SCOPE OF WORK
FORT THOMPSON HEALTH CARE FACILITY
SEWERAGE MAIN PIPING REPAIR/REPLACEMENT
ABERDEEN AREA INDIAN HEALTH SERVICE
SECTION I: GENERAL REQUIREMENTS
A. GENERAL SPECIFICATION
The contractor shall provide all plant, labor, materials, transportation, and supplies as needed for the complete removal and disposal of the existing cast iron piping in the crawl space and installation of a new 4 inch waste drain pipe and associated piping with PVC DWV piping. The work will include the installation of a sump system with pump to remove condensate water from the existing air handling units located in the crawl space.
All electrical wiring will be by others.
All other materials shall be removed and disposed of at an approved facility by the Contractor. The installation Contractor shall coordinate all work with the Facility Manager and Project Engineer.
All construction shall be in accordance with the most recent publications of the National Plumbing Code, South Dakota State Plumbing Code, National Electric Code, National Fire Codes, AIA Guidelines, IBC, and shall be in accordance with all Industry Health Facility Standards and/or requirements.
The Contractor shall perform the work with a minimum of disruption to the facility and if possible shall perform the work outside of regular business hours or perform the work on Saturdays. The contractor shall notify the Facility Manager a minimum of 2 days prior to commencement of work.
The work shall at a minimum consist of the following;
1. Remove and dispose of all the remaining cast iron waste and vent piping in the crawl space.
2. Disconnect the existing underground waste and vent piping and abandon in place.
3. Furnish and install new PVC waste and vent piping suspended in the crawl space.
Make one single connection to the existing underground piping where it exits the crawl space.
4. Furnish and install sump pits and pumps where required to collect condensate drains and misc. drains in the crawl space. Pump drain lines to be tied into overhead crawl space drain lines.
5. Electrical wiring to be done by others.
6. Costs will be based on supplied crawl space drawing.
B. SUBMITTALS
The contractor shall provide submittals to the Indian Health Service of piping materials being used.
C. DELIVERY SCHEDULE
The Contractor shall commence work within 14 days of notice of award. The installation shall be completed within 14 days of notice of award.
D. AS-BUILT DRAWINGS/O&M MANUALS
NOT APPLICABLE
E. TESTING AND CERTIFICATION
NOT APPLICABLE
F. INFECTION CONTROL & INTERIM LIFE SAFETY MEASURES
Contractor may be required to follow the requirements of an “Infection Control Construction Permit” which will be developed in conjunction with completion of an Infection Control Risk Assessment and Pre-Construction Risk Assessment as needed. The permit and life safety measures assessment will be provided to the Contractor following award of the task order as needed. Contact the Facility Manager when arriving on site. NOT REQUIRED
G. WARRANTY
Unless otherwise specified, the contractor shall guarantee all materials and equipment furnished and work performed for a period of one year from the date of completion of the plumbing repairs.
H. ADDITIONAL INFORMATION
The vendor shall provide personnel for the startup, training of facility maintenance staff and commissioning of the equipment as needed.