This Statement of Work (SOW) details HVAC chemical sampling and treatment services for Scott Air Force Base (AFB), Illinois. The contractor will be responsible for comprehensive water treatment across 14 cooling towers with 12 sumps located at 11 different facilities, 127 closed loop systems (58 chilled water and 69 hot water), and 27 coupon racks. Key requirements include performing monthly water testing and monitoring, maintaining specific chemical parameters, conducting Legionella testing twice annually using industry standard Cultured Sample Method, and providing detailed monthly system status reports.

The SOW specifies strict technical requirements for chemical treatments, including using Industrial Grade Propylene Glycol inhibited with Nitrite, maintaining precise chemical concentration ranges, and following specific testing protocols. Contractors must use innovative industry standards to minimize time and expenditure while ensuring high-quality work. Personnel performing the services must be members of the Association of Water Technologies (AWT), provide safety training documentation, and comply with environmental management systems and safety controls. The contract emphasizes precise chemical management, including minimizing on-base chemical storage, proper waste disposal, and comprehensive reporting of system conditions.

View the file

Other files

File Type Posted
SOW Attachment 1.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work HVAC Chemical Sampling & Treatment

Scott AFB, IL.

11 March 2025

1. DESCRIPTION OF SERVICES

1.1 The Contractor shall provide all labor, tools, chemical, and equipment necessary to perform cooling tower, closed loop, and coupon rack systems water/chemical sampling and treatment for the Heating, Ventilation and Air Conditioning (HVAC) equipment located at various facilities on Scott AFB, IL. There are a total of 14 cooling towers with 12 sumps located at 11 different facilities. Please note that the two towers at building 1700 share a common sump, the two towers at building 1900 cooling towers share a common sump and the three towers at B/44 each have their own sump. There are 127 closed loop systems (58 chilled water and 69 hot water), and 27 coupon racks.

1.2 The Contractor shall abide by Scott AFB, local, county, state, and federal laws under this contract. The Contractor shall use innovative industry/commercial standards/procedures and equipment to minimize the expenditure or time and funds while ensuring the highest of quality work.

2. COOLING TOWER WATER TESTING:

2.1 It is the contractor’s responsibility to perform all activities to keep the chemical feed systems always supplied with enough products to prevent the tanks or systems from becoming empty and allow proper operations. The contractor shall provide treatment to maintain a minimum of three cycles of concentration.

2.2 The Contractor shall provide all labor, tools, and equipment necessary to perform cooling tower water/chemical sampling, monitoring, and treatment to maintain the water treatment program for the following facilities:

Building 44 – North Building 1575 - South Building 1812 Building 44 – Center Building 1575 – North Building 1900 Building 44 – South Building 1650 Building 1900 Building 859 Building 1700 - 1 Building 5160 Building 1521 Building 1700 - 2

2.3 Unless otherwise agreed upon by the Government, the Contractor shall provide a separate system status report for each tower monthly.

2.3.1 Scott AFB utilizes the WALCHEM Controller Model# WCT600PNNNN-NN with Modem Millie Model # E10-VZ for monitoring the cooling tower status. The government may give the contractor access to the remote monitor status of the cooling tower treatments upon request by the contractor. The contractor shall provide a system status report of each cooling at a minimum of at least once per month. Unless otherwise agreed upon, status reports shall be submitted for approval no later than the 10th of each month. Should the 10th fall on a weekend or holiday, the report shall be due by the next business (workday) afterwards.

2.4 Unless otherwise agreed upon by the Government, the Contractor shall notify the Government two weeks in advance of any schedule changes.

