SOW_Fire_Billboards.docx

DOCX document 26 KB Posted

Attached to
FIRE PREVENTION BILLBOARDS 2021 Federal contract opportunity
Solicitation number
140L3921Q0063
Issued by
Department of the Interior Bureau of Land Management Nevada Region

View the file

Other files for this federal contract opportunity

Other files attached to FIRE PREVENTION BILLBOARDS 2021, newest first.
File Type Posted
Sol_140L3921Q0063_Amd_0003.pdf PDF
Questions_and_Answers_0002.docx DOCX document
New_Bid_Schedule_all_Years_0002.pdf PDF
Sol_140L3921Q0063_Amd_0002.pdf PDF
DOL_WD_Douglas_and_Lyon_COs_NV.pdf PDF
Sol_140L3921Q0063.pdf PDF
DOL_WD_Story_and_Washoe_COs_NV.pdf PDF
DOL_WD_Clark_CO_NV.pdf PDF
Bid_Schedule_Fillable_all_Years.pdf PDF
DOL_WD_Carson_City_NV.pdf PDF
DOL_WD_Ny_CO_NV.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: Fire & Aviation Fire Prevention Billboards Administration: BLM Nevada State Office Location: Nevada State Statement of Work:

In concurrence with Secretarial Order 3336 and the National Cohesive Strategy, BLM Nevada has identified the need for wildfire prevention ad campaign messages to be posted on full-sized billboards throughout the greater area of Reno, Carson City and southern Nevada. The rationale behind this sign plan assures that the signs will be placed in areas highly visible to the public following the main arterial routes. This Statement of work is for 7 full-sized static and 2 digital billboards with the opportunity to rotate between 5-10 different messages. Graphic design and existing graphic re-sizing, vinyl production, installation fees and the option to change graphics (digital only) must be included in the quoted costs.

Rationale:

The rationale behind this sign plan assures that the signs will be placed in close proximity to specific areas identified by Nevada State Office as high-risk; having the potential for extreme and damaging wildfire behavior to grazing allotments, Sage Grouse LEKs, utility infrastructure and critical winter range for numerous species native to Nevada. Other criteria used to determine locations were that the messaging needed to be highly visible to the public following the main arterial routes.

Period of Performance:

Base Year: 16 continuous weeks starting 7/1/2021

Option Year 1:26 continuous weeks starting 6/1/2022
Option Year 2:26 continuous weeks starting 6/1/2023
Option Year 3:26 continuous weeks starting 6/1/2024
Option Year 4:26 continuous weeks starting 6/1/2025

Desired Locations

Billboard Size Specifications – 13-17 feet tall by 40-50 feet wide.

1. Location: Highway 395/I580 from Bordertown to Gardnerville

2. Location: I-80 from West Reno to Fernley

3. Location: Highway 50 from Carson City to Fallon

4. Hwy 160 near Pahrump; facing Northbound

5. Hwy 160 near Pahrump; facing Southbound

6. Location: I-15; 1 billboard facing Westbound between Las Vegas and the Utah border

7. Location: I-15; 1 billboard facing Eastbound between Las Vegas and the Utah border

8. Location: Digital billboard in Reno

9. Location: Digital billboard in Carson City

File details come from the government source that posted it. Updated .