STATEMENT OF WORK
(PRODUCT)
GENERAL INFORMATION.
1.0 SCOPE OF WORK.
Features, Components, Accessories, Modules, Software and/or Services to be included:
2.0 BACKGROUND.
CONTRACTOR REQUIREMENTS.
3.0 TECHNICAL REQUIREMENTS/TASKS. Technical Specifications/Salient Characteristics:
4.0 GOVERNMENT FURNISHED.
5.0 DELIVERABLES/SCHEDULE.
KEY DELIVERABLES:
Item No. Deliverable Objective Due
6.0 TRAVEL.
7.0 CONTRACTOR’S KEY PERSONNEL.
8.0 SECURITY REQUIREMENTS.
9.0 DATA RIGHTS.
10.0 SECTION 508 – ELECTRONIC AND INFORMATION TECHNOLOGY STANDARDS.
11.0 SECTION 889 OF THE NATIONAL DEFENSE AUTHORIZATION ACT CERTIFICATION
Untitled
| Text1: Electric Boiler - Sussman |
| Text2: Provide a Sussman Model SSB180100F3L electric boiler or equivalent that can replace the one that was in use for ~20 years. The new unit has meet these requirements - |
1) It MUST be compatible with existing utility feeds (electricity, water, steam line, vent
2) It MUST be of same size or smaller (the area is congested)
3) It MUST supply at a minimum the amount of steam at the right temperature/pressure which the incumbent boiler provided (in order to meet the mission need).
4) All metal that makes contact with water MUST be made from stainless steel or other metal which will not corrode.
| Text13: Boilers have been in use for 100's of years to provide steam for various processes. In this lab, an independent boiler is required to meet research needs as a way to quickly heat samples at high shear. This allows the fast production of research materials. The lab had a Sussman lab boiler for nearly 20 years. This boiler was chosen as it met the research needs regarding steam attributes and fit in the allocated space. Small boilers are not as easily found. Many of these do not have stainless steel, are too large, do not provide sufficient steam or will not use the incumbent utility connections. After an exhaustive internet search, only Sussman, maker of incumbent boiler, will meet the requirements. |
| Text4: 1) Sussman Model SSB180100F3L electric boiler or equivalent |
| Text5: 2) |
| Text6: 3) |
| Text7: 4) |
| Text8: 5) |
| Text9: 6) |
| Text10: 7) |
| Text11: 8) |
| Text14: 1) Sussman Model SSB180100F3L electric boiler or equivalent |
| Text15: 2) One Year Warranty |
| Text16: 3) 480 volt 217 amp 3 phase wiring; Main on-off switch for manual control |
| Text17: 4) All parts that come in contact with water/steam will be made from stainless steel or other noncorrosive metal |
| Text18: 5) Exit steam piping (2” NPT); Low water cut-off control (float type to automatically maintain proper water level) |
| Text19: 6) Condenser tank system (drain valve 1” NPT) |
| Text20: 7) Output minimum of 542 lb/h steam or more at 50-60 F water feed |
| Text21: 8) Electric capacity 180 KW or more |
| Text22: 9) Design pressure 100 PSIG (Maximum operating pressure 80 PSIG) or more |
| Text23: 10) Horsepower (BHP) 18 or more |
| Text24: 11) Distilled water lines 1/2 “ NPT |
| Text25: 12) Dimensions (inches) cannot exceed - height 63, width 30, and length 38 |
| Text27: Government will be present during delivery. Government will hire a local firm to assemble and install the boiler. If needed, the government will supply a standard loading dock to accept delivery of the unit. The government will supply a location with suitable requirements (electricity, water) as needed to operate the instrument. Equipment will be delivered to 1815 North University Street, Peoria, Illinois. Given CoVid restrictions, additional requirements will be in place for entrance to the lab. These will be communicated with the equipment supplier. Attempts will be made to ensure that safety is met for all parties and the equipment delivered in a timely manner. |
| Text29: 2 |
| Text30: 3 |
| Text31: 4 |
| Text32: 5 |
| Text33: 6 |
| Text34: 7 |
| Text35: 8 |
| Text65: Not applicable, this is a purchase. |
| Text67: The boiler will be delivered to the lab, no company employees will be on site for install. Freight drivers must comply with NCAUR COVID-19 pandemic guidelines which may include the wearing of face masks (at present this is not required) and maintaining 6 foot social distancing. |
| Text68: N/A |
| Text66: Not applicable, this is a purchase. |
| Text69: This item is not considered to be a computer per ARS guidance. |
| Text70: Offeror will represent that: |
(1) It will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation.
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that It does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services.
| Text29a: |
| Text30a: |
| Text31a: |
| Text32a: |
| Text33a: |
| Text34a: |
| Text35a: |
| Text28a: Delivery of Boiler |
| Text28b: N/A |
| Text30b: |
| Text31b: |
| Text32b: |
| Text33b: |
| Text34b: |
| Text29b: |
| Text35b: |
| Text28: 1 |
| Text29c: |
| Text30c: |
| Text31c: |
| Text32c: |
| Text33c: |
| Text34c: |
| Text28c: No later than 120 days after purchase order is provided to the vendor |
| Text35c: |
| Text26: 13) |
| Text101: 14) |
| Text102: 15) |
| Text12: 9) |
| Text105: 10) |