2.5 The Contractor shall at a minimum test for and maintain the control range for the following monthly and provide results in the monthly report as described in paragraph 2.3. The Contractor may provide what they feel is pertinent to the testing and treatment, but at a minimum shall include the following:

2.5.1 Hardness, calcium (ppm as CaCO3) (300-500)

2.5.2 Chlorine, total (ppm as Cl2) (0.0 – 2.0)

2.5.3 Conductivity (as mmhos) (1250 – 1624)

2.5.4 pH (7.0 – 9.0)

2.5.5 Cooling Tower Traced Scale and Corrosion Inhibitor (125 – 175)

2.5.6 m-alkalinity (ppm) (260 – 400)

2.5.7 Bacteria Counts (CFU) (10,000 CFU/ml or less)

2.5.8 General remarks of tower status or any other work performed.

3. LEGIONELLA TESTING:

3.1 The Contractor shall test for Legionella of all the cooling towers identified in paragraph 2.2 twice per year at a time agreed upon by the government and contractor using industry standard Cultured Sample Method. In addition to providing quality service with quality products, the aim of this contract is to make effort to reduce and/or prevent Legionella disease.

3.2 The Contractor shall test using the industry standard Cultured Sample Method, and must be analyzed by a CDC Elite laboratory, and provide the Government the results within three (3) business days of receipt from the lab.

3.3 The Contractor shall invoice within ten (10) business days after submitting the legionella results.

4. WATER QUALITY MANAGEMENT PLAN:

4.1 As part of the overall WQMP, the Contractor shall provide all labor, tools and equipment necessary to use innovative industry and commercial standards and procedures to maintain and treat cooling towers identified in paragraph 2.2.

4.2 As part of the WQMP, the contractor may provide any information they feel pertinent to the offer, but MUST include the following:

4.2.1 List of personnel who will be performing water sampling and treatments on this contract.

4.2.2 Personnel performing sampling and treatment shall be a member of the Association of

Water Technologies (AWT), or a government approved equal.

4.2.3 Personnel Certifications/certificates of safety/environmental training completed within the last year applicable to this contract. If training exceeds an annual requirement, please indicate frequency requirement, and provide those certifications/certificates as part of the offer.

Please limit the offer to the most five pertinent training courses completed. The government reserves the right to request additional training certificates as needed. Courses in progress at the time of offer will not be considered.

4.2.4 The contractor shall provide a list for each treatment chemical they propose to use.

The contractor shall include for each chemical:

4.2.4.1 Brand Name and Manufacturer Name

4.2.4.2 Safety Data Sheet.

4.2.4.3 Technical Data Bulletin

4.2.4.4 Clearly indicate with percentage of active ingredient for each product.

4.2.4.5 Clearly identify the scale inhibitor to be used.

4.2.4.5.1 Please provide target product dosage (ppm) to be maintained in towers.

4.2.4.5.2 Please provide cost to treat 1000 gallons of makeup water at an average of three cycles of concentration.

4.2.4.6 Clearly identify Oxidizing Biocide proposed; Chlorine shall not be used.

4.2.4.5.1 Please provide a stabilized bromine product and indicate active as BR2.

4.2.4.5.2 Please provide cost to treat 1000 gallons of makeup water at an average

4.2.4.7 Clearly identify the Non-Oxidizing Biocide to be used.

4.2.4.7.1 Please provide the proposed product dosage rate in ppm.

4.2.4.7.2 Please provide cost to treat 1000 gallons of makeup water at an average

4.2.5 At a minimum of a monthly basis, the contractor shall sample for the following and provide the range their treatment program will maintain: Please indicate range you plan to maintain.

4.2.5.1 Hardness, calcium (ppm as CaCO3)

4.2.5.2 Chlorine, total (ppm as Cl2)

4.2.5.3 Conductivity (as mmhos)

4.2.5.4 pH

4.2.5.5 Traced Scale and Corrosion Inhibitor

4.2.5.6 m-alkalinity (ppm)

4.2.5.7 Bacteria Counts (CFU)

4.2.5.8 Minimum amount of water cycles

4.3 The Contractor shall identify the name and location of the CDC Elite laboratory in which they plan to use to analyze the sample for Legionella’s Disease.

5. CLOSED LOOP TESTING:

See Attachment 1 for Facilities with Closed Loop Systems.

