SOW FIRETRUCK ACCIDENT.pdf
PDF 173 KB Posted
- Attached to
- Fire Truck Repairs from accident
- Solicitation number
- F9E7CE3137AQ01
About this file
This statement of work outlines repairs needed for a New York Air National Guard firetruck damaged in an accident. The scope of work includes replacing or repairing over 50 components on the left side of the vehicle, such as the hosewell, pump panel, roll up door, warning lights, and primer/sealant. All repairs must meet original equipment manufacturer specifications and be completed by the delivery date of June 15th to the 106th Logistics Readiness Squadron at 150 Old Riverhead Road in Westhampton Beach, New York. The related federal contract opportunity posted by the Department of the Army New York Army National Guard is solicitation number F9E7CE3137AQ01 for firetruck repairs from the accident described in the statement of work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBO Service Clauses upto bytedance.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) FOR SUPPLIES
NEW YORK AIR NATIONAL GUARD (NYANG) 106TH LRS/LGRV
DATE: 10 MAY 2023
TITLE: P-22 PUMP TRUCK ACCIDENT REPAIR
1. PURPOSE. Accident Repair. Collision with building. VIN# 1K9AF4289CN058331
2. SCOPE OF WORK. The contractor shall provide all materials and support necessary to meet the required specifications for the repairs from vehicle accident listed below.
3. DELIVERY LOCATION AND DELIVERY DATE. The P-22 shall be picked up & delivered to the 106th, Building 212, located at 150 Old Riverhead rd, Westhampton Beach, NY 11978
4. QUANTITY REQUIRED: 1 EA
5. SPECIFICATIONS REQUIRED. (Provide this level of detail for EACH of the items you are requesting)
5.1. The repairs must meet or exceed the specifications of the original equipment manufacturer.
5.2. All essential repairs to driver side of body to ensure structural integrity.
5.3. The replaced lights must be LED lights.
5.4. The repaired/replaced water system components must be tested for leaks and have no leaks.
5.5. The repairs must be painted & marked to reflect the current.
5.6. The repairs must include but are not limited to the following:
Oper Description
REPL L/S HOSEWELL /STEP
RPR MOUNTING BRACKETS
REPL L/S LOWER PUMP PANEL OVERLAY
REPL AUX SUCTION TRIM RING
REPL L/S FRONT LOWER RUB RAIL
REPL L/S FRONT ROLL UP DOOR COMPLETE
REPL L/S FRONT COMPARTMENT STAINLESS SILL PLATE
REPL L/S CORNER REFLECTOR
R&I 120 OUTLETS
R&I HYDROGEN WRENCH BRK
R&I SCENELIGHT
R&I 3 ROLL OUT TRAY SHELVES
REPL L/S FRONT COMPARTMENT FLOOR AND SILL
REFN CUSTOM SPECIAL PAINT IN COMPARTMENT
RPR L/S FRONT CORNER POST
REPL ZICO WHEEL CHOCK HOLDER
RPR L/S CENTER SECTION OVER WHEEL WELL
RPR TIME ON INNER SUPPORT
R&I CENTER DOOR
R&I CENTER DOOR SILL
R&I 2 SCBA DOORS
R&I FUEL FILL
REPL RIM L/S REAR
REPL MT. & BAL
SUBL SERVICE CALL TO SWITCH WHEEL & TIRE
R&I L/S CENTER WARNING LIGHT
REPL L/S REAR WHEEL WELL
REPL L/S REAR WHEEL WELL RUBBER
REPL L/S REAR INNER WHEEL WELL
REPL L/S LOWER WARNING LIGHT
RPR L/S LOWER MARKER AND WARNING LIGHT BRACKET
REPL INTAKE SCREEN
REPL SUCTION ELBOW
REPL SUCTION ELBOW GASKET
REPL INTAKE DUEL VALVE
RPR WIRING TIME
REPL MIS. HARDWARE
REPL CORROSION PROTECTIVE PRIMER
REPL SEAM SEALER/CAULKING
END
File details come from the government source that posted it. Updated .