SOW Heat Exchange System.pdf

PDF 178 KB Posted

Attached to
Hot Water Heat Exchanger System
Solicitation number
15B51925Q00000014
Issued by

About this file

This Statement of Work (SOW) details the Federal Bureau of Prisons' requirement to replace existing hot water generators at FCC Pollock in Louisiana with a new Hot Water to Hot Water Plate Heat Exchanger System. The project involves replacing 4 existing Lochinvar Hot Water Generator 504-gallon tanks with 2 Double Wall Stainless Steel Plate Heat Exchangers, each capable of producing a minimum of 38 GPM of domestic hot water, along with associated equipment including a digital control panel, 3-way control valve, and 2 boiler water constant pressure supply pumps.

The SOW specifies that the facilities staff will handle installation according to manufacturer specifications, with a manufacturer representative required for initial startup, testing, and certification. The contractor must provide operation/maintenance manuals and complete a comprehensive testing plan, which includes leak tests, control and safety operation verification, and electrical circuitry testing. Delivery of materials must be coordinated with the institution's Contracting Officer's Representative (COR), with deliveries accepted only between 7:00 a.m. and 2:30 p.m., Monday through Friday, excluding federal holidays. All materials must comply with current industry standards, including Underwriters Laboratories (UL), NEMA 4, and National Electric Code (NEC) requirements.

View the file

Other files

File Type Posted
15B51925Q00000014 Heat Exchanger Bundle.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I. SPECIFICATIONS:

A. INTRODUCTION

STATEMENT OF WORK/SPECIFICATIONS

FCI POLLOCK - 23ZSAR2

Replace FOX HWH-Revised to Upgrade

The Federal Bureau of Prisons (FBOP), FCC Pollock located at 1000 Airbase Road, Pollock, Louisiana intends to make a single award to a responsible entity that will provide all necessary equipment, materials, and incidentals to replace our existing hot water generators with Hot Water to Hot Water Plate Heat Exchanger System. The new units shall provide a a minimum the same water flow and recovery rates as from the 4 Lochinvar Hot Water Generator Units being replaced .

All manufacturers' recommendations will be implemented to achieve performance goals.

The 4 existing tanks in Fox Unit (Fl, F2, F3, F4) are:

(4) Lochinvar Hot Water Generator 504 gallon tanks - Model GVG0504JR-5-6-6956, 150 degree boiler water, 504 GAL storage capacity. Boiler Hot Water Inlet Temp 150 degree 2.5" NPT 114 GPM flow, Boiler Water Outlet 2.5" NPT.

Domestic Cold Water Inlet Size 3" NPT and Outlet 2" NPT. 120 voltage is onsite . Domestic Side Water Pressure is 50-60 psi coming into each Housing Unit.

Required Equipment Description:

2 Each - Double Wall Stainless Steel Plate Heat Exchanger, Hot Water to Hot Water Type Each Plate Heat Exchanger will produce min 38 GPM of Domestic Hot Water heated from 40F to 140F when supplied with 57-114 GPM Boiler Water at 140-160F before control valve . Typical Pressure drops between 3-8 psi. Specifications, Installation Drawings, Operation, Maintenance and Service Manuals must be included.

Digital Control Panel 4.3 HMI Touch Screen with BACnet or Modbus IP Connections with Set Point up to 180F. The controller shall be feed forward temperature sensing. Digital Control Panel power requirement is 120/240 VAC.

Fast Acting 3 Way Control Valve, Standard Listing & Approvals -ANSI/ AHRI 400, ASME All Strainers, Bypass Valves, Closure Valves, Check Valves, Backflow Preventers, Relief Valves, Hose Drains, will be included in plate heat exchanger bids. All Plate Heat Exchanger Systems will be on a compact rack system that can be moved thru a standard size doorway via pallet jack.

2 Each - Boiler Water Constant Pressure Supply Pump, SS Construction Hot Water, Proportional Pressure Control (AUTO), Constant Pressure Control, Flange Type: 2 Bolt Commercial Oval, 3/4hp, 57 GPM @ 25TDH, Variable Speed, Single Phase 208/230 VAC 47-63 Hz

B. SCOPE OF WORK

1. Facilities Staff shall install all Plate Heat Exchange Systems according to the manufacturer specs.

2. Facilities Staff shall make all the Plumbing and Electrical Connections required by the Manufacturer.

3. A Manufacturer Representative will be required for the initial Start Up to Test, Certify and Confirm that all the

New Equipment is installed properly.

4. Facilities Staff Training shall be included during the Start UP and Testing Visit.

C. QUALITY ASSURANCE/INSTALLATION REQUIREMENTS

All materials provided by the contractor/manufacturer shall comply with the most current industry standards, the Underwriters Laboratories (UL), NEMA 4 and the National Electric Code (NEC).

E. TESTING AND ACCEPTANCE

The Contractor shall notify the COR two (2) days prior to the final system testing and certification so that arrangements can be made to have BOP required staff available to observe testing. A complete plan detailing test procedures must be submitted to the Contracting Officer's Representative (COR) in advance for final check out and testing of the complete system, which will include, but not be limited to, leak test results after installation, successful operation of controls and safeties, and operational test after the electrical circu itry is energized. Time of testing and certification is one regular business day.

Training:

Upon completion of the installation, testing, and acceptance by the Government (startup phase), the contractor shall provide operation/maintenance/ service manuals for each piece of equipment system installed . One copy of any required associated ma uals shall also be supplied to the institution.

II. CONTRACTORS CURITY WORKING REGULATIONS

A. Delivery of Materials.

All construction materials/equipment required for work on this project is required to be processed by the Contractor and coordinated with the institution COR for temporary storage.

Should they occur any construction related deliveries which are directly shipped to the contractor can be received between the hours of 7:00 a.m. to 2:30 p.m., Monday through Friday, excluding Federal Holidays. At no point will a Bureau of Prisons (BOP) staff member receive or sign for a delivery. The contractor or his representative must be present to verify and accept the delivery.

Under no circumstances will USP Big Sandy or its staff be responsible for the acceptance of any Contractor or company deliveries. The contractor shall be responsible for providing their own means of loading and unloading contractor material or equipment.

The contractor shall no use the institution entry/driveway for the loading, unloading, or storage of any materials and equipment. The contractor will not impede/block the driveway at any time during or after the work shift.