5.1 Initial testing and treatments shall be completed within the first 30 days from the Notice-to-proceed and quarterly thereafter for the facilities identified in attachment 1

5.1.1 It’s the intent to have the closed loops sampled three times per year.

5.1.2 It’s the intent is not to contract chemicals based on a lump sum annual amount, but rather to pay for actual chemicals on an “as delivered” basis.

5.2 Unless otherwise agreed upon by the government, the contractor shall develop and submit a schedule to complete sampling and method of how sampling will be performed within 10 days after receipt of the NTP.

5.3 The contractor shall sample all closed loop systems for the following: pH, nitrite, and propylene glycol. Microbiological growth will only be required to be sampled for in the event the PH, Nitrite and/or Propylene Glycol indicates the chances of microbiological activity is in the system.

5.4 All closed loop systems shall be maintained to meet the following parameters:

5.4.1 PH: Maintain a level between 8 to 10.3

5.4.2 Nitrite (steel protection): maintain level 600-1000 PPM (1200 PPM if system is off)

5.4.3 Propylene glycol: maintain a level between 25% to 30%.

5.5 When sampling the closed loops, should the contractor find systems that do not meet the chemical parameters identified in paragraph 2.5, the contractor shall calculate the appropriate amount of chemicals required to bring the system to within the parameters.

5.5.1 Prior to adding chemicals, the contractor shall notify 375th Civil Engineer Squadron (CES) HVAC or Government personnel for approval to add chemicals.

5.5.2 Upon completion of adding chemicals, the contractor shall verify the system meets the parameters as described in paragraph 2.5.

5.5.3 The contractor shall ensure the amount of glycol and/or nitrite is available on the contract prior to requesting government approval to add into the closed loops.

6. CLOSED LOOP CHEMICALS:

6.1 Closed loops treated with propylene glycol:

6.1.1 The contractor shall treat closed loop systems with Inhibited Propylene Glycol

(inhibited with Nitrite only) and/or Nitrite.

6.1.2 Propylene Glycol shall only be inhibited with Nitrite (NO2). Sodium nitrite (Na2NO2) shall not be used.

6.1.2 With government approval, the contractor may treat a closed loop which contains propylene glycol with Nitrite (NO2) only, if conditions warrant such treatment.

6.2 Closed loops treated without glycol:

6.2.1 Contractor shall treat closed loop systems with Nitrite (NO2).

6.2.2 Contractor shall not use Sodium nitrite (Na2NO2).

6.3 The contractor shall minimize the amount of chemicals stored on base to an as needed basis.

6.3.1 All chemicals being brought on to Scott AFB will be tracked and coordinated with the

375 CES/CEIE.

6.3.2 With exception and approval by the government, chemicals shall be applied to the closed loops within 48 hours of delivery to meet the parameters specified in paragraph 2.4.

6.3.3 With exception and approval by the government, the contractor shall not store more than one drum of any one chemical on Scott AFB. The location of the stored container must be coordinated with the government.

6.4 With exception and approval by the government, the contractor shall not store full, partial nor empty containers on base.

6.4.1 Empty containers shall be removed within 24 hours of application and shall properly dispose of containers at an off-base facility at no cost to the government.

6.4.2 Full or partial containers approved to be stored on base shall be in a location approved by the government.

6.5 If applicable, the contractor shall monitor chemical inventory levels in feeder systems, if applicable, for each system and resupply as needed. If applicable, at no time shall chemical feeder levels run empty unless otherwise agreed upon by the government.

6.6 The contractor shall monitor each system closely after applying chemical treatments to ensure strainers are not plugged.

NOTE: If cleanliness of the strainers is in question, the contractor shall notify the appropriate government representative for inspection and corrective actions. The contractor shall NOT be responsible for cleaning strainers.

6.7 Unless otherwise agreed upon by the government, the contractor shall meter/measure the amount of water drained from the system. If/when chemical(s) water is drained from the systems, the Contractor shall be responsible for proper containment. The government shall be responsible for disposal if required.

