This document is a Statement of Work (SOW) for a fuel tank dialysis cleaning service at U.S. Coast Guard Sector Humboldt Bay. The SOW requires the contractor to provide all personnel, equipment, transportation, tools, materials, supervision, and other items and services necessary to perform fuel tank dialysis cleaning for two 10,000-gallon Jet A fuel tanks, including proper handling and disposal of contaminated fuel/waste product.
The key tasks include setting up a safety perimeter, evacuating residual fuel, preparing the tanks for confined space entry, replacing fuel filters, and performing full tank inspections. The contractor must complete all work, deliverables, and outcomes within 45 calendar days after notice to proceed. The government will provide basic facilities and utilities, while the contractor must furnish all other necessary items and services. The SOW also outlines requirements for contractor personnel, safety, and invoicing procedures.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
U.S. COAST GUARD
SECTOR HUMBOLDT BAY
Fuel Tank Dialysis Cleaning Service for CG Sector Humboldt Bay
SECTION 1 – GENERAL INFORMATION
1.1 BACKGROUND
Tank Dialysis Cleaning and Inspection Service for (2) 10,000-gallon AST Jet A fuel tanks located at
USCG Sector Humboldt Bay.
1.2 SCOPE
The Contractor must provide all personnel, equipment, transportation, tools, materials, supervision, and other items and services necessary to perform fuel tank dialysis cleaning for two 10,000-gallon Jet A fuel tanks, to include proper handling and disposal of contaminated fuel/waste product in accordance with
OSHA and EPA regulations.
1.2.1 Primary Point of Contact/Technical Representative:
Name: Jason Turner
Phone: 937-999-8584
E-mail: Jason.D.Turner@uscg.mil
1.2.2 Alternate Point of Contact
Name: CWO Kurtis Collins
Phone: 707-839-6163
E-mail: Kurtis.J.Collins@uscg.mil
SECTION 2 – SPECIFIC REQUIREMENTS/TASKS
2.1 GENERAL
The Contractor must provide all personnel, equipment, transportation, tools, materials, supervision, and other items and services necessary to perform fuel tank dialysis cleaning for two 10,000-gallon Jet A fuel tanks, to include proper handling and disposal of contaminated fuel/waste product in accordance with
OSHA and EPA regulations.
2.2 TASKS
• Contractor shall perform fuel tank cleaning service for two fuel tanks with the following specifications:
o Capacity: 10,000 gallons o Design: horizontal, Circular, UL 2085 o AST Category: Category 1 o Construction: double wall, coated steel, concrete filled secondary
• Contractor tasks shall include:
o Setting up safety perimeter around job site o Evacuating residual fuel o Preparing tanks for confined space entry and issuing all required permitting o Replacing fuel filters o Full tank inspections for both tanks
• Contractor shall perform a final inspection with fuel samples taken prior to and after tank cleaning.
• Contractor shall provide a detailed, photo-documented, after service report and provide copies to the unit.
• Contractor shall complete all work, deliverables and outcomes within 45 calendar days after notice to proceed is given by the Government.
2.3 CONTROL AND DISPOSAL OF WASTES
All wastes and demolished materials become the Contractor’s property and shall be removed from the job site daily in accordance with all local, state, and federal environmental regulations.
2.4 SAFETY
During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for
Construction and the Washington Industrial Safety and Health Administration (WISHA) regulations.
2.4.1 Unforeseen Hazardous Materials/Environmental Discharge:
If hazardous material is found during operations, stop that portion of work and notify both parties immediately at their listed point of contact. Within 14 calendar days, the Government will determine fiscal indemnity without liability. If the material is not hazardous or poses no danger, the government will direct the cleanup and proceed without change. If the material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a contract modification.
2.5 OPERATIONS AND STORAGE FACILITITES
The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the onsite representative with the concurrence of the Contracting
Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor’s performance.
SECTION 3 – CONTRACTOR PERSONNEL
3.1 QUALIFIED PRESONNEL
3.1.1 Contract Manager
The Contractor shall provide a Project Manager who shall be responsible for all Contractor work performed under this SOW. The Project Manager shall be a single point of contact for the Contracting
Officer and the Technical representative. The name of the Project Manager, and the name(s) of any alternate(s) who shall act for the Contractor in the absence of the Project Manager, shall be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate shall have full authority to act for the Contractor on all matters relating to work performed under this contract. The
Project Manager and all designated alternates shall be able to read, write, speak and understand English.
Additionally, the Contractor shall not replace the Project Manager without prior approval from the
Contracting Officer.
3.1.2 Contractor Employees
The contractor must not employ persons for work on this contract if such employee is considered by the
Contracting Officer to be a potential threat to the health, safety, and security, general well –being, or operational mission of the installation and its population. Contractor personnel must present a neat appearance and be easily recognized as contractor employees. The contractor must not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. Additionally, the contractor must not employ any person who is an employee of the U.S. Coast
Guard unless such person seeks and receives approval according to U.S. Coast Guard regulations.
3.2 CONTINUITY OF SUPPORT
The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.
3.3 EMPLOYEE IDENTIFICATION
Contractor employees visiting Government facilities shall wear an identification badge that, at a minimum, displays the Contractor name, the employee’s photo, and name. Visiting Contractor employees shall comply with all Government escort rules and requirements. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.
3.4 EMPLOYEE CONDUCT
Contractor’s employees shall comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees present a professional appearance at all times and that their conduct shall not reflect discredit on the United States or the Department of
Homeland Security. The Project Manager shall ensure Contractor employees understand and abide by
Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.5 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the technical representative), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
SECTION 4 – OTHER APPLICABLE CONDITIONS
4.1 PLACE OF PERFORMANCE
USCG Sector Humboldt Bay
1001 Lycoming Ave
McKinleyville, CA
4.2 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0800 and 1600 PST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.
4.2.1 Special event, or adjusted work hours: If circumstances should arise wherein the contractor desires a different work schedule as required in section 4.3 above, the contractor must request same in writing.
Submit written request to the government Point of Contact a minimum of 24 hours before the requested adjusted work schedule.
4.3 APPLICABLE PUBLICATIONS
Publications and forms that apply to the SOW are listed below. The publications have been designated as mandatory. The contractor must be guided by those publications to the extent necessary to accomplish requirements in this SOW.
4.3.1 Mandatory Publications
Applicable OSHA Safety and Health Standards and applicable EPA regulations.
4.4 INVOICING
Invoices will be submitted through the Invoice Processing Platform (IPP) at https://www.ipp.gov/. IPP is a secure web-based electronic invoicing system provided by the U.S. Department of the Treasury’s
Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis (FRSTL). IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency. Action to take instructions will be provided upon award.
SECTION 5 – GOVERNMENT FURNISHED RESOURCES
The Government will provide basic facilities and utilities for the off-site Contractor to use in performing work under this contract.
SECTION 6 – CONTRACTOR FURNISHED ITEMS AND SERVICES
The Contractor shall furnish all facilities, materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in section 5.