SOW FY22 HVAC Closed Loop Svc Fnl.pdf

PDF 875 KB Posted

Attached to
HVAC Closed Loop Water Test-Treat Federal contract opportunity
Solicitation number
FA440721Q0009
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Closed Loop Water Test-Treat, newest first.
File Type Posted
Questions and Responses Ver 1.pdf PDF
Questions and Responses.pdf PDF
52.204-24.pdf PDF
252.204-7016.pdf PDF
252.204-7017.pdf PDF
WD Rev 18 2015-5075 7-21-2021.pdf PDF
Combo HVAC Close Loop Fnl.pdf PDF
52.204-26.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

HVAC Closed Loop Treatment

Scott AFB, IL

13 May 2021

1. DESCRIPTION OF SERVICES

1.1 The Contractor shall provide all labor, tools and equipment necessary to perform closed loop water/chemical sampling for the Heating, Ventilation and Air Conditioning (HVAC) systems on

129 closed loop systems in various facilities, and coupon rack testing for 24 racks in 13 facilities on Scott AFB, IL. There are 71 hot water closed loop and 58 cold water closed loop systems.

1.2 Without limiting the generality of the foregoing, the Contractor shall be required to conduct chemical sampling and provide reports to verify chemical mixture percentages within the closed loop systems to meet the parameters identified in paragraph 2.4. Initial sampling and treatments shall be completed within the first 60 days from the Notice-to-proceed and quarterly thereafter.

It’s the intent to have the closed loops tested four times per year.

1.3 Without limiting the generality of the foregoing, the Contractor shall be required to conduct pipe coupon corrosion testing and provide reports to evaluate the corrosiveness condition of the carbon steel and copper piping on the systems identified in paragraph 4.1. Initial coupons shall be placed within 30 days from the Notice-to-proceed and tested quarterly thereafter. It’s the intent to have the pipe coupons tested four times per year.

1.4 The contractor shall brief 375th Civil Engineer Squadron (CES) HVAC or Government personnel at the end of each day of services, and provide a written report within ten business days after completing services, and invoice for services within ten days of report submittal to the government.

1.5 It’s the intent to have the closed loops tested four times per year, and the intent is NOT to contract chemicals based on a lump sum annual amount, but rather to pay for actual chemicals on an “as delivered” basis.

1.6 The contractor shall abide by Scott AFB, local, county, state and federal laws under this contract. The Contractor shall use innovative industry/commercial standards/procedures and equipment to minimize the expenditure or time and funds while ensuring the highest of quality work.

2. LOOP TESTING:

2.1 The Contractor shall provide all labor, tools and equipment necessary to perform water/chemical sampling and treatment for the facilities identified in attachment A. Initial testing and treatments shall be completed within the first 60 days from the Notice-to-proceed and quarterly thereafter. It’s the intent to have the closed loops tested four times per year, and the intent is not to contract chemicals based on a lump sum annual amount, but rather to pay for actual chemicals on an “as delivered” basis.

NOTE: All Testing and Reports Must BE Completed and Submitted Prior to Contract

Expiration Date.

2.2 Unless otherwise agreed upon by the government, the contractor shall develop and submit a schedule to complete water/chemical testing and method of how water/chemical sampling will be performed within ten days after receipt of the NTP.

2.3 The contractor shall test all 129 closed loop systems on a quarterly basis for the following;

inhibitor, pH, conductivity, propylene glycol, nitrite levels and microbiological growth.

2.4 All 129 closed loop systems shall be maintained to meet the following parameters:

PH: Maintain a level between 8 to 10.3

Nitrite (steel protection): maintain a level 600-1000 PPM (1200 PPM if system is off)

Propylene glycol: maintain a level between 25% to 30%.

Microbiological Activity: -0- check for the presence of any microbiological activity

2.5 When testing the systems, should the contractor find systems that do not meet the chemical parameters identified in paragraph 2.4, the contractor shall calculate the appropriate amount of chemicals required to bring the system to within the parameters. Prior to adding chemicals, the contractor shall notify 375th Civil Engineer Squadron (CES) HVAC or Government personnel for approval to add chemicals. Upon completion of adding chemicals, the contractor shall retest the system to verify parameter compliance. The intent is not to contract chemicals based on a lump sum annual amount, but rather to pay for actual chemicals on an “as delivered” basis.