6.8 It shall be the contractor’s responsibility to provide chemical feed installations, if required. If the contractor determines chemical feeders are required, the contractor shall provide a portable pot feeder or pump when permanent pot feeders are not installed on the existing equipment. See attachment 1, Inventory tab for a complete list of facilities with or without pot feeders.

6.8.1 Attachment 1, Inventory Tab is current at the time of development of this SOW, and additional pot feeders/chemical feed equipment may be added and/or removed by the government throughout this contract period.

6.8.2 If the contractor purposes, and the government agrees, that a new permanent pot feeder is required/desired, the government may request a quote from the contractor to perform this work.

6.8.2.1 This work and payments are outside of the contract and must be executed accordingly.

6.8.2.2 The government may choose to self-perform or seek another contractor for materials and/or installation.

7. CLOSED LOOP COUPON TESTING:

7.1 The Contractor shall provide all labor, tools and equipment necessary to perform coupon rack testing. Please see Attachment 1, Inventory tab for a list of facilities that require coupon testing.

Table 7.1 Color Code Condition

Carbon Steel Copper Alloys Iron Excellent Less than or equal to 0.2 Less than or equal to 0.1 Less than or equal to 0.1

Very Good 0.2 to 0.3 0.10 to 0.15 0.10 to 0.15 Good 0.3 to 0.5 0.15 to 0.20 0.15 to 0.20

Moderate to Fair 0.5 to 0.8 0.2 to 0.3 0.2 to 0.3 Poor 0.8 to 1 0.3 to 0.5 0.3 to 0.5

Building C1010 Mild Carbon Steel CDA110 Copper Alloy

7.2 It’s the intent to have the pipe coupons tested twice per year.

7.2.1 Initial coupons shall be placed within 30 days from the Notice-to-proceed.

7.2.2 Unless otherwise agreed upon by the government, coupons shall be analyzed in the month of March, and again the first full week of September.

7.2.3 Unless otherwise agreed upon by the government, the September analyzed results MUST be submitted before the contract expiration date.

7.3 Unless otherwise agreed upon by the government, coupon condition reports shall be submitted within 10 business days after being analyzed. Reports shall include at a minimum: building #, date, type of system (Chilled or Hot – Copper/Iron/Steel), analyzed results (results are calculated from the weight loss in mils per year), and Color Code Condition. See Table 4.1 above.

7.3.1 In addition to the coupon results report, the contractor shall submit services provided on the Performed Services Tab in Attachment 1.

7.3.2 In the Performed Services tab, please provide the date(s) of service, and the amount of coupon racks sampled for each facility.

7.3.3 This tab will also be used to cross-check and verify in-voicing.

8. CLOSED LOOP PRODUCTS AND PERSONNEL:

8.1 Products: Propylene Glycol and Nitrite

8.1.1 Contractor shall use Industrial Grade Propylene Glycol inhibited with Nitrite (NO2) only.

8.1.1.1 The contractor shall provide applicable Safety Data Sheets and Technical Data Bulletins.

8.1.1.2 The contractor shall blend Industrial Grade Propylene Glycol with Nitrite to maintain Nitrite levels at 600 to 1000 PPM and Glycol level between 25% and 30%.

8.1.1.3 The contractor shall provide the percentage of actives/components and percent of the product proposed to use if not clearly identified on the technical data bulletin.

8.1.1.4 The contractor shall provide how many gallons of their proposed product needed to treat a 1000-gallon chilled water closed loop to obtain 600ppm nitrite.

8.1.2 Contractor shall use Nitrite (NO2) only; not Na2NO2 (Sodium Nitrite).

8.1.2.1 The contractor shall provide applicable Safety Data Sheets and Technical Data Bulletins for Nitrite

8.1.2.2 The contractor shall provide the percentage of actives/components and percent’s’ of the product proposed to use if not clearly identified on the technical data bulletin.

