FAALC Enhancement Program
GEG
Spokane WA
STATEMENT OF WORK
Spokane, WA
PURPOSE: FAALC Enhancement Program (Beautification).
STATEMENT OF WORK:
The contractor will provide labor, travel, permits/application fees, mobilization costs and tools for technicians to travel to the Spokane, WA - GEG site for the purpose of removal of old carpet, wall base, and adhesive and install new carpet, wall base (material to be determined;
i.e. rubber, vinyl or rubber/vinyl mix), and adhesive on the 1st, 11th, 13th , air traffic control cab floor of the ATCT (air traffic control tower) facility; Contractor will ensure compliance with ADA standards. All work shall be completed by a licensed contractor in the state of Washington and completed in accordance with local, state, federal and industry standard requirements.
Contractor work schedule will have to be approved by local FAA POC (point of contact).
Contractor will provide samples of carpet, wall base, adhesive, and touch up paint to SSC and AT for approval. Reference attached photo and drawings.
COVID Consideration(s): Contractor will follow all facility, local, state, and federal COVID protocols; utilizing entrance and exit point established by local FAA representative. Contractor will be required to create safe work area utilizing barriers and/or materials for separation based upon COVID protocols during execution of enhancement described in this document.
Scope of Work:
a) Furniture Relocation:
i) Relocate and safely store furniture, desks, chairs, cabinets, equipment, and etc. to prevent damage
b) Demolition:
i) Remove all old wall base
ii) Remove all old carpet as indicate on the 1st, 11th, 13th , and air traffic control cab floor (see attached drawings)
iii) Completely remove all old carpet adhesive
c) Remediation:
i) Remove all carpet adhesive
ii) Remove all wall base adhesive
iii) Remove all old carpet transition
d) Install Work:
i) Install new carpet (color and type as indicated by local POC)
ii) Install new wall base (color and type as indicated by local POC)
iii) Install new carpet transition strips
iv) Touch paint as needed; color and type to match as closely to current paint as possible
e) Furniture Replaced:
i) Replace all furniture, desks, chairs, cabinets, equipment, and etc. (confirm location with local
POC)
LOCATION:
ATC Facility Payne Airport 3220 100th St. SW Everett, WA 98204
PERIOD OF PERFORMANCE:
Completion within 30 days from start of project. Any deviation of the period of performance timeline will require the prior approval of the CO (contract officer).
SECURITY REQUIREMENTS:
Approved entrance from facility manager. FAA personnel will escort contractor, sub-contractor, delivery, and vendor personnel while on site; contractor will arrange with FAA POC for delivery schedule and daily work schedule.
SPECIAL REQUIREMENTS:
Contractor will provide portable latrine and sanitation/wash station. Contractor will ensure regular servicing of portable latrine is performed.
The contractor will provide waste removal container and removal from site in accordance it local sanitary rules and regulations.
Local SSC/Stakeholder will contact EOSH representative to determine requirements and/or submittals that must be reviewed and approved prior to implementation. Demolition work will be performed at this site creating dust and debris in the ATC (Air Traffic Control) facility.
https://www.airnav.com/airport/KMGM
SUBMITTALS:
1. Warranty documentation on all newly installed equipment, fixtures, and furnishings.
2. Owner’s manuals for newly installed equipment, fixtures, and furnishings.
3. Disposal receipt will be required.
4. Provide “as installed drawings”.
| Scope of Work: |
| i) Remove all old wall base |