NOTE: The government representative shall verify funds are available BEFORE granting approval to add chemicals.

3. CHEMICALS:

3.1 The contractor shall minimize the amount of chemicals stored on base to an as needed basis.

Chemicals shall be delivered as needed to meet the parameters specified in paragraph 2.4. All chemicals being brought on to Scott AFB will be tracked and coordinated with the 375

CES/CEIE.

3.2 The contractor shall not store containers (empty or full) on base, unless otherwise agreed upon by the government, and shall properly dispose of containers at an off base facility at no cost to the government.

3.3 The contractor shall monitor chemical inventory levels in feeder systems, if applicable, for each system and resupply as needed. If applicable, at no time shall chemical feeder levels run empty unless otherwise agreed upon by the government.

3.4 Unless otherwise agreed upon by the government, systems identified by the contractor that do not meet the system parameters, the contractor shall add the calculated amount of chemicals within three business days after obtaining government approval. The contractor shall invoice within 10 days for chemicals provided to the government.

3.5 The contractor shall monitor each system closely after applying chemical treatments to ensure strainers are not plugged.

NOTE: If cleanliness of the strainers are in question, the contractor shall notify the appropriate government representative for inspection and corrective actions. The contractor shall NOT be responsible to clean strainers.

3.6 If/when chemical(s) water is drained from the systems, the Contractor shall be responsible for proper containment. The government shall be responsible for disposal.

3.7 It shall be the contractor’s responsibility to provide chemical feed installations. If required, the contractor shall provide a portable pot feeder or pump when permanent pot feeders are not installed on the existing equipment. See attachment B for a complete list of facilities with or without pot feeders. Attachment B is current at the time of development of this SOW, and, additional pot feeders/chemical feed equipment may be added by the government throughout this contract period.

4. COUPON TESTING:

4.1 The Contractor shall provide all labor, tools and equipment necessary to perform coupon rack testing in the following facilities:

4.1.1 Building 40 AMC HQ (HW)

4.1.2 Building 44 Chiller Plant (CHW)

4.1.3 Building 67 Air Evacuation Squadron (CHW)

4.1.4 Building 433 Hangar 1 (CHW)

4.1.5 Building 433 Hangar 1 (HW)

4.1.6 Building 450 Maintenance (HW)

4.1.7 Building 450 Maintenance (CHW)

4.1.8 Building 470 Maintenance (HW)

4.1.9 Building 470 Maintenance (CHW)

4.1.10 Building 755 Security Forces (HW)

4.1.11 Building 755 Security Forces (CHW)

4.1.12 Building 859 Communications (HW)

4.1.13 Building 859 Communications (HW)

4.1.14 Building 859 Communications (CHW)

4.1.15 Building 861 561 NOS Det 3

4.1.16 Building 861 561 NOS Det 3

4.1.17 Building 1700 AFNIC (CHW)

4.1.18 Building 1700 AFNIC (HW)

4.1.19 Building 1700 AFNIC (HW)

4.1.20 Building 1900 TRANSCOMM (CHW)

4.1.21 Building 1900 TRANSCOMM (HW)

4.1.22 Building 1961 TRANSCOMM (HW)

4.1.23 Building 5160 DISA (CHW)

4.1.24 Building 5160 DISA (HW)

Table 4.1

Color Code Condition

5.2 Corrosion coupons arc strips

of metal that are pre-weighed, attached to non-metallic holders to avoid galvanic effects, and are installed in specially designed coupon racks in the system.

After exposure, the coupons are cleaned and weighed. Corrosion rates are calculated from the weight loss (in mpy / mils per year).

5.3 The contractor shall develop

and submit a schedule to complete capacity verifications and method of how capacities will be calculated within 10 days after receipt of the NTP

5.4 All work shall be

accomplished in accordance with base, state and federal safety and pollution laws and regulations.

5.5 The contractor shall inspect

the coupon rack system for leaks prior to starting any work. The contractor shall notify the 375th Civil Engineer Squadron (CES)

HVAC or COR personnel if leaks are identified prior to the start of any work.

5.6 Upon completion of work, the contractor shall be

responsible to repair any leaks that may occur in the immediate work area of where the coupon testing was taking place to the satisfaction of the government.

