SOW Eldridge Pool Painting 2026.pdf
PDF 632 KB Posted
- Attached to
- USMMA Outdoor Pool Re-painting
- Solicitation number
- MMAPR520726000106
About this file
Statement of Work Summary: Eldridge Pool Repair and Painting
This Statement of Work (SOW) describes repair and painting services required for Eldridge Pool at the U.S. Merchant Marine Academy in Kings Point, New York, for Fiscal Year 2026. The project is managed by the U.S. Department of Transportation Maritime Administration's Department of Public Works. The contractor must provide all labor, materials, transportation, tools, equipment, and supervision to complete the work in compliance with the Secretary of the Interior's Standards for the Treatment of Historic Properties (36 CFR Part 68) and Standards for Rehabilitation (36 CFR 67.7), as the Academy is listed on the National Register of Historic Places.
The primary deliverables include: cleaning and removing debris from the pool area; scraping and patching peeling and spalled concrete surfaces with suitable pool plaster; resetting or repairing stones around the pool edge where needed; painting approximately 5,000 square feet of pool surface with Insl-X Waterborne Semi-Gloss Swimming Pool Paint (WR-1023, Ocean Blue, or equivalent); and painting approximately 500 square feet of lane lines with Insl-X Waterborne Semi-Gloss Swimming Pool Paint (WR-1020, Black, or equivalent). Work must be completed prior to Memorial Weekend following Notice to Proceed, performed during normal business hours (0700-1630, Monday-Friday), and the contractor must maintain daily site cleanup and safety compliance. The contractor assumes responsibility for repairing any damage to existing facilities at no cost to the Government and must provide one-year warranties on all materials and labor, with equipment warranted per manufacturer specifications. Work will be performed at Eldridge Pool near the Academy's waterfront at 300 Steamboat Road, Kings Point, New York 11024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DOL Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
ELDRIDGE POOL REPAIR AND PAINTING
U.S. MERCHANT MARINE ACADEMY
KINGS POINT, NEW YORK
FY 2026
Prepared by DPW
U.S. DEPARTMENT OF TRANSPORTATION
MARITIME ADMINISTRATION
U.S. MERCHANT MARINE ACADEMY
BACKGROUND
The United States Merchant Martine Academy (USMMA) is an agency of the Maritime Administration (MARAD) managed by the United States Department of Transportation.
The USMMA is listed on the National Register of Historic Places. Therefore, all work shall be consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties (36 CFR part 68) http://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf.
All work shall meet or exceed the standards provided in the Secretary of the Interior’s Standards for Rehabilitation and guidelines for applying the standards published by the National Park Service, U.S. Department of the Interior 36 CFR 67.7 - Standards for rehabilitation.
SCOPE
The USMMA seeks a qualified and experienced contractor to provide labor, material, transportation, tools, equipment and supervision to perform painting services to Eldridge Pool.
Services include, but are not limited to, patching/repairing the pool surfaces, stonework and painting the pool surfaces.
DELIVERABLES
The Contractor is responsible for the following:
1. Patching and Painting Pool Surfaces
1.1. Clean and remove leaves and other debris from pool area.
1.2. Scrape and patch peeling and spalled concrete areas on the pool surfaces. Surfaces shall be scraped and cleaned for an application of a suitable pool plaster.
1.3. Reset / repair stones around the edge of the pool, where needed.
1.4. Paint pool surface. Paint shall be Insl-X, Waterborne Semi-Gloss Swimming Pool Paint, WR-1023, Ocean Blue, or equivalent. Approximately 5000 square feet.
1.5. Paint lane lines. Paint shall be Insl-X, Waterborne Semi-Gloss, Swimming Pool Paint, WR-1020, Black, or equivalent. Approximately 500 square feet. (see photos) http://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf
GENERAL
1. The contractor shall provide all labor and material, transportation and supervision in the performance of all tasks detailed in this statement of work.
2. All work is to conform to federal, state and local regulations and codes.
3. Maintain a work area compliant with safety standards.
4. Areas worked on shall be cleaned and secured on a daily basis.
5. Any damage to existing facilities or appurtenances shall be repaired or replaced in kind, by the contractor at no cost to the Government.
6. Examine existing conditions prior to any repair activities, site visit will be scheduled to inspect the site where services are to be performed.
7. Excess material and debris shall be disposed of in accordance with local and state ordinances.
8. No vehicles shall be driven on the sidewalks or grass.
9. Make every effort to minimize the impact to the daily routine of the Academy.
CLOSE OUT:
The contractor shall provide a signed warranty of any damage, defective material and improper workmanship on any material provided in this contract.
Materials and labor to be warranted for one year after installation, and equipment to be warranted per manufacturer
CONSIDERATIONS
• Maintain communication with the Contracting Officer’s Representative (COR) and immediately inform them of any unforeseen issues or problems that arise.
• Inform COR of any anticipated disruption in services at least three (3) days in advance.
PLACE OF PERFORMANCE
Contractor will perform the task at Eldridge Pool, located near the Waterfront at the USMMA, 300 Steamboat Road, Kings Point, N.Y. 11024
PERIOD OF PERFORMANCE
Work is to be completed prior to Memorial Weekend after NTP is approved. Work is to be performed during normal business hours 0700 to 1630, Monday through Friday unless approval is granted by the Contracting Officer.
| ELDRIDGE POOL REPAIR AND PAINTING |
| FY 2026 |
| U.S. DEPARTMENT OF TRANSPORTATION MARITIME ADMINISTRATION |
| BACKGROUND |
| SCOPE |
| DELIVERABLES |
| GENERAL |
| CLOSE OUT: |
| CONSIDERATIONS |
| PLACE OF PERFORMANCE |
| PERIOD OF PERFORMANCE |
File details come from the government source that posted it. Updated .