STATEMENT OF WORK
REPLACE FLOORING
IN BUILDING 870
MALMSTROM AFB, MT
1. GENERAL
1.1. Summary of work: The contractor shall provide all labor, equipment, tools, accessories and materials to properly remove existing flooring and install approximately 3945 square feet of hard surface flooring, using the direct glue down method of installation, and approximately 851 linear feet of 4” cove base in building 870 on Malmstrom AFB, MT.
2. MATERIALS
2.1. The contractor shall provide all material to complete the installation in accordance with standard commercial practices. The hard surface flooring shall be Shaw Luxury Vinyl Tile Plank Style Solitude 0648V color Woodland (or equal). Cove base shall be 4” rubber of a complementary color (color must be approved by Facility Manager prior to purchase).
3. EXECUTION
3.1. The performance period will be 60 calendar days after award date. Working hours will be from 7:00 AM to 4:30 PM, Monday through Friday. The contractor’s on-site personnel are required to abide by all real world FPCON measures, RAMs, shelter-in-place, evacuations, lock-down notices as directed (i.e. mandatory badge / ID check, hand carried items will be searched, etc).
3.2. The contractor shall coordinate all his activities with Facility Manager, this facility will be in use during installation.
3.3. The contractor shall install the flooring as recommended by the manufacturer, using the direct glue down method. The contractor shall provide all materials required to clean, patch, level, and prepare substrate for the new flooring. Flooring shall be installed in the hashed out area on the attached floor plan. The current flooring to be removed is a mixture of broadloom carpet and VCT tile. Room 112 has a raised floor and will require an edge treatment on the step, the edge treatment shall be the same height as the flooring.
Installation must be performed in strict compliance with all local, state and federal regulations. The Occupational Safety and Health administration Hazard Communication Standard must be followed.
3.4. The government will inspect and accept the areas as the contractor completes them.
If any areas are found to be unacceptable when inspected by the government, the contractor shall re-perform until the newly installed area meets standard commercial practices.
3.5. Cove Base, Edge Guards and Transition Strips. The contractor shall provide and install aluminum bend-down type edge guard and rubber /vinyl transition strips for direct glue down where required. The contractor shall provide and install 4” rubber cove base of a complementary color.
4. CLEAN UP
4.1. Clean up of the job site shall be the responsibility of the installation contractor. The contractor will perform a final cleaning on all surfaces when completed.
4.2 Waste generated by the Contractor in performance of the services specified with this SOW shall be disposed of by contractor off base in compliance with State and Local ordinances.
Attachment 1-Floor plans Attachment 2- Room Square Foot legend Attachment 3- LVT Vinyl Plank cut sheet