6. Service Schedules and

Reports:

6.1 The Contractor shall provide

the 375th Civil Engineer

Carbon Steel Copper Alloys Excellent Less than or equal to 0.2 Less than or equal to 0.1

Very Good 0.2 to 0.3 0.10 to 0.15 Good 0.3 to 0.5 0.15 to 0.20

Moderate to Fair 0.5 to 0.8 0.2 to 0.3 Poor 0.8 to 1 0.3 to 0.5

Building C1010 Mild Carbon Steel CDA110 Copper Alloy

4.2 Personnel performing testing shall be a member of the Association of Water Technologies

(AWT).

4.3 Initial coupons shall be placed within 30 days from the Notice-to-proceed and quarterly thereafter. It’s the intent to have the pipe coupons tested four times per year.

4.4 Unless otherwise agreed upon by the government, coupon condition reports shall be submitted within 10 business days after being analyzed. Reports shall include at a minimum:

building #, date, type of system, analyzed results (results are calculated from the weight loss in mils per year), and Color Code Condition. See table 4.1 above. The contractor shall invoice for services within ten days of report submittal to the government.

5. WATER QUALITY MANAGEMENT PLAN:

5.1 The contractor shall provide a Water Quality Management Plan (WQMP) to describe how they shall fulfill the requirements of sampling and treatment and coupon corrosion analysis of the closed loop systems using innovative industry and commercial standards and procedures to fulfill the requirements IAW this SOW.

5.2 The contractor may provide any information they feel pertinent to the offer, but MUST include the following:

5.2.1 List of personnel and their role of who will be assigned to this contract.

5.2.2 Personnel performing sampling and treatment shall be a member of the Association of Water Technologies (AWT). Please provide certifications/documentation proving this certification.

5.2.3 Personnel certifications/certificates of safety/environmental training completed within the last year applicable to this contract. If training exceeds an annual requirement

(every three years, every five years, etc…), please indicate frequency requirement and provide those certifications/certificates as part of the offer. Please limit offer to the most five pertinent training courses completed. The government reserves the right to request additional training certificates as needed. Courses in progress at the time of offer will not be considered.

5.2.4 The contractor shall provide a list of treatment chemicals they plan to use and it’s purpose along with the chemical Safety Data Sheet.

5.2.5 As part of the overall WQMP, the Contractor shall develop and maintain a quality control program to ensure services are performed in accordance with applicable industry standards and standards outlined within this SOW.

6. QUALITY INFORMATION:

6.1. Quality Control. The Contractor shall develop and maintain a quality control program to ensure services are performed in accordance with applicable standards and industry standards.

6.2. Quality Assurance. The government representative shall evaluate the contractor's performance by periodic site inspections, receipt of valid complaints from base personnel and compliance with the SOW. The Contractor's performance may be based on test reports and possible independent lab tests from a third party. The government shall inspect and evaluate the contractor's performance to ensure services are received in accordance with requirements set forth in this contract. The CO or Government personnel shall inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this SOW. When a performance threshold has not been met or contractor performance has not been accomplished, the Government personnel will initiate and provide the

Contracting Officer a DD Form 2772, Contract Discrepancy Report (CDR), for issuance to the contractor. The contractor shall respond to the CDR in accordance with instructions provided and return it to the Contracting Officer within 10 calendar days of receipt.

6.3 The contractor shall be responsible to keep the work area clean and free of all debris.

6.4 Performance of Service during a Crisis (Declared by the Secretary of Defense or Overseas

Combatant Commander).

All services to be performed under this contract have been determined to be nonessential for performance during a crisis according to Department of Defense Instruction (DODI) 3020.37 and

Air Force implementation thereof, unless otherwise directed by the CO.

7. GOVERNMENT FURNISHED UTILITIES

7.1. The Contractor may have use of government electrical and water supplies that, in nearly all cases, are available at each site. If the Contractor needs additional utilities, special connectors, etc., the Contractor will need to provide these at their own expense.

8. GOVERNMENT FURNISHED EQUIPMENT

8.1. There are no government furnished equipment provided for this SOW. The Contractor is responsible for all tools, training, supplies, materials, labor, vehicles, etc.