8.1.2.2 The contractor shall provide how many gallons of their proposed product needed to treat a 1000-gallon hot water closed loop to maintain 1000ppm.

8.2 Personnel: Contractor shall provide a list of personnel and their roles pertaining to this contract.

8.2.1 Personnel performing testing shall be a member of the Association of Water Technologies (AWT), or a government approved equivalent. Please provide a copy of the AWT certification, or government approved equivalent for personnel performing the sampling and treatments.

8.2.2 Please provide the most recent safety/HAZCOM training recently completed, and/or any other training they contractor feels may be pertinent to this contract. The government reserves the right to request additional training certificates as needed. Courses in progress at the time of offer may not be considered.

NOTE: Contractor shall provide three attachments. Each attachment shall consist of the following:

Attachment 1 Propylene glycol: name of manufacturer and contact info, SDS’s, Technical Data Bulletin, percentage of actives, or components and percent’s if not clearly identified on the technical data bulletin. How many gallons of their proposed product needed to treat a 1000-gallon chilled water closed loop to obtain 600ppm nitrite and Glycol level of 25%.

Attachment 2 Nitrite: name of manufacturer and contact info, SDS’s, Technical Data Bulletin, percentage of actives, or components and percent’s if not clearly identified on the technical data bulletin. How many gallons of their proposed product needed to treat a 1000-gallon chilled water closed loop to obtain 1000ppm nitrite.

Attachment 3 Personnel: Provide list of personnel who will be performing sampling and treatments.

Provide a copy of their AWT certification, or government approved equivalent. Provide the most recent safety/HAZCOM training completed, and/or any other training the contractor feels may be pertinent to this contract. The government reserves the right to request additional training certificates as needed. Courses in progress at the time of offer may not be considered.

9. GENERAL INFORMATION:

9.1 Unless otherwise agreed upon by the Government, the Contractor shall minimize the amount of chemicals stored on base to an as needed basis. Chemicals shall be delivered as needed to meet the parameters identified in this SOW. The intent is not to contract based on a lump sum annual amount, but rather to pay for actual chemicals on an “as delivered” basis.

9.2 Unless otherwise agreed upon by the Government, the Contractor shall not store full, partial or empty containers on base, and shall properly dispose of empty containers at an off-base facility at no cost to the Government.

9.3 The Contractor shall be responsible for any product lost due to equipment failures at no cost to the Government. The Contractor is responsible to ensure all equipment is calibrated and in good working order.

9.4 The Contractor shall be responsible for installing, maintain, operate, and repair all Contractor supplied materials and equipment. The Contractor shall replace at no cost to the

Government any lost treatment materials due to malfunctioning equipment and/or leaks related to treatment material feed equipment.

9.5 The Contractor shall be responsible to keep the work area clean and free of all debris and clean up to the Government’s satisfaction any area deemed unkempt.

9.6 The Government may inspect and evaluate the Contractor's performance to ensure services are received in accordance with the requirements set forth in this contract. The Contracting Officer or Government Point of Contact (POC) may inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether performance meets the standards contained in this SOW.

9.7 Performance of Service during a Crisis (Declared by the Secretary of Defense or Overseas Combatant Commander). All services to be performed under this contract have been determined to be nonessential for performance during a crisis according to Department of Defense Instruction (DODI) 3020.37 and Air Force implementation thereof, unless otherwise directed by the CO.

10. QUALITY CONTROL INFORMATION:

10.1. Quality Control. The Contractor shall develop and maintain a quality control program to ensure services are performed in accordance with applicable standards and industry standards.

