SOW Hangar Doors Inspection.docx
DOCX document 24 KB Posted
- Solicitation number
- 70Z04524-Q-KODI0089
About this file
This document is a Statement of Work (SOW) for a contract to inspect the hangar doors at U.S. Coast Guard Air Station Sitka in Alaska. The scope of work includes troubleshooting and inspecting 4 hangar doors, inspecting the electrical system and drive equipment, providing preventative maintenance, and providing a written inspection report along with quotes for any necessary repairs. The contractor will provide all labor, tools, materials, transportation, equipment, supervision, and personnel to perform the required work. The government will provide safe access, background checks for technicians, and lift equipment if needed. The contractor will be liable for any damages due to negligence. The deliverable is a detailed system report to be provided within 14 days. This SOW is related to a Request for Quotation (RFQ) under Solicitation Number 70Z04524-Q-KODI0089 for the USCG Air Station Sitka annual inspection of hangar and overhead doors. The acquisition is set-aside 100% for small businesses, and award will be made on a firm-fixed-price basis to the lowest technically acceptable offer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQSF-18 Overhead door inspection.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
AIR STATION SITKA
611 AIRPORT ROAD
SITKA, ALASKA 99835
STATEMENT OF WORK FOR THE
HANGER DOORS INSPECTION
AT
USCG AIR STATION
SITKA, ALASKA
SCOPE OF WORK: Contractor shall furnish all labor, tools, materials, transportation, equipment, supervision, and personnel to perform the required inspection, removal, installation, troubleshooting, testing, and provide quote for repairs of the hanger doors at Air Station Sitka facilities. Report all findings along with description of all inspection findings and details.
1. Troubleshoot & Inspect 04 hanger doors.
2. Inspect electrical system (control panel, limit switch function, control station, safety devices, etc.).
3. Inspect drive equipment, cables, sheaves, lifting shaft, side guide rollers, counterweight, overall structural condition, etc.
4. Provide general preventative maintenance (lube, tighten, adjust) to include repairs that can be reasonably performed during inspection.
5. Written inspection report provided upon completion.
6. Provide itemized quotes for any repairs that could not be made during inspection.
Contractor shall provide personnel who have the knowledge, qualifications, and experience to perform the functions outlined in the Statement of Work.
PERFORMANCE STANDARDS: Proper adherence to all safety procedures is required prior, during and after work being performed. The contractor shall furnish all personal protective equipment (PPE) as required.
The contractor shall safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities, and avoid interruptions of Government operations in the performance of services.
Submit background info on all requiring access to site to perform work. To include name, date of birth, & driver’s license information. At least one week prior to start of project.
GOVERNMENT FURNISHED EQUIPMENT: The government will provide the following if deemed necessary.
1. Safe access to all equipment will be provided for your inspector by the USCG Air station Sitka.
2. Background check required for all technicians to access facilities.
3. Air Station will provide Snorkel lift equipment.
DELIVERABLES: 14 days after the inspections are performed the contractor shall provide a detailed system report to U.S. Coast Guard Air Station Sitka via email in PDF format to COR listed in scope.
LIABILITY OF DAMAGES: The contractor shall be liable for all damages to Government equipment and property when such damage is due to fault or negligence of the contractor. The contractor shall be responsible for all damages or injury to persons that occur because of the contractor’s fault or negligence. The contractor shall take proper safety and health precautions to protect the work the workers, the public, and the property of others.
POINTS OF CONTACT.
a. AIRSTA Sitka Public Works Officer (COR):
CWO Critcher, Justin. Justin.D.Critcher@uscg.mil
b. Contracting Officer as listed in award.