9. ENVIRONMENTAL AND SAFETY CONTROLS

9.1. Environment Management System (EMS) Policy. Scott Air Force Base (AFB) is committed to excellence in all aspects of environmental stewardship activities using the Air Force

Environmental Management System (EMS). This commitment and use of EMS applies to all activities, products and services associated with Scott AFB partner units and contractors.

9.2 Contractors personnel shall work under this contract in a manner that is consistent with Scott

AFB EMS and conforms to all applicable environmental laws, regulations and policies. Upon awarding of the contract, the Contractor shall review the Scott AFB, EMS Environmental Policy

Letter.

9.3 Waste Management

9.3.1 The contractor is responsible for the analysis, characterization, proper handling and disposal of regulated waste, including but not limited to hazardous waste generated by their operation. Management shall be in accordance with Title 22 of the Illinois Code of Regulations and the Scott AFB Hazardous Waste Management Plan. If regulated wastes are generated, the contractor shall properly contain the waste and it will be government’s responsibility to properly dispose. The contractor shall anticipate 375 CES/CEI audits to ensure their hazardous waste program is compliant with requirements.

9.3.2 Under no circumstances shall the contractor remove any waste from Scott Air Force Base without ensuring complete and full compliance with all applicable existing environmental laws and regulations. All shipments must be prepared in accordance with Department of

Transportation Regulations (40 CFR 172).

9.3.3 Prior to removing, transporting or disposing of any waste from the base, the contractor shall forward waste manifests, land disposal restrictions, waste profiles, laboratory analyses, and safety data sheets to 375th CES/CEIE to obtain a review, approval, and/or signature as required.

The 375 CES/CEIE shall receive all final manifests signed by the approved disposal facility.

Hazardous waste treatment is not permitted on Scott AFB unless approved and monitored by

375th CES/CEIE.

9.4 Notification of Environmental Spills.

9.4.1 If the contractor spills or releases any hazardous substance that contacts or has the potential to contact water, soil or any drain (sanitary or storm) the contractor shall call 911 (256-4911 utilizing telephone on base) then 375 CES/CEIE immediately. The contractor shall be liable for reimbursement of containment and environmental clean-up of the spill or release of such substance.

9.4.2 Spill Response. The contractor shall be responsible for the clean-up and disposal of all spilled materials. This includes all materials used to contain and absorb the spill. Spilled material must be cleaned-up promptly and reported to 375 CES/CEIE. Spills of HAZMAT or hazardous waste shall be managed in accordance with the current 375 CES Wing Integrated Contingency

Plan for Scott AFB. Disposal of wastes generated from spill clean-up shall be the contractor's responsibility and will follow protocol outlined in Section 9.3.3. The contractor shall be liable for reimbursement of containment and environmental clean-up of the spills.

9.4.3 Training. The contractor is responsible to train their employees regarding Environmental and Hazardous Materials Handling. The contractor is also required to have and maintain Safety

Data Sheets (SDS) for all materials used by the contractor in accordance with federal and state laws. A copy of all SDSs shall be supplied to 375 CES/CEIE prior to field activities.

9.5 Fire Safety. The contractor shall obtain a burning permit from the Scott AFB Fire

Department building 460, (256-5130) prior to welding, burning or cutting operations each day they anticipate performing this type of work. All welding and burning operations necessary for the completion of the OWS shall be accomplished in strict compliance with fire safety and applicable standards. The contractor shall provide and maintain fire extinguishers in accordance with NFPA standards during all welding and burning operations.

10. GENERAL REQUIREMENTS:

Contractor Consent to Background Checks: The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified by Law Enforcement Agency Data

System (LEADS) through the National Crime Information Center. LEADS checks will verify if a person is wanted by local, state, and federal agencies. All contractor and subcontractor personnel must consent to LEADS background checks. Contractor and subcontractor personnel who do not consent to an LEADS check will be denied access to the installation. Information required to conduct an LEADS check includes: full name, driver’s license number, and/or social security number, date of birth of the person entering the installation, and completion of a background check questionnaire. The contractor shall provide this information using the Scott

AFB Form 21, Contractors Consent for Background Check, and shall submit it in conjunction with the contractor’s request for either base or vehicle passes. Completion of a successful

LEADS check does not invalidate the requirement for an escort when contractor or subcontractor personnel are working within controlled or restricted areas. All identifying credentials will be compliant with the REAL ID Act.

Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Persons later found to be undocumented or illegal aliens will be remanded to the proper authorities. The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause. Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required.

Badges: The contractor is required to provide identification badges for their employees. All contractor personnel shall wear these badges while on duty on the government site. Badges are required to identify the individual, company name, and be clearly and distinctly marked as contractor. Size, color, style, etc. are to be mutually agreed to by contractor and government.

The contractor’s identification badge will not be used as an entry requirement for installation entry or into any government designated controlled or restricted area. All DBIDS cards/passes will be turned in to the Dixon Visitor Control Center upon expiration of pass and/or completion of contract.

Contractor Registration of Vehicles on Scott AFB: All contractor or contractor employees’ vehicles used for the performance of this contract shall comply with all local, state and federal regulations. Additionally any pass shall be surrendered to Security Forces upon demand to positively identify a person’s need to be on Scott AFB.

Access to Installation during Force Protection Conditions (FPCONs):

Contractors will be assigned a mission essential designation IAW requirements contained in

SAFBI 31-101/Installation Security Instruction. Only the installation commander or the unit commander requesting contract support will assign the mission essential designation.

AT Level 1 training for Contractors: AFI 10-245-O published on 07 Dec 20 states 100% of contractors will complete AT Level I (Antiterrorism Awareness). This is also a federal law under

48 CFR § 252.204-7004 that all contractors that work on federally funded projects will have this training. The new AFI states:

Contracting Squadron (CONS) Commanders:

(1) Coordinate performance work statement (PWS)/statement of work (SOW) and modifications with the installation Antiterrorism Officer/Antiterrorism Program Manager (ATO/ATPM) to ensure AT considerations and measures are included in all applicable contracts and that all AT standards are in compliance. (T-1).

(2) Coordinate with the installation ATO/ATPM to ensure Level I - AT Awareness Training is completed by all contractors within 30 days of requiring access, and annually thereafter. (T-3).

Coordination for training should be done by the requiring unit after contract award.

(3) Work with ATO/ATPM to coordinate AT-specific contracting measures for inclusion in the installation‘s AT Plan. (T-2).

(4) Coordinate necessary background investigations for contractors with the installation information protection office and work with the ATO/ATPM to develop mitigation measures that limit the potential for terrorist and insider threats posed by contractors while on the installation.

(T-1)

(5) Incorporate required AT clauses, related supplements, and local AT measures as part of requirements for DoD contracts, as described in Standard 18. (T-0)

Property Protection: Property protection for facility where the contractors’ primary work center is located will be the responsibility of the local facility manager and local Government

Security Manager, or their duly authorized representative IAW AFI 31-101, Integrated Defense and command/local directives. The contractor shall safeguard all government-owned equipment and materials in his/her possession or use.

Safeguarding Classified or Unclassified Information: The contractor shall meet Air Force standards for storing, processing, and handling classified information and systems. Additionally, all resources (e.g. maps, publication/instructions, photos) provided by the government to assist the contractor in the performance of their contract will be surrendered upon termination of employment or the end of the contract performance period.

Non-Disclosure Agreements: To safeguard information, the contractor shall enter into non-disclosure agreements with the responsible local security manager.

Privacy Act: Work on this project requires that personnel have access to Privacy Information.

Personnel shall adhere to the Privacy Act, Title 5 of the U.S. Code, Section 552a and applicable agency rules and regulations.

Contractors Working in Controlled or Restricted Areas

The unit requesting contract support will provide escort (s) for contractors’ at all times when within a controlled area. Contractors shall not escort other contractor employees within controlled or restricted areas. In addition, contractors shall fulfill, maintain, and comply with all security requirements IAW AFI 31-101, Integrated Defense, and command/local directives.

Access to Government Facilities with Controlled or Restricted Areas The contractor shall comply with security regulations imposed by the installation commander and/or the agency responsible for the project location. Due to specific mission requirements inherent in the nature of controlled or restricted areas on Scott AFB, the government may direct the contractor to leave the controlled or restricted areas at any given time.