10.2. Quality Assurance. The government representative shall evaluate the contractor's performance by periodic site inspections, receipt of valid complaints from base personnel and compliance with the SOW. The Contractor's performance may be based on test reports and possible independent lab tests from a third party. The government shall inspect and evaluate the contractor's performance to ensure services are received in accordance with the requirements set forth in this contract. The CO or Government personnel shall inspect by validating actual work performance, physically checking the attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether performance meets the standards contained in this SOW. When a performance threshold has not been met or contractor performance has not been accomplished, the Government personnel will initiate and provide the Contracting Officer with a DD Form 2772, Contract Discrepancy Report (CDR), for issuance to the contractor. The contractor shall respond to the CDR in accordance with the instructions provided and return it to the Contracting Officer within 10 calendar days of receipt.

10.3 The contractor shall be responsible for keeping the work area clean and free of all debris.

10.4 Performance of Service during a Crisis (Declared by the Secretary of Defense or Overseas Combatant Commander).

10.5 All services to be performed under this contract have been determined to be nonessential for performance during a crisis according to Department of Defense Instruction (DODI) 3020.37 and Air Force implementation thereof, unless otherwise directed by the CO.

11. GOVERNMENT FURNISHED UTILITIES

The Contractor may have use of Government electrical and water supplies that, in nearly all cases, are available at each site. If the Contractor needs additional utilities, special connectors, etc., the Contractor will need to provide and install these at their own expense.

12. GOVERNMENT FURNISHED EQUIPMENT

Apart from the monitoring equipment, chemical tanks and pumps, there are no other Government furnished equipment provided for this SOW. The Contractor is responsible for all tools, training, supplies, materials, labor, vehicles, etc.

13. ENVIRONMENTAL AND SAFETY CONTROLS

13.1 Environment Management System (EMS) Policy. Scott Air Force Base (AFB) is committed to excellence in all aspects of environmental stewardship activities using the Air Force Environmental Management System (EMS). This commitment and use of EMS applies to all activities, products and services associated with Scott AFB partner units and Contractors.

13.1.2 Contractor’s personnel shall work under this contract in a manner that is consistent with Scott AFB EMS and conforms to all applicable environmental laws, regulations, and policies.

Upon awarding of the contract, the Contractor shall review the Scott AFB, EMS Environmental Policy Letter.

13.2 Waste Management.

13.2.1 The Contractor is responsible for the analysis, characterization and proper handling of waste generated by their operation. If hazardous wastes are generated, the Contractor shall properly contain the waste, and it will be Government’s responsibility to properly dispose.

The Contractor shall anticipate 375 CES/CEI audits to ensure their hazardous waste program is compliant with requirements.

13.2.2 Under no circumstances shall the Contractor remove any waste from Scott Air Force Base without ensuring complete and full compliance with all applicable existing environmental laws and regulations. A.II shipments must be prepared in accordance with Department of Transportation Regulations (40 CFR 172).

13.2.3 The Contractor shall notify 375 CES/CEI of all chemical materials brought on base, to include quantity and the Safety Data Sheets.

13.3 Notification of Environmental Spills.

13.3.1 If the Contractor spills or releases any hazardous substance that contacts or has the potential to contact water, soil, or any drain (sanitary or storm) the Contractor shall call 911 (256- 4911 utilizing telephone on base) then the CO immediately. The Contractor shall be liable for reimbursement of containment and environmental clean-up of the spill or release of such substance.

13.3.2 Spill Response. The Contractor shall be responsible for the clean-up and disposal of all spilled materials. This includes all materials used to contain and absorb the spill. Spilled material must be cleaned up promptly and reported to the CO. If any amount of spilled material contacts or has the potential to contact water, soil, or any drain (sanitary or storm), the Contractor shall call 911 (256-4911 if utilizing telephone on base) immediately. Spills of HAZMAT or hazardous waste shall be managed in accordance with the current 375 CES Wing Integrated Contingency Plan for Oil and Hazardous Substances Spill Prevention and Response for Scott AFB. Disposal of waste generated from spill clean-up shall be the Contractor's responsibility. The Contractor shall be liable for reimbursement of containment and environmental clean-up of the spills.

13.4 Training. The Contractor is responsible to train their employees regarding Environmental and Hazardous Materials Handling. The Contractor is also required to have and maintain Safety Data Sheets for all materials used by the Contractor in accordance with but not and/or regulations limited to federal and state laws.

