SOW Grassy Key Housing Lot Clearing.pdf
PDF 317 KB Posted
- Solicitation number
- 30314PR260000021
About this file
This is a Statement of Work (SOW) for the U.S. Coast Guard Station Marathon regarding the clearing of housing lots located in Grassy Key, Florida.
The contractor must remove overgrowth, trees (including stumps), and shrubs from two designated housing lots at Coast Guard Station Marathon Housing. The contractor shall provide all labor, materials, and equipment necessary to complete the demolition and clean-up work while complying with all applicable local, state, and federal laws. Work must be performed between 8:00 AM and 4:00 PM, Monday through Friday (excluding federal holidays), unless otherwise approved by the Contracting Officer. All staging and laydown areas require prior coordination with the Coast Guard. The contractor is responsible for furnishing detailed assessments of component conditions before work begins and must notify the Contracting Officer's Representative (COR) upon completion. A course of action and timeline for completing repairs must be submitted within two weeks of contract award. The contractor bears full liability for damages to government property or personnel injuries resulting from contractor fault or negligence and must ensure all personnel wear required personal protective equipment and adhere to safety procedures throughout the project. Site visits are recommended and should be scheduled with the Contracting Officer, Facilities Engineer, or their designated representative. The primary point of contact is DC2 Trace Weller at Trace.J.Weller@uscg.mil or (806) 786-9677.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| bailey st.png | PNG image | |
| Gibson st. corner.png | PNG image | |
| vacant lot locations.png | PNG image | |
| Combined_Synopsis_Solicitation__30314PR260000021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
U.S. Coast Guard Station Marathon
1800 Overseas Highway
Marathon, FL 33050
STATEMENT OF WORK FOR:
Grassy Key Housing Lot Clearing
GENERAL REQUIREMENTS
PART 1
GENERAL
1. INTENT: The intent of this project is to remove overgrowth, trees, and shrubs at Coast Guard
Station Marathon Housing located in Grassy Key, FL. The USCG is seeking timely repairs that are best value.
2. SCOPE OF WORK: The Contractor shall provide all labor, materials, and equipment to meet all specifications and inspections:
• Remove overgrowth, trees, (including stump) and shrubs at Coast Guard Station
Marathon Housing located in Grassy Key, FL.
• Comply with all local, state, and federal applicable laws throughout demolition.
• Coordinate all staging and laydown areas with the Coast Guard prior to work starting.
3. QUALIFICATIONS: Contractor shall provide personnel who have the knowledge, qualifications, and working experience to perform the functions outlined in the Performance
Requirements.
4. CONTINUITY OF FACILITIES OPERATION: Contractor shall schedule work to minimize interference with the facility’s normal operations. Perform all on-site work between the hours of
8:00 AM and 4:00 PM, Monday through Friday (federal holidays excluded), unless otherwise approved by the Contracting Officer or Contracting Officer’s designated representative.
5. GOVERNMENT FURNISHED MATERIALS: None
PART 2
PERFORMANCE STANDARDS
1. PERFORMANCE REQUIREMENTS:
A. Contractors shall provide labor, materials and equipment for demo, and clean-up.
B. Remove overgrowth, trees, (including stump) and shrubs.
2. SITE VISIT: Site visits are recommended. All site visits should be scheduled with the
Contracting Officer, Facilities Engineer and/or their designated representative.
3. PERFORMANCE STANDARDS: The COTR or Contracting Officer may inspect, at any time, the progression of work to ensure compliance with the contract. The proper adherence to all safety procedures is required prior, during and after work being performed. The contractor shall furnish all personnel with and require donning of required personal protective equipment
(PPE). The contractor shall safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities, and avoid interruptions of Government operations in the performance of services.
4. DELIVERABLES: Contractor shall provide a detailed assessment of the condition of all components prior to start of work and notify COR upon completion. Notify COR or their representative 24 hours prior to any necessary inspections or completion of contract. Contractor shall include a course of action and timeline necessary to affect repairs within 2 weeks of receiving the award.
5. LIABILITY OF DAMAGES: The contractor shall be liable for all damages to government equipment and property when such damage is due to fault or negligence of the contractor. The contractor shall be responsible for all damage or injury to people that occur as a result of the contractor’s fault or negligence. The contractor shall take proper safety and health precautions to protect the work of the workers, the public, and the property of others.
6. POINTS OF CONTACT:
Primary POC: DC2 Trace Weller
Email: Trace.J.Weller@uscg.mil
Phone: (806) 786-9677
END OF SECTION