This statement of work outlines requirements for rebuilding fire pumps on three fire apparatus for Yellowstone National Park. The National Park Service Intermountain Region is soliciting bids to rebuild pumps and repair additional components on three fire trucks, a 1993 Pierce Dash and two 1990 Pierce C-8000s. Work includes installing new Waterous impeller shaft assemblies, converting oil primers to oilless systems, upgrading to Pierce electronic pressure governors and Waterous Aquis foam systems, rebuilding or replacing discharge and intake valves, and additional repairs specific to each vehicle as described. The solicitation requests pricing to complete the work either on-site or by delivering the vehicles off-site within 800 miles, and vendors must demonstrate qualifications to maintain fire apparatus.

View the file

Other files for this federal contract opportunity

Other files attached to FIRE APPARATUS PUMP REBUILD for YELLOWSTONE NP, newest first.
File Type Posted
Sol_140P1423Q0088.pdf PDF
Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for Yellowstone Fire Apparatus Pump Rebuild

Description

Yellowstone National Park has three (3) fire apparatus that need pumps rebuilt and additional components repaired or upgraded. All vendors will provide credentials that certify they are qualified to perform maintenance on a fire apparatus.

The three (3) fire apparatus need fire pumps rebuilt, upgrade to a foam injection system, upgrade to an oilless primer, rebuild or replace all discharge and intake valves, and add a Pierce Pressure

Governor.

The three (3) fire apparatus:

Pierce 1993, Dash, Tag Number I-167846, Pierce Number E-8021 (see photos below)

• Pump Manufacturer Waterous

• Pump Model CS

• Pump Serial Number 28076W

• Top mount panel

• Drains o 6 discharge drains o 1 master pump drain o 4 drains on front intake plumbing

• Ball Valves o 8 discharge valves – visible valves are Akron o Tank to Pump o Tank Fill o One (1) 2 ½” intake valve

Pierce 1990, C-8000, Tag Number I-156341, Pierce Number E-5793-1 (identical to I-156340)

• Pump Manufacturer Waterous

• Pump Model CSU

• Pump Serial Number 19764W

• Side mount panel

• Drains o 7 discharge drains o 1 master pump drain o 3 drains on front intake plumbing

• Ball Valves o 9 discharge valves – visible valves are Elkhart o Tank to Pump o Tank Fill o Two (2) 2 ½” intake valves

Pierce 1990, C-8000, Tag Number I-156340, Pierce Number E-5793-2 (see images below)

• Pump Manufacturer Waterous

• Pump Model CSU

• Pump Serial Number 19765W

• Side mount panel

• Drains o 7 discharge drains o 1 master pump drain o 3 drains on front intake plumbing

• Ball Valves o 9 discharge valves – visible valves are Elkhart o Tank to Pump o Tank Fill o Two (2) 2 ½” intake valves

Each apparatus is already equipped with:

• Foam tank and a foam eductor system on all three apparatus

• Oil primer pump on all three apparatus

• Manual throttle (cable) at the pump panel on both C-8000’s

• Electronic throttle control on the Dash

• Waterous Discharge Relief Valve on all three apparatus

Apparatus can be delivered to a facility for the repairs within 800 driving miles of Mammoth Hot

Springs, Yellowstone National Park, WY.

Specifications

A Waterous impeller shaft assembly kit with applicable gasket kit will be utilized for the pump rebuild for each apparatus.

A Waterous primer pump conversion kit to be utilized for the upgrade from an oil primer pump to an oilless primer pump on each apparatus.

Install Pierce Electronic Pressure Governor, that includes electronic throttle control on all three apparatus. See image below. (Equivalencies will be considered)

Waterous Aquis Foam System to be installed on each apparatus. Each apparatus is equipped with a foam tank, currently filled with Class A foam.

All valves on pump will be rebuilt or replaced, whichever is best for cost efficiency, to include but not limited to, all discharge valves, pump to tank valve, and tank to pump valve. Valves are

Akron and Elkhart ball valves for discharges and tank valves. Any additional valves the vendor is aware of can be noted in bid document.

All drain valves will be replaced with Akron quarter turn drain valve. See image below.

(Equivalencies will be considered)

Master Pump Drain Valve will be replaced on all three apparatus. See image below. A quarter turn version would be preferred if available.

All apparatus will be pump tested in accordance with NFPA standards. With all work that will be done to the pump by the vendor, a pass on the pump test is expected. If the pump will not pass the pump test the vendor will need to show that the cause is something outside of the scope of this project.

Patch panels will be installed where openings are left on the panels with the new equipment that is listed to be installed. Patch panels will match the existing materials. The amount needed and size will be determined by the vendor. See photo below.

Individual Apparatus Needs

• 1993 Pierce Dash o Water Level Gauge not working, needs to be repaired or replaced

• Pierce 1990, C-8000, Tag Number I-156340 o Front suction handle, need replacement. Still in possession of the shaft and one u-joint, second u-joint broken, handle is missing. See photo below to see what handle looks like.

Quantities and Estimated Cost

Item Amount Cost Each Labor Cost Total Cost

Waterous Impeller Shaft Kit 3

Waterous Gasket Kit 3

Waterous Primer Pump Valve Conversion Kit 3 Waterous Primer Pump Conversion Kit 3

Pierce Pressure Governor 3

Waterous Aquis Foam System Kit 3

Akron Ball Valve Repair Kit 37

Akron Quarter Turn Drain Valve 33

Master Pump Drain Valve 3

Panel Patches TBD

Pump Testing in accordance with NFPA 3

1993 Pierce Water Tank Gauge 1

Replace front suction handle 1

PHOTO #1 of

DESCRIPTION:

Pierce Pressure Governor

PHOTO #2 of

DESCRIPTION:

Akron Quarter Turn Drain Valve

PHOTO #3 of

DESCRIPTION:

1993 Pierce Dash

PHOTO #4 of

DESCRIPTION:

1993 Pierce Dash

PHOTO #5 of 16

DESCRIPTION:

1993 Pierce Dash

PHOTO #6 of 16

DESCRIPTION:

1993 Pierce Dash

PHOTO #7 of 16

DESCRIPTION:

1993 Pierce Dash Pump Panel

PHOTO #8 of 16

1993 Pierce Dash Driver’s Side Panel

PHOTO #5 of 16

DESCRIPTION:

1993 Pierce Dash Passenger’s Side Panel

PHOTO #6 of 16

DESCRIPTION:

1993 Pierce Dash Passenger’s Side Panel

PHOTO #7 of

DESCRIPTION: 16

1993 Pierce Dash Master Drain

PHOTO #8 of 16

1993 Pierce Dash Front Intake Drain

PHOTO #9 of 16

DESCRIPTION:

1993 Pierce Dash Water Level Gauge

PHOTO #10 of 16

DESCRIPTION:

1990 Pierce, I-156340

PHOTO #11 of 16

DESCRIPTION:

1990 Pierce, I-156340

PHOTO #12 of 16

1990 Pierce, I-156340

PHOTO #13 of 16

DESCRIPTION:

1990 Pierce, I-156340

PHOTO #14 of 16

DESCRIPTION:

1990 Pierce, I-156340, Pump Panel

PHOTO #15 of 16

DESCRIPTION:

1990 Pierce, I-156340, missing front suction handle

PHOTO #16 of 16

DESCRIPTION:

1990 Pierce, I-156341, example of missing handle from I-156341

Description
Specifications
Quantities and Estimated Cost
Project Estimated Cost

File details come from the government source that posted it. Updated .