This is a Statement of Work (SOW) for Fire and Smoke Door Inspection, Testing, Repair, and Certification Services at the VA Puget Sound Health Care System. The contractor shall provide comprehensive inspection, testing, repair, and certification services for fire and smoke door assemblies across the American Lake VA Medical Center (9600 Veterans Dr SW, Tacoma, WA 98493) and Seattle VA Medical Center (1660 S Columbian Way, Seattle, WA 98108) campuses in compliance with NFPA 80 and NFPA 105 standards. Services include swinging fire doors, swinging smoke doors, horizontal and vertical sliding fire doors, smoke doors, rolling fire doors, and all associated components including frames, hardware, closers, coordinators, hinges, latching devices, gasketing, and seals. The scope encompasses both interior and exterior doors across all buildings within both facilities.
The SOW establishes five primary tasks: (1) Initial Inventory Assessment to be completed within 45 calendar days of award, documenting all fire and smoke door assemblies in Microsoft Excel format; (2) Annual Inspection and Testing of 100 percent of inventoried assemblies per NFPA standards, with inspection reports due within 10 business days; (3) Deficiency Reporting identifying failures with NFPA code references and priority levels, due within 15 business days; (4) Repair Services to be completed within 30 calendar days of authorization with life-safety deficiencies reported within 24 hours; and (5) Certification and re-inspection following repairs, with certification reports due within 10 business days. Performance standards require 100 percent compliance for inventory completion, inspection completion, documentation accuracy, life-safety notifications, and 95 percent compliance for report submission and repair completion timelines. The contractor must comply with VA security protocols, including technician identification badges and physical security coordination, and shall furnish all labor, materials, equipment, and supervision. The Government reserves the right to conduct random inspections of at least 10 percent of inspected door assemblies annually, with any deficiencies identified requiring corrective action at no additional cost to the Government.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Contract Title
Fire and Smoke Door Inspection, Testing, Repair, and Certification Services
2. Background The VA Puget Sound Health Care System operates multiple healthcare, administrative, and support facilities located at the Seattle VA Medical Center and American Lake VA Medical Center campuses.
Fire and smoke door assemblies are critical life-safety components that must be maintained in accordance with National Fire Protection Association (NFPA) standards to ensure proper compartmentalization during fire and smoke events. The Department of Veterans Affairs requires annual inspection, testing, maintenance, repair, and certification of fire and smoke door assemblies to maintain compliance with NFPA 80, Standard for Fire Doors and Other Opening Protectives, and NFPA 105, Standard for Smoke Door Assemblies and Other Opening Protectives.
3. Scope.
The contractor shall provide all labor, materials, equipment, and supervision necessary to repair and certify fire and smoke doors across all buildings at the American Lake and Seattle VA Medical Centers that fail inspection and testing. This includes interior and exterior doors, with a focus on ensuring all swinging, vertical and horizontal fire doors meet NFPA 80 and NFPA 105 requirements through repair and certification of both sides.
Services shall include:
· Swinging fire doors
· Swinging smoke doors
· Horizontal sliding fire doors
· Horizontal sliding smoke doors
· Vertical fire doors
· Rolling fire doors
· Fire-rated door assemblies
· Smoke-rated door assemblies
· Frames, hardware, closers, coordinators, hinges, latching devices, gasketing, seals, and associated components
The Contractor shall perform all work in accordance with the latest adopted editions of NFPA 80, NFPA 105, applicable Joint Commission requirements, VA directives, manufacturer requirements, and local Authority Having Jurisdiction requirements.
4. Specific Tasks.
Task 1 – Initial Inventory Assessment The Contractor shall perform a comprehensive survey of all facilities and establish a complete inventory of fire and smoke door assemblies.
The inventory shall include:
· Building number
· Floor level
· Door identification number
· Door type
· Fire-rating or smoke-rating
· Door size
· Manufacturer (if available)
· Deficiencies observed
· Current operational status
The inventory shall be submitted to the COR electronically in Microsoft Excel format.
Task 2 – Annual Inspection and Testing The Contractor shall inspect and test 100 percent of inventoried fire and smoke door assemblies annually.
Inspection and testing shall be conducted in accordance with NFPA 80 and NFPA 105 requirements.