13.5 Fire Safety. The Contractor shall obtain a burning permit from the Scott AFB Fire Department building 460, (256-5130) prior to welding, burning, or cutting operations each day they anticipate performing this type of work. A.II welding and burning operations necessary for the completion of the OWS shall be accomplished in strict compliance with fire safety and applicable standards. The Contractor shall provide and maintain fire extinguishers in accordance with NFPA standards during all welding and burning operations.

14 SECURITY REQUIREMENTS:

14.1 This contract does not require the need for a contractor issued Common Access Card (CAC) nor will the contractor require access to a Government Information System or network access. This contract also does not require an OPSEC Standing Operating Procedure/Plan or Training. This contract does not require the handling or access of Unclassified/Classified Information.

The contractor shall meet Air Force standards for storing, processing, and handling classified information and systems. Additionally, all resources (e.g. maps, publication/instructions, photos) provided by the government to assist the contractor in the performance of their contract will be surrendered upon termination of employment or the end of the contract performance period. While on the installation, if the contractor observes any of the critical (sensitive) information items listed below, the contractor will not photograph the event/item, post about the event on social media sites, blogs, etc., or discuss the critical information while off the installation. The critical information you may observe is:

-Effects of adversarial activity, should it ever occur -Response times of security, fire, emergency management personnel, etc.

-Implemented antiterrorism/security measures and procedures -Specific number of aircraft and unusual flightline activity -Aircraft information such as tail numbers, etc.

14.2 Contractor Responsibilities. The Contractor will be responsible for the conduct of all employees working their control for this contract. This includes any subcontractors they use to fulfill contract requirements.

14.3 Contractor Consent to Background Checks: The Contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population, nor shall the Contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified by Law Enforcement Agency Data System (LEADS) through the National Crime Information Center. LEADS checks will verify if a person is wanted by local, state, and federal agencies. All Contractor and subcontractor personnel must consent to LEADS background checks. Contractor and subcontractor personnel who do not consent to a LEADS check will be denied access to the installation. Information required to conduct a LEADS check includes full name, driver’s license number, and/or social security number, date of birth of the person entering the installation, and completion of a background check questionnaire. The Contractor shall provide this information using the Scott AFB Form 21, Contractors Consent for Background Check, and shall submit it in conjunction with the Contractor’s request for either base or vehicle passes. Completion of a successful LEADS check does not invalidate the requirement for an escort when Contractor or subcontractor personnel are working within controlled or restricted areas. All identifying credentials will be compliant with the REAL ID Act.

14.4 Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Persons later found to be undocumented, or illegal aliens will be remanded to the proper authorities. The Contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause. Furthermore, nothing in this clause shall excuse the Contractor from proceeding with the contract as required.

14.5 Badges: The Contractor is required to provide identification badges for their employees. All Contractor personnel wear these badges while on duty on the Government site. Badges are required to identify the individual, company name, and be clearly and distinctly marked as Contractor.

Size, color, style, etc. are to be mutually agreed to by Contractor and Government. The Contractor’s identification badge will not be used as an entry requirement for installation entry or into any Government designated controlled or restricted area.

NOTE: All DBIDS cards/passes will be turned into the Dixon Visitor Control Center upon expiration of pass and/or completion of contract.

14.6 Contractor Registration of Vehicles on Scott AFB: All Contractor or Contractor employees’ vehicles used for the performance of this contract shall comply with all local, state, and federal regulations. Additionally, any pass shall be surrendered to Security Forces upon demand to positively identify a person’s need to be on Scott AFB.

14.7 Access to Installation during Force Protection Conditions (FPCONs): Contractors will be assigned a mission essential designation IAW requirements contained in SAFBI 31-101/Installation Security Instruction. Only the installation commander or the unit commander requesting contract support will assign the mission essential designation.

