This statement of work outlines repairs needed for a New York Air National Guard firetruck damaged in an accident. The scope of work includes replacing or repairing over 50 components on the left side of the vehicle, such as the hosewell, pump panel, roll up door, warning lights, and primer/sealant. All repairs must meet original equipment manufacturer specifications and be completed by the delivery date of June 15th to the 106th Logistics Readiness Squadron at 150 Old Riverhead Road in Westhampton Beach, New York. The related federal contract opportunity posted by the Department of the Army New York Army National Guard is solicitation number F9E7CE3137AQ01 for firetruck repairs from the accident described in the statement of work.

View the file

Other files

File Type Posted
COMBO Service Clauses upto bytedance.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW) FOR SUPPLIES

NEW YORK AIR NATIONAL GUARD (NYANG) 106TH LRS/LGRV

DATE: 10 MAY 2023

TITLE: P-22 PUMP TRUCK ACCIDENT REPAIR

1. PURPOSE. Accident Repair. Collision with building. VIN# 1K9AF4289CN058331

2. SCOPE OF WORK. The contractor shall provide all materials and support necessary to meet the required specifications for the repairs from vehicle accident listed below.

3. DELIVERY LOCATION AND DELIVERY DATE. The P-22 shall be picked up & delivered to the 106th, Building 212, located at 150 Old Riverhead rd, Westhampton Beach, NY 11978

4. QUANTITY REQUIRED: 1 EA

5. SPECIFICATIONS REQUIRED. (Provide this level of detail for EACH of the items you are requesting)

5.1. The repairs must meet or exceed the specifications of the original equipment manufacturer.

5.2. All essential repairs to driver side of body to ensure structural integrity.

5.3. The replaced lights must be LED lights.

5.4. The repaired/replaced water system components must be tested for leaks and have no leaks.

5.5. The repairs must be painted & marked to reflect the current.

5.6. The repairs must include but are not limited to the following:

Oper Description

REPL L/S HOSEWELL /STEP

RPR MOUNTING BRACKETS

REPL L/S LOWER PUMP PANEL OVERLAY

REPL AUX SUCTION TRIM RING

REPL L/S FRONT LOWER RUB RAIL

REPL L/S FRONT ROLL UP DOOR COMPLETE

REPL L/S FRONT COMPARTMENT STAINLESS SILL PLATE

REPL L/S CORNER REFLECTOR

R&I 120 OUTLETS

R&I HYDROGEN WRENCH BRK

R&I SCENELIGHT

R&I 3 ROLL OUT TRAY SHELVES

REPL L/S FRONT COMPARTMENT FLOOR AND SILL

REFN CUSTOM SPECIAL PAINT IN COMPARTMENT

RPR L/S FRONT CORNER POST

REPL ZICO WHEEL CHOCK HOLDER

RPR L/S CENTER SECTION OVER WHEEL WELL

RPR TIME ON INNER SUPPORT

R&I CENTER DOOR

R&I CENTER DOOR SILL

R&I 2 SCBA DOORS

R&I FUEL FILL

REPL RIM L/S REAR

REPL MT. & BAL

SUBL SERVICE CALL TO SWITCH WHEEL & TIRE

R&I L/S CENTER WARNING LIGHT

REPL L/S REAR WHEEL WELL

REPL L/S REAR WHEEL WELL RUBBER

REPL L/S REAR INNER WHEEL WELL

REPL L/S LOWER WARNING LIGHT

RPR L/S LOWER MARKER AND WARNING LIGHT BRACKET

REPL INTAKE SCREEN

REPL SUCTION ELBOW

REPL SUCTION ELBOW GASKET

REPL INTAKE DUEL VALVE

RPR WIRING TIME

REPL MIS. HARDWARE

REPL CORROSION PROTECTIVE PRIMER

REPL SEAM SEALER/CAULKING

END