SOW_Fire_Billboards.docx
DOCX document 26 KB Posted
- Attached to
- FIRE PREVENTION BILLBOARDS 2021 Federal contract opportunity
- Solicitation number
- 140L3921Q0063
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3921Q0063_Amd_0003.pdf | ||
| Questions_and_Answers_0002.docx | DOCX document | |
| New_Bid_Schedule_all_Years_0002.pdf | ||
| Sol_140L3921Q0063_Amd_0002.pdf | ||
| DOL_WD_Douglas_and_Lyon_COs_NV.pdf | ||
| Sol_140L3921Q0063.pdf | ||
| DOL_WD_Story_and_Washoe_COs_NV.pdf | ||
| DOL_WD_Clark_CO_NV.pdf | ||
| Bid_Schedule_Fillable_all_Years.pdf | ||
| DOL_WD_Carson_City_NV.pdf | ||
| DOL_WD_Ny_CO_NV.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: Fire & Aviation Fire Prevention Billboards Administration: BLM Nevada State Office Location: Nevada State Statement of Work:
In concurrence with Secretarial Order 3336 and the National Cohesive Strategy, BLM Nevada has identified the need for wildfire prevention ad campaign messages to be posted on full-sized billboards throughout the greater area of Reno, Carson City and southern Nevada. The rationale behind this sign plan assures that the signs will be placed in areas highly visible to the public following the main arterial routes. This Statement of work is for 7 full-sized static and 2 digital billboards with the opportunity to rotate between 5-10 different messages. Graphic design and existing graphic re-sizing, vinyl production, installation fees and the option to change graphics (digital only) must be included in the quoted costs.
Rationale:
The rationale behind this sign plan assures that the signs will be placed in close proximity to specific areas identified by Nevada State Office as high-risk; having the potential for extreme and damaging wildfire behavior to grazing allotments, Sage Grouse LEKs, utility infrastructure and critical winter range for numerous species native to Nevada. Other criteria used to determine locations were that the messaging needed to be highly visible to the public following the main arterial routes.
Period of Performance:
Base Year: 16 continuous weeks starting 7/1/2021
| Option Year 1: | 26 continuous weeks starting 6/1/2022 |
| Option Year 2: | 26 continuous weeks starting 6/1/2023 |
| Option Year 3: | 26 continuous weeks starting 6/1/2024 |
| Option Year 4: | 26 continuous weeks starting 6/1/2025 |
Desired Locations
Billboard Size Specifications – 13-17 feet tall by 40-50 feet wide.
1. Location: Highway 395/I580 from Bordertown to Gardnerville
2. Location: I-80 from West Reno to Fernley
3. Location: Highway 50 from Carson City to Fallon
4. Hwy 160 near Pahrump; facing Northbound
5. Hwy 160 near Pahrump; facing Southbound
6. Location: I-15; 1 billboard facing Westbound between Las Vegas and the Utah border
7. Location: I-15; 1 billboard facing Eastbound between Las Vegas and the Utah border
8. Location: Digital billboard in Reno
9. Location: Digital billboard in Carson City
File details come from the government source that posted it. Updated .