Contractors Responsibilities while Working within Controlled or Restricted Areas

Only contractor personnel with proper authority and qualifications shall enter a controlled or restricted area. Certain facilities require the issuance of an AF Form 1199CD. The government, at any time, may revoke the AF Form 1199CD. The procedures for the issuance of an AF Form

1199CD are contained in SABFI 31-1 Integrated Defense/Antiterrorism Plan. Contractors shall not escort other contractor employees within controlled or restricted areas. Upon completion of the contract, all 1199CDs will be turned into the sponsor and in turn delivered to 375th SFS/S5B, Line Badges. In addition, contractors shall fulfill, maintain, and comply with all security requirements contained in SABFI 31-1 Integrated Defense / Antiterrorism Plan.

Access to Government Facilities with Controlled or Restricted Areas for Replacement

Contractors

The unit requesting contract support will continuously escort replacement contractors, not initially possessing the proper clearances and requiring entry to controlled or restricted areas.

Replacement contractors shall submit paperwork within 30 days of being assigned to obtain an approved security clearance or favorable review. Replacement contractor personnel shall obtain a security clearance prior to working with, or having direct access to, classified material. In addition, replacement contractor personnel shall obtain a “Favorable review” prior to having access to a Controlled Area. The above information shall be submitted to 375 AMW/IP.

11. NON-PERSONAL SERVICES AND/OR INHERENTLY

GOVERNMENTAL SERVICES:

11.1 The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor feels that any actions constitute, or are perceived to constitute personal services, it shall be the contractor’s responsibility to notify the PCO immediately. These services shall not be used to perform work of a policy/decision making or management nature, (e.g., inherently governmental functions). All decisions relative to programs supported by the contractor shall be the sole responsibility of the Government.

12. ADMINISTRATION

12.1 The total amount of this order shall be a “not-to-exceed” amount and the services shall not exceed the dollar limitations specified on the contract without prior approval from the

Government Contracting Officer. Services provided in excess of the “not-to-exceed” amount without prior approval from the Contracting Officer are done at the contractor’s risk and subject to non-payment. The government reserves the right to add additional funds to each CLIN if the situation or conditions warrant such a need.

12.2 The Government reserves the right to purchase urgently required services from another source should the contractor be unable to provide the services to meet the accelerated delivery requirement.

12.3 The contractor is not required to provide service on weekends or federal holidays, except in emergency situations. Federal holidays are as follows:

New Year's Day - 1 January

Martin Luther King Day - 3rd Monday in January

President’s Day - 3rd Monday in February

Memorial Day - Last Monday in May

Independence Day - 4 July

Labor Day -1st Monday in September

Columbus Day - 2nd Monday in October

Veteran's Day - 11 November

Thanksgiving Day - 4th Thursday in November

Christmas Day - 25 December

Attachment A, Loop Sampling/Testing: Each building loop, hot and cold, identified as

“Required” shall be tested on a quarterly basis, four times over the contract period.

Building # Building

Hot Water Testing Chilled Water Testing

3 375 Wing HQ Required Required

4 18TH Air force Required Required

5 Telephone Exchange

Required

N/A (44 Loop)

6 375 FSS Required N/A (44 Loop)

