastern Time, and all quotes must be submitted by 5:00 p.m. Eastern Time on May 13, 2026 via email. Questions must be submitted in writing no later than noon Eastern Time on May 6, 2026. The Quality Assurance Evaluator and primary point of contact is EM2 Timothy Merz at 757-483-8719.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW - HVAC Repairs and Fan Coil Unit Troubleshooting_A00001.pdf | ||
| 70Z02726QPORT0038 - A00001 SF30.pdf | ||
| DOL SCA Poster.pdf | ||
| RFQ 70Z02726QPORT0038 SF1449.pdf | ||
| RFQ 70Z02726QPORT0038.docx | DOCX document | |
| SCA WD 2015-4341.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
HVAC Repairs and Fan Coil Unit Troubleshooting U.S. Coast Guard Station Little Creek
1.0 General Requirements
The Contractor shall provide all labor, supervision, materials, equipment, tools, and incidentals necessary to perform HVAC repairs and troubleshooting services at U.S. Coast Guard Station Little Creek, located at 1100 Abbott Road, Virginia Beach, VA. Work includes replacement of HVAC components and diagnosis, troubleshooting, and repair of multiple Fan Coil Units (FCUs), as detailed herein.
2.0 Commencement, Prosecution, and Completion of Work
Upon acceptance, the contractor shall commence work NLT ten (10) days after notice to proceed and work diligently to complete the entire work ready for use by 30 working days after contract award.
3.0 Scope of Work
3.1 HVAC Unit Repair Scope
The Contractor shall:
· Have the ability to perform work on TRANE systems.
· Check in with station personnel prior to mobilization.
· De-energize the HVAC unit and coordinate Lockout/Tagout (LOTO) procedures with the Engineering Division.
· Remove and replace the defective condenser coil, expansion valve, and all associated filter driers on Circuit #2.
· Install new components in accordance with manufacturer specifications.
· Evacuate, recharge, and balance the system to factory specifications per the unit nameplate.
· Test and verify proper system operation with CG personnel.
· Clean the work area and formally check out with the Quality Assurance Evaluator (QAE) upon completion.
3.2 Fan Coil Unit (FCU) Troubleshooting and Repair
The Contractor shall troubleshoot, diagnose, and repair seven (7) FCUs located throughout the station. Scope includes, but is not limited to, electrical diagnostics, control verification, motor testing, condensate evaluation, and functional testing. Specific locations and known conditions are as follows:
· Rooms 137 and 131 – FCUs do not power on.
· Galley – FCU does not power on.
· Fitness Room – FCU does not power on.
· Cardio Room – FCU does not power on.
· Room 227 – FCU does not power on.
· Conference Room – FCU requires replacement of a failed motor.
· Crew Lounge – FCU operates; however, excessive condensate production occurs during A/C operation.
Contractor should evaluate and correct the condition, including inspection of drain pans, drain lines, airflow, and coil performance.
Prior to the contractor conducting any repairs, the contractor shall submit a Condition Found Report (CFR) to the government for all seven (7) FCUs and including the drain pans, drain lines, airflow, and coil performance prior to repairs being performed. Until given written confirmation by a warranted Contracting Officer, the contractor shall not proceed with any repairs of the FCUs.
Contractor should evaluate and correct the condition, including inspection of drain pans, drain lines, airflow, and coil performance.
3.3 The Contractor shall provide a written summary of findings, corrective actions taken, and any recommended additional repairs required beyond the scope of this contract.
3.4 In the event the contractor needs additional parts outside of agreed upon contract pricing, it shall be made aware and reported to the Contracting Officer and Contracting Officer’s Representative (COR) for this project. The contractor shall not proceed with any work outside of the signed contract whereas additional funding is required unless instructed by the Contracting Officer. Once installation is complete, contractor is to ensure proper operation of the entire HVAC system and electrical systems and report to COR for inspection.
3.5 Deliverables
3.5.1 Equipment Enrollment
The intent of this section is for the Contractor to complete the Equipment Enrollment Form (EEF) spreadsheet for systems that have been installed or demolished under this project and are listed in the USCG Approved Equipment Enrollment Catalog. Both the Approved Equipment Enrollment Catalog and Equipment Enrollment Form (EEF) are provided as Reference Documents in the solicitation.