Inspection criteria shall include all applicable NFPA inspection points including, but not limited to:
· Door and frame condition
· Clearances
· Self-closing operation
· Positive latching
· Coordinator operation
· Hardware condition
· Label integrity
· Gasketing and seals
· Vision panel integrity
· Obstructions and field modifications
· Hold-open device operation
· Smoke seal integrity
The contractor shall provide all labor, materials, equipment, and supervision necessary to repair and certify fire and smoke doors across all buildings at the American Lake and Seattle VA Medical Centers that fail inspection and testing. This includes interior and exterior doors, with a focus on ensuring all swinging, vertical and horizontal fire doors meet NFPA 80 and NFPA 105 requirements through repair and certification of both sides.
Task 3 – Deficiency Reporting The Contractor shall provide a deficiency report identifying all failures discovered during inspection and testing.
The report shall include:
· Door identification
· Building location
· Deficiency description
· NFPA code reference
· Recommended corrective action
· Priority level The report shall be submitted within (15) business days of inspection completion.
Task 4 – Repair Services Upon VA authorization, the Contractor shall repair deficient fire and smoke door assemblies.
Repair services shall include all labor, materials, equipment, testing, adjustments, and replacement components necessary to restore door assemblies to compliant operating condition.
Repairs shall be completed within thirty (30) calendar days after authorization unless otherwise approved by the COR.
Any deficiencies that present an immediate life-safety concern shall be reported to the COR within twenty-four (24) hours.
Task 5 – Certification Following completion of repairs, the Contractor shall re-inspect, test, and certify repaired door assemblies.
Certification documentation shall verify compliance with NFPA 80 and NFPA 105 requirements.
Certification reports shall be submitted within ten (10) business days following completion of repairs.
Enterprise Management Controls.
The COR will focus on ensuring:
· Adherence to the contract’s scope of work (SOW)
· Timely completion of milestones and overall project schedule.
· Delivery of high-quality workmanship and materials.
· Compliance with VA standards, safety protocols, and environmental regulations.
Technical execution
· Verify material specifications and quality.
· Monitor Maintenance and repairs.
· Validate Testing.
5. Deliverables
| Deliverable |
| Due Date |
| Initial Door Inventory |
| Within 45 calendar days of award |
| Annual Inspection Report |
| Within 10 business days after inspection completion |
| Deficiency Report |
| Within 10 business days after inspection completion |
| Repair Completion Report |
| Within 10 business days after repair completion |
| Certification Report |
| Within 10 business days after certification |
| Updated Inventory Database |
| Annually |
6. Performance Monitoring
| Performance Objective |
| Standard |
| Acceptable Quality Level (AQL) |
| Inventory Completion |
| Complete inventory submitted within 45 days |
| 100% |
| Inspection Completion |
| Annual inspection completed within scheduled period |
| 100% |
| Report Submission |
| Reports submitted within 10 business days |
| 95% |
| Repair Completion |
| Repairs completed within 30 days of authorization |
| 95% |
| Documentation Accuracy |
| Reports contain required NFPA information |
| 100% |
| Life Safety Notifications |
| Critical deficiencies reported within 24 hours |
100%
QUALITY ASSURANCE SURVEILLANCE
The Government reserves the right to inspect contractor performance at any time.
The COR may conduct random inspections of at least ten percent (10%) of inspected door assemblies annually to verify compliance.
Deficiencies identified by the Government shall require corrective action at no additional cost to the Government.
7. Security Requirements The contractor shall comply with VA security policies as outlined in VA Form 2280, certified by the Information Security Officer (ISO). Security requirements include:
Identification: Technicians must wear VA-issued identification badges during work hours.
Access Control: The contractor shall coordinate with the VA Physical Security Manager to ensure access is limited to authorized areas and times.
Sensitive Information: No patient information or proprietary data will be accessed during this contract.
Tasks 1 and 2 involve access to hospital areas, requiring compliance with these security measures. The COTR will verify adherence to security protocols during performance monitoring.
8. Government-Furnished Equipment (GFE)
- No government equipment shall be provided for the execution of this contract.
9. Inspection and Acceptance Criteria
The COR is responsible for certifying that the work done under the contract is performed to time and standard.
10. Risk Control
- Disruption to Hospital Operations: Noise, vibrations, and shutdowns may interfere with hospital services.
- Infection Control: Dust, debris, or contamination from work areas may compromise sterile environments.
· Comply with all OSHA safety requirements.
· Immediately report accidents, injuries, property damage, or life-safety concerns.
11. Place of Performance.
9600 Veterans Dr SW, Tacoma WA 98493 and 1660 S Columbian way Seattle, WA 98108
File details come from the government source that posted it. Updated .