This document is a Statement of Work (SOW) for repairs needed to the Eastside and Westside Wastewater Treatment Plants (WWTPs) Influent Lift Stations and the Westside WWTP Equalization Basin Pumps at the Beltsville Agricultural Research Center (BARC) in Beltsville, Maryland.

The SOW outlines the scope of work, which includes investigating issues with the Eastside and Westside WWTP Influent Lift Stations, providing recommendations for repair or replacement of pumps and electrical/control systems, and replacing two of the three pumps in the Westside WWTP Equalization Basin. The work must be completed within 30 days of the award date. This is a total small business set-aside solicitation with a NAICS code of 221310 and a size standard of $41.0M. The solicitation includes two contract line items: one for the investigation and equipment replacement, and an optional line item for repairs to the Eastside and Westside WWTP Influent Lift Stations. Offers are due by April 22, 2024, and the Government intends to award without discussions but reserves the right to conduct discussions.

View the file

Other files for this federal contract opportunity

Other files attached to Eastside and Westside WWTPs, newest first.
File Type Posted
Questions and Answers.pdf PDF
Westside WWTP Influent Pump Station Pumps Data Plate 2.jpg JPG image
Westside WWTP Influent Pump Station Pumps Data Plate 1.jpeg JPEG file
Terms and Conditions - Revision 16APR2024.pdf PDF
Terms and Conditions.pdf PDF
SCA Wage Determination 2015-4281 Rev 28 26DEC2023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF AGRICULTURE

BELTSVILLE AGRICULTURAL RESEARCH CENTER

FACILITIES SERVICE

UTILITIES MANAGEMENT UNIT

BUILDING 426A, BARC-EAST

10300 BALTIMORE AVENUE

BELTSVILLE, MARYLAND 20705-2350

STATEMENT OF WORK

Eastside/Westside WWTP Repairs

To conduct repairs of the Eastside and Westside Wastewater Treatment Plants (WWTPs) Influent Lift Station and Westside WWTP Equalization

Basin Pumps.

BELTSVILLE AGRICULTURAL RESEARCH CENTER

BELTSVILLE, MARYLAND

March 2024

STATEMENT OF WORK

PROJECT LOCATION:

Beltsville Agricultural Research Center (BARC), Bldgs. 015, and 218, USDA, BARC Building 1180, Beltsville, Maryland.

PROJECT Number:

1120982

DESCRIPTION OF WORK:

1.0 GENERAL

1.1 Background

USDA has two wastewater treatment plants (WWTP), namely the Eastside WWTP and the Westside WWTP. Both plants influent lift stations have operational problems related to pumps and/or electrical and controls. The Westside WWTP also has problems with the equalization basin pumps.

1.2 Overview and Purpose of Statement of Work:

This SOW is to specify repairs needed to Eastside and Westside WWTPs influent pump stations and Westside WWTP equalization basin pumps.

2.0 ADMINISTRATIVE

2.1 Key Personnel

Name Phone E‐Mail Address Contracting Officer (CO) Roger Ammons roger.ammons@usda.gov Contracting Officer Representative (COR)

Jermaine Winstead

301‐504‐9817 jermaine.winstead@usda.gov

Administrative Officer

(AO)

Cheryl Miller 301-504-5438 Cheryl.E.Miller@usda.gov

Utilities Manager Abubaker Ashiwaya

301‐504‐8018 Abubaker.ashiwaya@usda.gov

2.2 Safety

2.2.1 The Contractor shall comply with all Federal, State and local laws pertaining to OSHA, fire safety, and environmental regulations.

2.2.2 The contractor shall comply with appropriate COVID-19 requirements established by the location.

3.0 SCOPE OF WORK:

3.1 Project Management

Project management activities for this project are limited to the following:

3.1.1 Coordination with the BARC Team on scheduling site visits and access to facilities requiring repairs.

3.1.2 Develop a work schedule to expedite this urgent work.

3.1.3 Prepare and submit invoices and progress reports to BARC Team

3.2 Itemized Repairs Scope

3.2.1 Investigate the problems at the Eastside & Westside WWTP Influent lift stations and other facilities as noted below.

3.2.1.1 The investigation team shall be available for a minimum of two full days at the plants to troubleshoot problems with the lift stations.

3.2.1.2 Assemble a team of mechanical and electrical experts to diagnose and provide estimates for repairs for the following:

3.2.1.2.1 issues with the Westside WWTP Influent lift station

3.2.1.2.2 issues with the Eastside WWTP Influent lift station

3.2.1.2.3 provide recommendations for repair and/or replacement of pumps and electrical and control systems with cost estimates.

3.2.2 Replace two of the existing three pumps at the Westside WWTP equalization basin.

3.2.2.1 If in-kind replacement is available, the contractor shall replace them with the same type of pumps, if existing pumps are not available, replace them with pumps having the same operating characteristics.

3.2.2.2 If different pumps are installed, the contractor shall evaluate the need to replace the existing guiderails and discharge elbows and if needed, replace them to fit new pumps.

3.2.2.3 The existing pumps have the following operating

characteristics:

Type of pumps: Submersible Pumps

Number of pumps: 3 (Replace 2)

Manufacturer: Pumpex

Design pump capacity: 70 gpm 13 feet of head

Discharge size: 4 inches

Pump minimum efficiency: 60%

Pump speed: 1160 RPM

Motor horsepower: 1 HP

3.2.3 Investigate problems and repair the existing Westside WWTP nonoperational treatment unit sludge airlift system. Start the unit and ensure all other unit equipment working condition.

4.0 OPTION 1

4.1 Eastside/Westside WWTP Influent Lift Stations Repair

4.1.1 Provide repair/replacement for the Eastside and Westside WWTP Influent lift station pumps and pumping system.

4.1.2 The replacement of pumps shall be with pumps having the same operational characteristics of the existing pumps.

4.1.3 Available O&M data for the systems will be available to the contractor.

5.0 PROJECT CONDITIONS AND SPECIFICATIONS

5.1 Project Coordination

5.1.1 Communications

5.1.1.1 All communications shall be through the Project CO and the Project COR

5.1.1.2 Acceptable forms of communications include Emails, Letters, and Telephone Memoranda

5.1.2 Period of Performance and Project Schedule

5.1.2.1 The period of performance of this contract shall be ONE Month from the date of the Notice to Proceed