At a minimum, the following items require UNIFORMAT II Level 4 designations if the components are used in the contract:
a. Plumbing Systems
b. HVAC Systems
c. Electrical Systems
d. Water Systems
e. Any machinery or equipment installed as part of this contract
REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
a. ASTM E 1557 Standard Classification for Building Elements and Related Sitework – UNIFORMAT II
SUBMITTALS: Submit hard copy prints and electronic MS-Excel files of Equipment Enrollment Form (EEF) for Contracting Officer acceptance upon completion of the contract for each Real Property asset that has equipment to be enrolled as part of the FPMP.
3.5.1.1 Equipment Enrollment Form (EEF) Requirements:
3.5.1.1.1 Form Fields: The following fields are listed on the form and shall be completely filled out except where otherwise noted on the Equipment Enrollment Form. The actual equipment attribute list below may change slightly prior to the actual start of this enrollment task.
a. UNIFORMAT II Level IV Classification
b. Component Type (Assigned from Approved Equipment Enrollment Catalog (column D))
c. Physical Location, broken down by Floor, and Room #.
d. Manufacturer Name
e. Model Number
f. Serial #
g. Installation Date
h. Purchase Price (Cost of equipment, labor, shipping)
i. Replacement Costs (Cost of equipment only)
j. Warranty Expiration Date
k. Equipment Attributes (Name Plate information typically indicating Size, Flow, Volume, Pressure, etc.)
3.5.1.2 Only equipment from a single building and/or structure is allowed per Equipment Enrollment Form (EEF).
3.5.1.3 Equipment identified for maintenance by O&M manuals but not listed in the Approved Equipment Enrollment Catalog shall also be cataloged per ASTM E 1557 and listed on the equipment enrollment form. If the equipment is not listed in ASTM E1557, consult the Coast Guard for the proper naming convention.
4.0 Site Visit
All bidders are strongly encouraged to conduct a site visit to verify quantities and conditions prior to submitting a quote. A site visit will be held on 05/05/2026 at 1000 Eastern Time. Site visits shall be coordinated with the QAE:
· EM2 Timothy Merz Phone: 757-483-8719
5.0 Quality Assurance Evaluator (QAE)
The designated Contracting Officer’s QAE and primary point of contact for this project is:
· EM2 Timothy Merz Phone: 757-483-8719
6.0 Conditions Affecting the Work
The Contractor is responsible for inspecting the site and determining all conditions that may affect the cost or execution of the work. Failure to do so shall not relieve the Contractor from responsibility for completing the work in accordance with the contract requirements.
7.0 After Award Requirements
The Contractor shall notify the QAE immediately upon award and provide the intended start date. All work shall be completed in accordance with this Scope of Work and applicable regulations.
8.0 Oral Modifications
No oral statements or agreements shall modify the terms of this contract. Only written modifications issued by the Contracting Officer are valid.
9.0 Workmanship
All work shall be performed in accordance with industry best practices by qualified and experienced personnel and shall be subject to inspection and approval by the Contracting Officer or QAE.
10.0 Permits and Compliance
The Contractor shall obtain all required licenses, permits, and approvals at no additional cost to the Government and shall comply with all applicable federal, state, and local laws and regulations.
11.0 Cleanup
The Contractor shall remove all debris daily and leave the job site in a clean, orderly condition upon completion of work.
12.0 Work Outside Normal Hours
Any work proposed outside normal station hours must be requested in writing and approved by the QAE in advance.
13.0 Completion and Acceptance
Upon completion of work, the Contractor shall notify the QAE to schedule inspection and final acceptance.
14.0 Contractor Identification and Access
All Contractor personnel and vehicles must check in at Gate 3 Security to obtain access credentials. A valid REAL ID-compliant driver’s license and current vehicle registration are required.
15.0 Safety Requirements
All work shall comply with OSHA regulations (29 CFR 1910 and 1926). Lockout/Tagout procedures shall be coordinated and executed only by Station Little Creek Engineering personnel. Required permits (Hot Work, Confined Space, Dig Chits) must be submitted and approved prior to commencement of applicable work.
16.0 Environmental Protection
The Contractor shall comply with all EPA regulations (40 CFR series) and Station Little Creek environmental procedures. Hazardous materials and waste generated by the Contractor shall be properly handled and disposed of by the Contractor in accordance with all applicable regulations.