7 Area Defense Required N/A (44 Loop)

10 MPF Required N/A (44 Loop)

40 AMC HQ Required N/A (44 Loop)

43 OSI Required N/A (44 Loop)

44 Chiller Plant N/A Required

50 375CONS Required N/A

54 375FSS MARKETING

67 375 AES Required Required

150 Essex House Required Required

352 PMEL Required Required

382 N ALS North Required N/A

382 S ALS South Required Required

433 Hangar East Required Required

433 Hangar West Required Required

450 932 AMXS Required Required

460 Fire Station #1 Required Required

470 932 OG Required Required

506 Life Support Required Required

528 375 CES Required Required

531 Environmental Required Required

700 E 375FSS Required Required

700 W 375AMW/PA Required Required

744 375 LRS FUELS Required Required

750 375CS Required Required

755 SFS Required Required

859 375CG Required Required

861 561 NOS Det 3 Required Required

864 AMC Required Required

868 AMC Required Required

870 AMC Required N/A

1192 GOLF COURSE Required Required

1400 375 MSG Required N/A

1515 Logistics Required Required

1521 OWS Required Required

1533 437/126 SCOS Required N/A

1534 Contract Sales Required Required

1575 COM FARM N/A Required

1620 Chapel #1 Required Required

1650 Education Ctr Required Required

1670 Base Theater Required Required

1700 AFNIC Required Required

1800 Dinning Facility Required Required

1805 CDC Required Required

1807 CDC Required Required

1812 Billeting Required Required

1820 Belleville Dorm Required Required

1830 Mascoutah Dorm Required Required

1850 Shiloh Hall Required Required

1900 U.S. TRANSCOM Required Required

1900 Plate Exchanger Loop Required Required

1906 Huyser House Required Required

1907 GLOBAL REACH Required Required

1930 Pronto Pizza Required Required

1934E Bowling Center Required Required

1934W Bowling Center N/A Required

1940 Library Required Required

1948 932 MDG Required N/A

1961 US TRANSCOM Required Required

1987 James GYM Required Required

1987 Racket Ball Required Required

1989 Art & Craft Required Required

3189 US TRANSCOM Required Required

3650 932 FSS Required Required

3651 932 MDG Required N/A

3689 RAP CON Required N/A

3900 Tower Required Required

4001 375 LRS Required Required

4010 Ware-House Required N/A

4780 Youth CTR Required N/A

5160 DISA Required Required

Attachment B, Pot Feeder Inventory: Each building below identified with YES has a pot feeder at the time of the development of this SOW. Each building below identified with NO does not have a pot feeder. Each building below identified with N/A does not require line capacity verification nor testing.

NOTE: This list may change as we are trying to add pot feeders to facilities by in-house work, or through on-going contracted projects.

Building # Building

Hot Water Loop Pot Feeder

Chilled Water Loop Pot Feeder

3 375 Wing HQ YES NO

4 18TH Air Force YES YES

5 Telephone Exchange NO N/A

6 375 FSS NO N/A

7 Area Defense NO N/A

10 MPF YES N/A

40 AMC YES YES

43 OSI NO N/A

44 Chiller Plant N/A NO

50 375CONS NO N/A

54 375FSS MARKETING NO NO

67 375 AES YES YES

150 Essex House YES NO

352 PMEL NO NO

382 N ALS North YES NO

382 S ALS South NO NO

433 Hangar East YES NO

433 Hangar West YES YES

450 932 AMXS YES YES

460 Fire Station #1 NO NO

470 932 OG YES YES

506 Life Support NO NO

528 375 CES NO YES

531 Environmental NO NO

700 E 375FSS NO NO

700 W 375AMW/PA NO NO

744 375 LRS FUELS NO NO

750 375CS YES NO

755 SFS YES YES

859 375CG YES YES

861 561 NOS Det 3 YES YES

864 AMC YES NO

868 AMC YES NO

870 AMC NO N/A

1192 GOLF COURSE NO NO

1400 375 MSG YES N/A

1515 Logistics YES NO

1521 OWS NO NO

1533 437/126 SCOS NO N/A

1534 Contract Sales NO YES

1575 COM FARM N/A NO

1620 Chapel #1 YES YES

1650 Education Ctr YES YES

1670 Base Theater YES N/A

1700 AFNIC NO NO

1800 Dinning Facility NO NO

1805 CDC YES NO

1807 CDC YES YES

1812 Billeting YES YES

1820 Belleville Dorm YES YES

1830 Mascoutah Dorm YES YES

1850 Shiloh Hall YES YES

1900 Plate Exchanger Loop NO NO

1900 U.S. TRANSCOM YES YES

1906 Huyser House YES YES

1907 GLOBAL REACH NO NO

1930 Pronto Pizza NO NO

1934E Bowling Center NO NO

1934W Bowling Center NO NO

1940 Library YES NO

1948 932 MDG NO NO

1961 US TRANSCOM YES NO

1987 Racket Ball NO NO

1987 James GYM NO NO

1989 Art & Craft NO NO

3189 US TRANSCOM NO YES

3650 932 FSS YES YES

3651 932 MDG YES N/A

3689 RAP CON NO N/A

3900 Tower YES YES

4001 375 LRS YES YES

4010 Ware-House NO N/A

4780 Youth CTR YES YES

5160 DISA YES YES

File details come from the government source that posted it. Updated .