This is a Statement of Work (SOW) for a helium jacket assembly for a Nb3Sn-coated superconducting cavity, issued by Fermi National Accelerator Laboratory in collaboration with Argonne National Laboratory's Accelerator Development Group. The SOW requires fabrication of one helium vessel assembly with specific technical specifications, including ASME U Stamp certification, 304L stainless steel construction, temperature range of 4K to 396K, and pressure tolerances of 15 PSID external and 40 PSID internal.
The deliverables include a helium jacket assembly with a main vessel, four flanges (two large top/bottom and two side port flanges), and comprehensive documentation in PDF format. The vendor must provide welder qualifications, quality assurance plan, material certifications, as-built drawings, non-conformance documentation, and acceptance test results. The delivery timeline is 26 weeks from order receipt, with payment contingent upon successful delivery and a leak check at 1.0 x 10-9 sccm He/sec, to be completed at either Argonne or Fermilab. The project supports the development of next-generation particle accelerator technology for electron and ion accelerators.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Helium Jacket SOW December 5, 2025
Helium Jacket SOW December 5, 2025
Table of Contents
| Scope of Work | 3 |
| Technical Specifications | 3 |
| Performance Specifications | 3 |
| Required features | 4 |
| Deliverables | 4 |
| Schedule | 4 |
| Payment Schedule | 4 |
| Special Instructions | 5 |
| Protection of Materials and Equipment During Shipment | 5 |
| Quality Assurance Requirements | 5 |
| Revision |
| Date |
| Reason |
| 0 |
| December 5, 2025 |
| Original |
Scope of Work
Fermi National Accelerator Laboratory is working with the Accelerator Development Group in the Physics Division at Argonne National Laboratory to develop transformative particle accelerator technology based on thin film Nb3Sn-coated superconducting cavities for the next generation of electron and ion accelerators. As an early demonstration of this technology in a DOE national user facility, we plan to install a Nb3Sn-coated cavity into ATLAS. The cavity is presently a bare, ‘unjacked’ cavity and requires a helium vessel.
Please quote: (1) one helium vessel assembly:
Technical Specifications Performance Specifications
| Description |
| Specification |
| ASME certification |
| U Stamp |
| Material |
| 304 L stainless steel |
| Temperature range |
| 4 K to 396 K |
| Max. external pressure |
| 15 PSID |
| Max. internal pressure |
| 40 PSID |
| Compressor height |
| 1.5m (max.) |
| Vacuum Leak Test |
| To 1.0 x 10-9 sccm He/sec |
Required features
1. Fabrication per supplied .stp (STEP) file assembly
2. Surface finish on four flange assemblies, 32 finish, suitable for sealing with pure 0.060” Indium wire
3. Four stainless steel blanks (304L), 2X large top/bottom flanges, and 2X cavity port flange Deliverables One (1) helium jacket assembly including:
· (1) main vessel
· (2) large flanges for the top and bottom of the vessel
· (2) flanges for the side (beam) ports
· Documentation in pdf format including Welder Qualifications, Contractor QA plan, material certifications, as-built drawings, completed non-conformance documentation, acceptance test results and a letter certifying that the fabrication was done in accordance with the ASME Boiler and Pressure Vessel Code.
Schedule
Delivery shall occur within a lead time of 26 weeks starting upon receipt of order. Any delays shall be communicated to ANL as soon as they are apparent to vendor.
Payment Schedule
The vendor will be paid within 60 days of delivery and upon a successful leak check at 1.0 x 10-9 sccm He/sec at Argonne or Fermilab.
Special Instructions
1. Documentation should include:
a. Assembly drawings and schematics
b. Factory Acceptance Testing Report as outlined in the Quality Assurance Requirements section of this document.
Protection of Materials and Equipment During Shipment
1. Each system must be packed and crated appropriately for delivery to Argonne.
2. For shipments of multiple systems, each system must be easy to identify and separate without unpacking.
a. Items should be packed according to a packing list in clearly labelled crate(s).
Quality Assurance Requirements
According to the deliverables section above image1.png image10.png