14.8 Property Protection: Property protection for facility where the Contractors’ primary work center is located will be the responsibility of the local facility manager and local Government Security Manager, or their duly authorized representative IAW AFI 31-101, Integrated Defense and command/local directives. The Contractor shall safeguard all Government-owned equipment and materials in his/her possession or use.

14.9 Contractors Working in Controlled or Restricted Areas: The unit requesting contract support will always provide escort (s) for Contractors when within a controlled area. Contractors shall not escort other Contractor employees within controlled or restricted areas. In addition, Contractors shall fulfill, maintain, and comply with all security requirements IAW AFI 31-101, Integrated Defense, and command/local directives.

14.10 Access to Government Facilities with Controlled or Restricted Areas: The Contractor shall comply with security regulations imposed by the installation commander and/or the agency responsible for the project location. Due to specific mission requirements inherent in controlled or restricted areas on Scott AFB, the Government may direct the Contractor to leave the controlled or restricted areas at any given time.

14.11 Access to Government Facilities with Controlled or Restricted Areas for Replacement Contractors. The unit requesting contract support will continuously escort replacement Contractors, not initially possessing the proper clearances and requiring entry to controlled or restricted areas. Replacement Contractors shall submit paperwork within 30 days of being assigned to obtain an approved security clearance or favorable review. Replacement Contractor personnel shall obtain a security clearance prior to working with, or having direct access to, classified material. In addition, replacement Contractor personnel shall obtain a “Favorable review” prior to having access to a Controlled Area. The above information shall be submitted to 375 AMW/IP.

15 NON-PERSONAL SERVICES AND/OR INHERENTLY GOVERNMENTAL

SERVICES

The Government will neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the Contractor feels that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor’s responsibility to notify the PCO immediately. These services shall not be used to perform the work of a policy/decision making or management nature, (e.g., inherently Governmental functions). All decisions relative to programs supported by the Contractor shall be the sole responsibility of the Government.

16 ADMINISTRATION

16.1 The total amount of this order shall be a “not-to-exceed” amount and the services shall not exceed the dollar limitations specified on the contract without prior approval from the Government Contracting Officer. Services provided more than the “not-to-exceed” amount without prior approval from the Contracting Officer are done at the Contractor’s risk and subject to non-payment.

16.2 The Government reserves the right to add additional funds to each CLIN if the situation or conditions warrant such a need.

16.3 The Government reserves the right to purchase urgently required services from another source should the Contractor be unable to provide the services to meet the accelerated delivery requirement.

16.4The Contractor is not required to provide service on weekends or federal holidays, except in emergency situations. Federal holidays are as follows:

New Year's Day - 1 January Martin Luther King Day - 3rd Monday in January President’s Day - 3rd Monday in February Memorial Day - Last Monday in May Juneteenth Day – 20 June Independence Day - 4 July Labor Day -1st Monday in September Columbus Day - 2nd Monday in October Veteran's Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December

If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day post the holiday observance.

16.5 Base Closures: Work scheduled but not accomplished because of base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening the base.

1. DESCRIPTION OF SERVICES
2. COOLING TOWER WATER TESTING:
3. LEGIONELLA TESTING:
4. WATER QUALITY MANAGEMENT PLAN:
5. CLOSED LOOP TESTING:
See Attachment 1 for Facilities with Closed Loop Systems.
6. CLOSED LOOP CHEMICALS:
7. CLOSED LOOP COUPON TESTING:
8. CLOSED LOOP PRODUCTS AND PERSONNEL:
9. GENERAL INFORMATION:
10. QUALITY CONTROL INFORMATION:
11. GOVERNMENT FURNISHED UTILITIES
12. GOVERNMENT FURNISHED EQUIPMENT
13. ENVIRONMENTAL AND SAFETY CONTROLS
14 SECURITY REQUIREMENTS:
NOTE: All DBIDS cards/passes will be turned into the Dixon Visitor Control Center upon expiration of pass and/or completion of contract.